February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
February 26, 2007 Global Design Effort 1 Most recent in Beijing BDS/IR talk, February 4, 2007:
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Contents Beam Dump Work Program submitted to UK funding agencies Motivation to study pressure waves Progress so Far -Energy Deposition -Pressure wave calculation.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
February 05, 2007 Global Design Effort 1 Beam Delivery System R&D S4 Task Force Chris Damerell, Hitoshi Hayano, Marc Ross Deepa Angal-Kalinin, Andrei Seryi,
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Philip Burrows BDS Kick-off Meeting, SLAC, 13/10/071 BDS Instrumentation Philip Burrows John Adams Institute, Oxford University Mike Woods SLAC Thanks.
Global Design Effort Beam Delivery System Summary Andrei Seryi, SLAC ALCPG/GDE meeting October 25, 2007.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Introduction D. Schulte for K. Kubo and P. Tenenbaum.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Beam delivery and ATF2 Andrei Seryi SLAC October 1, 2008.
Global Design Effort RTML KOM Close-out Ross, Walker.
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
ILC Beam Instrumentation – Introduction Remarks –
Plans towards CC in the LHC a US – centric perspective
What Should We Do?.
CLIC Study Aim Conceptual design report in 2010
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
CLIC-ILC BDS & MDI work.
Accelerator Physics Technical System Group Review
Beam Dump outline work plan (UK perspective)
Beam Delivery System Schedule at ILC2010
Andrei Seryi Materials for discussion TILC-08
Introduction / Comments on instrumentation issues
BDS EDR Discussion EDR Organisation? Discussion of WP distribution
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

February 4, 2007 Global Design Effort 1

February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution Suggested WPs BDS & Detector WPs etc.

February 4, 07 Global Design Effort IR&MDI: 3 EDR definition Clear definition of EDR is needed to define the schedule, milestones and deliverables Consider EDR as construction proposal, where –most critical system should have R&D mostly completed, drawings done and prototypes studied –for some other system, after initial R&D and feasibility demonstration at the end of EDR, R&D may still continue after EDR –more standard systems and components should have specs defined

February 4, 07 Global Design Effort IR&MDI: 4 Work Package distribution How WPs are distributed? For BDS, bidding for WP is not appropriate WPs are to be distributed in the process of pre-negotiation, optimization, evaluation by BDS team/consortium

February 4, 07 Global Design Effort IR&MDI: 5 WP development Yesterday’s discussion is a step in the process which is been developing already by many years, where BDS international team/consortium discussed, optimized and distributed work packages among the partners Formalization of the process and centralization of responsibilities (and funding) may be crucial –The S4 task force is a step to this direction The process should allow adjustments of WP and also allow new partners to join

February 4, 07 Global Design Effort IR&MDI: 6 WP, vertical & horizontal For many of the systems and WP, vertical (within the Area) responsibility and organization is appropriate For some system and WP, horizontal organization (across the areas) also has to be present I.e, matrix structure has to remain in some form

February 4, 07 Global Design Effort IR&MDI: 7 MDI aspects of WPs Many critical BDS and IR systems are dual functions, for BDS and Detector Will need to define, agree upon and follow the interfaces Description of interfaces would include all the needed parameters For example, description of the interface for FD would include –sizes, geometry description –requirements on stability of supporting detector surface –etc

February 4, 07 Global Design Effort IR&MDI: 8 Very high priority R&D => WPs Includes items which have major impact on operational performance & need substantial amount of R&D. –Development of IR superconducting magnets, their integration into the IR, and a design study to ensure their mechanical stability –Development of technical details of the push-pull design –Development of crab cavities, and related systems to provide phase stability –Measurements of collimator wakefield and their validation with codes –Study of collimator beam damage and damage detection –Accelerator physics design work which enable performance optimization –Design, construction, commissioning and operation of ATF2 –Development of laser wires for beam diagnostics –Development of intratrain feedback –Development and tests of MDI type hardware such as energy spectrometers and polarimeters –Development of beam dump design and study of beam dump window survivability …………..

February 4, 07 Global Design Effort IR&MDI: 9 WP and milestones Discussed many WP –Final Doublet prototype & FD stability –Crab system –ATF2 –Collimation –Laser wire –Feedback –Beam dumps –Instrumentation –Accelerator physics, etc.

February 4, 07 Global Design Effort IR&MDI: 10 Examples of WP and milestones Will show several examples below Final Doublet –WP formulated several years ago and is led by BNL Crab cavity work package –design and WP developed by crab cavity design team which include UK and US labs Beam dump work package –a particular example where very complete set of drawings and even approvals from agencies may be needed at the end of EDR Laser wire WP; Feedback WP; ATF2

February 4, 07 Global Design Effort IR&MDI: 11 FD WP Design and prototype of the long FD Stability study of FD A particular concern that funding situation, which pushed out the complete studies, e.g. stability study of the full prototype, would not allow for sufficient time and iterations for optimization of the design

February 4, 07 Global Design Effort IR&MDI: 12 Crab cavity WP & milestones Phase control and cavity synchronisation systems – (Milestone 1) Q Input Coupler – Development, prototyping and testing (Milestone 2) Q L/S/HOM couplers – Final designs & prototypes for beam tests. (Milestone 3) Q Frequency tuner - (Milestone 4) Q Crab Cavity –fabricated, & integrated into cryomodule. (Milestone 5) Q Cryomodule - A full engineering design (Milestone 6) Q Roll tuner and cavity positioning - (Milestone 7) Q Final Phase control and cavity synchronisation electronics system –improvement of the phase control system (Milestone 8) Q High power testing of cavity with beam (Milestone 9) Q Testing of two cavities with beam (Milestone 10) Q1 2010

February 4, 07 Global Design Effort IR&MDI: 13 Dumps & Collimators milestones FLUKA/EGS Energy deposition studies complete Design study of candidate window materials. Design and optimisation of geometry of window for water dump in order to minimise thermal fatigue, pressure and shock wave stresses. Estimation of window lifetime with reference to radiation damage. Specification, design and participation in on-line experiments using electron beams to simulate power deposition, thermal and stress wave profiles in prototype window materials Design and full model of internal water circulation system within beam dump vessel using Computational Fluid Dynamic codes in order to maximise efficiency of heat transfer and minimise possibility of local boiling. Outline design of remote handling systems for replacement of critical components e.g. window, de-ionising system and catalytic recombination components. Specification of services requirements for all beam dump specific items. Full costing of baseline design, in accordance with GDE guidelines Package of documentation suitable for pre-construction regulatory agency approval

February 4, 07 Global Design Effort IR&MDI: 14 Towards a 1  m LW Wavelength266 nm Mode Quality1.3 Peak Power20 MW FF f-number1.5 Pointing stability 10  rad M 2 resolution1% Normalisation (  ) 2% Beam Jitter 0.25  BPM Resolution20 nm Energy spec. res10 -4 Goals/assumptions EE 2.5 E point 2.2 E jitter 5.0 E stat 4.5 EM2EM2 2.8 Total Error8.0 Resultant errors/10 -3 Could be used for  measurement → E  Final fit, including dispersion preliminary Milestones of laser wire WP

February 4, 07 Global Design Effort IR&MDI: 15 Milestones for Feedback WP Finish intra-train IP prototype work and finalise EDR design Design complete system (via simulations): BDS / end of linac trajectory FB (3 MHz) BDS orbit FB (5 Hz) IP collision FB (5 Hz + 3 MHz) IP luminosity FB (3 MHz) Feed-forward systems? Specify hardware locations, # loops etc, define performance specs for hardware: BPM resolution, kick strength … Understand integrated FB performance machine-wide (linacs, RTML …) Engineering designs of all components

February 4, 07 Global Design Effort IR&MDI: 16 ATF2 goals (A) Small beam size Obtain  y ~ 35nm Maintain for long time (B) Stabilization of beam center Down to < 2nm by nano-BPM Bunch-to-bunch feedback of ILC-like train Test area for various BDS hardware and methods Start of beams in ~Oct 2008 ATF2

February 4, 07 Global Design Effort IR&MDI: 17 Transformation of BDS group to EDR BDS group, during many years, defined and started to work on subsystems or tasks, which one can now call Work Packages BDS group can naturally transform to EDR phase, with more formal structure and centralized responsibilities Structure of the center, its functions and parameters are critical for the overall efficiency and success