T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
T1 status and plans INFN Genova November 2014 Collaboration Meeting.
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd  Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi,
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
Walls crates cables gas chambers electronics CERN adb.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
V. Bobillier1 Cable installation status.
Dec
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Installation of the T600 at Fermilab
Introduction Status before the 2009 run Results from the 2009 run
HF Test station at P5 A.Mestvirishvili.
RD51-WG X June test beam experience: useful information for October
ELENA electron cooler and SEM grids status
Far Detector Activities Late 2017 – Early 2018
10/month is the present production rate 2 FTE + sporadic contributions
CSC Electronics Installation and Commissioning CSCE I&C
The digital read-out for the CSC system of the TOTEM experiment at LHC
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

T2 Status Report IP5 Installation Future plans

IP5 installation The mechanical structure has shown problems on installation and should be changed slightly The some structure has been bent by CMS magnetic field, we need to rethink it more deeply

IP5 Installation 1/4 T2 has been insatalled in IP5 (position - far) in front of Castor The elctronics control is working in all 10 chambers, but we lost one arm in chamber 10 and one pad Vfat in chamber 9, means 9 Vfats due to control loop. Daq tested in 555 lab only

IP5 Installation Gas tightnes of the detector tested before installation, and after. We see a small leak on line 4 FAR [-] 0 HG15 1 HG10 HG9HG20 IP5CASTOR HG33HG16HG19HG13HG18HG12 FAR [-] GAS LINE 1 GAS LINE 2 GAS LINE 3 GAS LINE 5 GAS LINE 4

IP5 Installation LV tested HV tested, one HV line in connector cable bad Chambers tested with 58V to see if properly connected

IP5 Installation Cooling: –Chiller installed the last day just before closing, and not tested –There is still a small leak, the pipe test has been done with CO2 and with 4 bar pressure after 3 hours we see 300 mbar leak. –Water not yet flown there

What next We need an urgent inspection on the installed quarter to see the damages. We need really to rebuild the mechanics and correct several small problems mainly on gas and cooling. Try to recover the missing Vfats.

Next steps Second quarter almost ready in Leszek lab, it is missing the 11th card 4 good 11th cards are arriving next week here at CERN and will be shipped to Italy for the components mounting Hopefully in 2 weeks we can start the commissioning of second telescope

Hybrids We need soon the second set of Hybrids for the second telescope Pisa is ready to start glueing and bonding. If enough hybrids are made we can have it ready and tested before Christmas.

Second telescope All chambers are almost ready in Helsinky These will be prepared all in Finland with the proper shielding and then shipped here to be assembled The electronics should be ready and tested then.

Final Installation We need to be prepared for the installation some time before the CMS closes. We cannot afford an unsafe, always critical, and in emergency, installation as it was with the first quarter. We need to push our people to do things in advance and have enough time to test the detectors before going in the pit.