CesrTA Status and Plans Joe Calvey 10/15/08. CesrTA Status and Plans- CLIC08 Introduction CesrTA is a program to reconfigure the CESR storage ring at.

Slides:



Advertisements
Similar presentations
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Advertisements

Using Tune Shifts to Evaluate Electron Cloud Effects on Beam Dynamics at CesrTA Jennifer Chu Mentors: Dr. David Kreinick and Dr. Gerry Dugan 8/11/2011REU.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Modelling Cyclotron Resonances in ECLOUD 1) Comparison with CesrTA.
Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Recent Studies with ECLOUD Jim Crittenden Cornell Laboratory for.
ECLOUD Simulations for CESR Witness Bunch Tune Shift Measurements Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences and Education.
Experimental Plan for Achieving Low Emittance in CesrTA David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
49th ICFA Advanced Beam Dynamics Workshop October 8 –12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Results October 19, 2010 Mark Palmer for the C ESR TA Collaboration.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Emittance Measurement Needs for CesrTF M. Palmer Cornell University Laboratory for Elementary-Particle Physics.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
2008/7/281 ILCDR08 Report - Electron Cloud Session – Univ. Y. Suetsugu, KEK.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Electron cloud measurements and simulations at CesrTA G. Dugan, Cornell University 4/19/09 TILC09 4/18/09.
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
November 18, 2011David L. Rubin1 CESR Test Accelerator – Investigation of the physics of charged particle beams Circumference = 768m - Beam energy
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
01/08/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
CesrTA Electron cloud simulation update ILC 10 Workshop G. Dugan, Cornell 3/28/09 2/24/2016ILC 10 Workshop.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
2nd International Particle Accelerator Conference September 4–9, 2011, San Sebastián, Spain LEPP, the Cornell University Laboratory for Elementary-Particle.
ILC Damping Ring Test Facilities Status Report Mark Palmer Cornell University May 9, 2009 ILC PAC Review, Vancouver.
Damping Ring Session Summary S. Guiducci TILC09 Tsukuba 21 April 2009.
RFA Simulations Joe Calvey LEPP, Cornell University 6/25/09.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Low-Emittance Tuning at CesrTA Jim Shanks Cornell Laboratory for Accelerator-Based Sciences and Education.
Electron cloud measurements in Cesr-TA during the July-August run for the SPSU Study Team, report by S. Calatroni and G. Rumolo thanks to J.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Mark Palmer for the CESRTA Collaboration
Electron Cloud and Ion Experimental Program
Electron Cloud R&D at Cornell ILCDR08--7/8/08
CesrTA Status Report Mark Palmer July 8, 2009.
CesrTA Status and Planning
RECENT DEVELOPMENTS IN MODELING
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Recent Electron Cloud Studies at CESR and Future Plans
Low Emittance Tuning in CESR TA
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Code Benchmarking and Preliminary RFA Modelling for CesrTA
CesrTA Experimental Schedule and Priorities
Electron cloud studies at CESR
CesrTA Low Emittance Program David Rubin Cornell Laboratory for
CTA 09 - Introduction David Rubin Cornell Laboratory for
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

CesrTA Status and Plans Joe Calvey 10/15/08

CesrTA Status and Plans- CLIC08 Introduction CesrTA is a program to reconfigure the CESR storage ring at Cornell to perform experiments related to the ILC damping ring Two main areas of investigation: –Low emittance tuning Perform detailed survey and re-alignment of magnets Develop new analysis software Develop instrumentation to characterize ultra low emittance beams –X-ray beam size monitor –Upgraded BPM system Perform beam dynamics studies with electron and positron beams –Electron cloud studies Characterize cloud using simulation programs –Code benchmarking –Tune shift measurements –RFA comparisons Investigate different suppression techniques Develop tools to understand instabilities

CesrTA Status and Plans- CLIC08 Schedule Overview Planned schedule as of early this year –Phased implementation of instrumentation –Phased installation of electron cloud diagnostics and support hardware Some adjustments are being made –Avoid holiday running –Maximize efficient use of limited resources Exact running schedule TBD

CesrTA Status and Plans- CLIC08 “Run 2” “Run 2” was recently split into 2 pieces, 2a and 2b –Accommodates CHESS request –Removes stress of a single long dedicated CesrTA run –Adds time to think between CesrTA periods –Exact dates in 2009 still undergoing discussion (eg, how long do we want the January ’09 down to be? May want to add a short spring ’09 down for some hardware installation)‏ xBSM optics commissioning BPM system commissioning Beam-based alignment effort Test ultra low emittance lattice for first time Characterize electron cloud growth in chambers around the CESR ring (wigglers, dipoles and drifts)‏ CESR down through the holidays to minimize power use and manpower limitations

CesrTA Status and Plans- CLIC08 CESR Reconfiguration L3 Straight –Instrument large bore quadrupoles and adjacent drifts –Install of PEP-II experimental hardware (including chicane) in early 2009 –Provide location for installation of test chambers Arcs where wigglers removed –Instrument dipoles and adjacent drifts –Provide locations for installation of test chambers L0 Straight –All wigglers in zero dispersion regions for low emittance –Instrumented wiggler straight and adjacent sections CHESS line upgrades for x-ray beam size monitor –D-line this summer –C-line next year

July 8, 2008 ILCDR08 - Cornell University 6 L0 - Cutaway through CLEO iron showing L0 wiggler test string

July 8, 2008 ILCDR08 - Cornell University 7 L0 Program Overview October 2008 –Reconfiguration complete –First two instrumented wiggler chambers installed One control chamber (uncoated Cu surface) One chamber with TiN coating –Instrumentation support for a variety of EC experiments 2009 –Further development based on results of initial tests –Follow-on wiggler chambers for additional mitigation tests (targeting chamber #3 to be constructed with a clearing electrode) –5 GeV performance tests (requires addition of photon stop at end of L0 straight)

L3 CesrTA Status and Plans- CLIC08

RFAs Several different types of Retarding Field Analyzers are employed at CesrTA –“APS Style” Well understood- use as a baseline to compare with more novel designs 1 collector Deployed in L1 and L5 –Cornell “Insertable Segmented” RFAs 5 collectors- probe azimuthal distribution of cloud Deployed in L1 and L5 –Dipole RFAs Inserted in dipole chambers 9 collectors –Wiggler RFAs Deployed in L0 wigglers 3 collectors at different field strengths along wiggler CesrTA Status and Plans- CLIC08

July 8, 2008 ILCDR08 - Cornell University 10 SC Wiggler Replacement Chambers B12W Dipole Replacement Chamber Dipole RFA Instrumented Chambers Installed

October 8, 2008 CesrTA Status Report M. Palmer Wiggler EC Diagnostics RFAs assembled and checked for both VCs E-beam welding –1 st VC standard –2 nd VC TiN coated Installation into cryostats underway Installation into CESR ~Oct 23

Low Emittance Tuning Survey & Alignment –Complete network of survey monuments have been installed around the CESR tunnel –All CESR magnets have been measured with respect to network using laser tracker and digital level –Magnet mounting fixtures that permit precision adjustment are installed on all quadrupoles –Demonstrated during June run that we could reliably predict the effect on closed orbit and dispersion of ~100  m change in quadrupole offset –Survey network, digital level, and mounting fixtures provide for rapid correction of alignment errors CesrTA Status and Plans- CLIC08 ParameterValue E†E† 2.0 GeV N wiggler 12 B max 1.9 T  x (geometric) 2.3 nm  y (geometric) Target 5-10 pm 20pm  x,y 56 ms  E /E 8.1 x QzQz Total RF Voltage7.6 MV zz 8.9 mm  p N particles /bunch 6.2 x x  Touschek 10s of minutes Bunch Spacing Multiples of 4ns and 14ns Low Emittance Parameters

CesrTA Status and Plans- CLIC08 Low Emittance Tuning BPM upgrade –Digital bunch by bunch/ turn by turn BPM electronics and infrastructure is ready for installation –That installation will proceed in steps beginning after commissioning CesrTA optics Analysis software –Orbit response matrix Control system software for collecting differential orbit data has been tested Analysis of orbit differences (response) yields BPM tilts and shears Effectiveness of ORM has been limited by BPM resolution and irreproducibility and it will significantly improve with installation of new BPM electronics –AC dispersion Develop technique for measuring dispersion by exciting an energy oscillation and measuring amplitude and phase Software to automate AC measurement is ready for testing –Phase/coupling measurement and correction –Gain mapping

CesrTA Status and Plans- CLIC08 Low Emittance Tuning CesrTA low emittance optics We have low emittance optics designed for measurements at 2.0, 2.5, and 5.0GeV Accessible by collaborators in BMAD, MAD, or XSIF Optics will be commissioned during the October/November CesrTA run LatticeEnergy[GeV]WigglersB max [T]  x [nm] cta_2000_v8_ cta_2500_ cta_5000_v8_6wig_

X-Ray Beam Size Monitor Bunch-by-bunch measurements of beam profile for fast emittance determination Uses synchrotron radiation (installed at CHESS) Image bunches spaced by 4ns Transverse resolution < µm CesrTA Status and Plans- CLIC08

X-Ray Beam Size Monitor Different options for optics: –Traditional Fresnel zone plate –“Coded aperture” Mask used to modulate incoming light Resulting image must be deconvolved Can achieve up to 50% open aperture area Recent Progress –Upgrade of the positron x-ray beam line is complete (windowless line) –X-ray optics “Simple” optics (adjustable slit and 3 slit coded aperture) scheduled for installation 10/22-23 –X-ray detectors Detectors (from 3 different vendors) will be tested in October/November Readout software under development X-ray beam size measurement - Measurement of the size of the positron beam with few micron resolution beginning in January - Single bunch/single pass measurement May-June Coded aperture image courtesy of J. Flanagan Photodiode Array Singleton photodiode

09/25/08 CesrTA Collaboration 17 Electron Cloud Code Benchmarking 45 bunches, 14 ns spacing, 1mA/bunch ~factor of 2 agreement 9 bunches, 280 ns spacing, 5mA/ bunch; poor agreement “Benchmarking”: comparison of different simulations with canonical parameter sets Three codes: –POSINST (M. Furman, M. Pivi) –ECLOUD (G. Rumolo, F. Zimmermann) –CLOUDLAND (L. Wang) Programs can disagree significantly Possible sources of discrepancies: –Different SEY models –Different primary models Example: average density plots on right

09/25/08 CesrTA Collaboration 18 Code Benchmarking With no SEY and same primary angular distribution, match is essentially perfect –reduces worries about systematic or statistical errors –Needs to be verified for other beam conditions Situation is more complicated for SEY models POSINST has more detailed model than ECLOUD or CLOUDLAND –Includes “rediffused” component Different parameterizations can lead to divergent behaviour, even for “similar looking” SEY curves –Ex: cannot simply turn off rediffused in POSINST –Low energy behavior particularly important

Tune Shift Measurements Witness Bunch Method –Electron cloud is generated with a train of “loading bunches” –Cloud is probed at later times by measuring tune shift of “witness bunches” –The tune shift is a measure of the beam-averaged field gradient due to the cloud charge density at the time of the witness bunch. –Gives ring integrated field gradient due to cloud vs time Measurements taken in a variety of conditions –Electron & positron beams –1.9 GeV and 5.3 GeV –Various loading trains Measurements are compared to predictions based on cloud simulations (POSINST) CesrTA Status and Plans- CLIC08

Tune Shift Simulations Sum of tune shifts roughly proportional to beam averaged density of cloud: We run simulation separately for drifts and dipoles, add tune shifts together with appropriate ring weights It is necessary to include a number of corrections –Image charges –“Pinch effect” during bunch passage –“Dynamic effect” due to oscillation of electrons around beam By adjusting simulation parameters, we can fit the vertical tune shift well –Qualitative features (e.g. dip after generating train) maintained –Note that the “plausible” parameter space is quite large However, we haven’t been able to match the horizontal tune shift –Data are small, with large error bars Some concerns about integrity of data CesrTA Status and Plans- CLIC08

RFA Simulations We have lots of RFA data from June run RFAs provide direct measure of the cloud at a particular location RFAs themselves need to be simulated –Postprocessing output from cloud simulation codes –Data shows some idiosyncratic behavior Negative grid currents Collector currents that increase with retarding voltage! (see below) Three levels of detail –Rough analytic calculation Can be off by an order of magnitude –Recursive semi-analytical “simulation” Can include subtleties –SEY in the RFA –Electrons hitting inside of grids –Full particle tracking simulation Includes focusing effects of fields Cross check with semi-analytical model CesrTA Status and Plans- CLIC08

RFA Simulations Simulations roughly match data But, a few discrepancies… –Simulations overestimate total current (by up to a factor of 2) –Predict current spike in collector for low retarding voltage, which is not seen in data True in both semi-analytical and full particle tracking simulations Could the cloud simulation programs be generating too many low energy electrons? –Perhaps this could shed some light on the question of low energy SEY –Can make fit better by fiddling with parameters Grid efficiencies, SEY, etc. Preliminary example shown on right –APS RFA –Shows normalized current CesrTA Status and Plans- CLIC08

October 8, 2008 CesrTA Status Report M. Palmer Future plans Complete the code comparison (benchmarking) and fully understand the differences between the SEY models in ECLOUD, CLOUDLAND and POSINST. Improved model of the RFA response Fully include dynamic effects in tune shift calculations (requires integration of beam motion into the simulation codes). RFA’s to be installed in new wiggler chamber will allow measurement of cloud- induced current in a wiggler field. We need a 3D simulation code to analyze this. The present plan is to use WARP-POSINST, relying on our LBNL collaborators. Measurements of cloud-induced incoherent emittance growth can be made using XBSM. We need to estimate this in a simulation. Dependence of cloud effects on beam as a function of energy, species, bunch population, bunch spacing, and emittance, in alliance with the simulation program, can provide a comprehensive validation of the codes.

Contact Information General CesrTA or scheduling questions: –Mark Palmer: Low Emittance Tuning: –Dave Rubin: Electron Cloud Studies: –Mark Palmer: –Gerry Dugan: –Joe Calvey: More information at the CesrTA Wiki: –Main CesrTA Wiki Page: –CesrTA Collaboration Meetings Page: Can subscribe to the mailing list from the main CesrTA Wiki Page Potential overlap with CLIC CesrTA Status and Plans- CLIC08