BPM and BSM Tune Measurements August 2, 2007 B. Cerio, R. Holtzapple.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Electron cloud tune shift measurements for long trains Tune Shift versus current: Measured the tune shift for 45 and 115 bunch positron trains with 14ns.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
CornellVideo Talk. Dec page 1 John Byrd Experimental studies of the fast- beam ion instability in the ALS- The Sequel John Byrd Lawrence Berkeley.
Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
E+ Tune Measurements for 4-ns Spaced Bunches Tune Measurements of 4-ns spaced bunches: An update of the strides made using the digital BPM system to measure.
BBI Compensation for CESR-c James A. Crittenden Machine Studies Meeting June 2, 2006.
Comparison of ECLOUD and POSINST Calculations of Coherent Tune Shifts with Emphasis on the Relative Drift and Dipole Contributions Jim Crittenden Cornell.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York ECLOUD Simulations for the Tune Shift Measurements of December.
ECLOUD Calculations of Coherent Tune Shifts for the April 2007 Measurements - Study of SEY Model Effects - Jim Crittenden Cornell Laboratory for Accelerator-Based.
ECLOUD Calculations of Coherent Tune Shifts for the April 2007 Measurements - Study of SEY Model Effects - Jim Crittenden Cornell Laboratory for Accelerator-Based.
Turn by turn horizontal and vertical positions at consecutive horizontally focusing quads 8W and 10W. Horizontal motion excited by horizontal shaker.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Recent Studies with ECLOUD Jim Crittenden Cornell Laboratory for.
CESR Beam-Beam Effects at CESR Mark A. Palmer Cornell University July 14, 2001.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
Witness Bunch Experimental Studies at CESR-TA Robert Holtzapple Alfred University/Cal Poly San Luis Obispo.
Frequency map analysis workshop - Orsay 1 - 2/04/04Mahdia Belgroune 1 Recent Experimental frequency maps at SLS and BESSY M. Belgroune PhD position (10/ /2004)
E- Cloud Machine Studies-Systematic Study of Single Bunch Tunes I. Pinger timing effect on single bunch tunes II. Vertical/horizontal pinger high voltage.
Recent electron cloud studies at CESR David Rice Cornell University Laboratory for Elementary-Particle Physics.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Electron cloud beam dynamics G. Dugan, Cornell University CesrTA Advisory Committee 9/11/12.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
Beam-Beam simulation and experiments in RHIC By Vahid Ranjbar and Tanaji Sen FNAL.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Effect of high synchrotron tune on Beam- Beam interaction: simulation and experiment A.Temnykh for CESR operating group Cornell University, Ithaca, NY.
Electron Cloud Measurement Summary for the April 2014 Run
Space charge studies at the SPS
e- Cloud Machine Studies-Tune Shift Studies
Beam-beam Effects in Hadron Colliders
Recent Electron Cloud Studies at CESR and Future Plans
Beam-beam effects in SPPC and future hadron colliders
The Effect of Poisson Data Weighting on Streak Camera Diagnostics
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
e+/e- Vertical Beam Dynamics during CHESS Operation-Part II
NanoBPM Status and Multibunch Mark Slater, Cambridge University
e+ Vertical Beam Size during CESR-c Collisions
e+/e- Vertical Beam Size during CESR-c Collisions
Electron cloud studies at CESR
e-/e+ Vertical Beam Dynamics with 6 and 12Wigglers On
e+ Vertical Beam Size during CESR-c Collisions
G. Codner, E. Tanke, M. Palmer Cornell University
e- Cloud Studies-Tune Studies with 45 Bunch Trains
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
Beam Size Flip-Flop Measurements
e+/e- Vertical Beam Size during CESR-c Collisions
Preliminary Analysis of April 24, 2006 CESR Bunch Measurements
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
Two beam coupling impedance simulations
Presentation transcript:

BPM and BSM Tune Measurements August 2, 2007 B. Cerio, R. Holtzapple

Introduction During CESR-c operation, with 26 bunches in the machine (9x3, and empty bunch in train 1 bunch 3), BPM tune measurements, as well as BSM beam size measurements, were made. The aim of the first BSM measurements was to calibrate the timing of the e- and e+ PMT arrays. To determine the timing setting that maximized the signal, time sweeps were done at PMT HVs of 380 V to 500 V in increments of 20 V for the positron system, and 400 V to 560 V in increments of 20 V for the electron system. Turn-by-turn BSM measurements over 1000 turns for two bunches were then made at each PMT HV with the timing that we determined in the calibration. In past CHESS tune measurements, a tune shift due to the electron cloud was observed. To test for similar dynamics in low energy operation, tune was measured with the BPM for all 26 bunches over 1024 turns. The beam was bumped in the vertical plane during BPM data acquisition to maximize the tune signal in the frequency domain. Beam size was measured with the BSM over 2048 turns immediately before the tune measurement. This procedure was done before and after three fills.

BSM West (e-) System fill - At this current (~2mA/bunch), the peak signal channel does not become saturated in this HV range. - The machine was filled between the 480 V and 500 V measurements.

BSM East (e+) System saturation Intensity fluctuations decrease due to saturation. - At this current (~2.3mA/bunch), the peak signal channel saturates at ~450 V. These points are not accurate, due to saturation.

BPM Tune Measurements: VAX vs. MATLAB In the past, tune was calculated from turn-by-turn BPM signals with VAX signal processing software. MATLAB software was recently written to calculate tune; however, if the tune calculated by the VAX software was compared to that calculated by MATLAB, there was a difference of between 200 and 400 Hz, which was unacceptably large compared to the resolution. Including more significant figures in the period of revolution appears to alleviate the discrepancy, as illustrated below. - The difference in vertical tune ranges from -60 Hz to 60 Hz - The difference in horizontal tune ranges from -80 Hz to 80 Hz. - These differences are much less than the resolution of ~381 Hz. - For the sake of consistency and convenience, tune calculations will henceforth be done with the MATLAB software.

BPM Tune Measurement: Fill 1 i) Electrons experience a negative shift of ~0.6 kHz in vertical tune along the train, which may result from the electron cloud effect or beam-beam interaction at IP. The decrease in tune along the train is not as predictable at low current, which is consistent with both electron cloud and beam-beam, warranting further experimentation to distinguish the dominant effect during CESR-c operation. Interestingly, the tune shift in CESR-c is comparable to the shift measured during CHESS. ii) Positron vertical tune first decreases and then increases along the train, perhaps a combination of parasitic crossing and electron cloud effects. iii) There is a positive shift of ~2.5kHz in positron vertical tune between high and low currents, which is probably a result of the beam-beam interaction at IP. iv) Vertical and horizontal tunes are nearly identical for electrons and positrons, due to transverse coupling. The beam was kicked in the vertical plane, so the measured horizontal tune is in fact the vertical tune.

BPM Tune Measurement: Fill 2 i) Results are consistent with measurements from the first fill. ii) Again positron tune is greater at high current, and electrons show similar behavior for this fill (tune increases by ~0.8 kHz). iii) Although the currents are comparable, positron tune shifts by ~0.8 kHz for this fill, whereas for the last fill it shifted by ~2.5 kHz. The operator must have adjusted the tune in the first fill to mitigate beam loss. iv) There was not a strong e+ horizontal tune signal, suggesting that transverse coupling is weaker in the positron beam (interesting because optics are the same for the two. Must be IP effect?).

BSM Beam Size Measurement: Fill 1 low high e-e+ beam loss i) There is a positive shift in beam size of electrons along the train. ii) Positron beam size typically increases and then decreases along the train. iii) During the BPM tune measurements, we experienced e+ beam loss due to high vertical pinger amplitude. iv) A negative tune shift corresponds to a positive beam size shift along the train, suggesting that we are near a high order resonance in tune space.

BSM Beam Size Measurement: Fill 2 low high e-e+ i) Results are similar to those from the first fill.