A discrete event system: the CMS Tracker interlock Icaleps 2005 Icaleps 2005 Andromachi Tsirou, CERN The CMS Tracker interlock system The CMS Tracker and.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
André Augustinus 16 June 2003 DCS Workshop Safety.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
The Detector Control System for the ATLAS SemiConductor Tracker
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
ACES 2011 The third common ATLAS CMS Electronics Workshop for LHC upgrades March 9-11, 2011, CERN, Geneva, Switzerland Hardware:  ATMEL ATmega128 microcontroller.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
Hall C’s HMS PLC Controls by Steven Lassiter. What Constituents a PLC System PLC (processors) Programming. I/O modules. Field Device Signals (sometimes.
SCADA and Telemetry Presented By:.
DSS Advisory Board Christoph Schäfer Rack Safety System.
Thermo-mechanical infrastructure: Environmental Monitoring with FOS AIDA WP9.3 meeting November 21 th DESY, Hamburg. David Moya Martin Instituto de Física.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
Electrical and Optical Cables Installation at P5 What When How H. Breuker
André Augustinus 16 September 2002 Safety issues.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Home Guard Security System. Introduction & Basic Ideas Home Guard Security System.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
System implementation of a power distribution scheme based on DC-DC converters F.Faccio, G.Blanchot, S.Michelis, C.Fuentes, B.Allongue, S.Orlandi CERN.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
60kW Thermosiphon control system
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
1 Single event upset test of the voltage limiter for the ATLAS Semiconductor tracker TSL Experiment Number: F151 distance between power supplies and modules.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
Progress in the Development of Evaporative Cooling Systems for the ATLAS Inner Silicon Tracker G. Hallewell 1 and V. Vacek 2 1 Centre de Physique des Particules.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
Tracker Control System – TCS & Tracker Safety System – TSS of CMS
Tracker Control System – TCS & Tracker Safety System – TSS of CMS
Interlock L.Lanceri /INFN Trieste VXD Workshop, Pisa 03/10/2014
Vertex Detector Mechanical R&D Design Questions and Issues
Need for Alignment Position of off-momentum proton w.r.t. beam
Robert Gomez-Reino Garrido
Presentation transcript:

A discrete event system: the CMS Tracker interlock Icaleps 2005 Icaleps 2005 Andromachi Tsirou, CERN The CMS Tracker interlock system The CMS Tracker and its environmentThe CMS Tracker and its environment The interlock system and its role in our work frameThe interlock system and its role in our work frame Input sensors and conditioning cardsInput sensors and conditioning cards Outputs, system modularity and hardware integrationOutputs, system modularity and hardware integration Information flow, communication and software integrationInformation flow, communication and software integration StatusStatus ConclusionsConclusions

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN The CMS Tracker

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN The CMS Tracker 3 sub detectors 6 partitions 10 7 readout channels 8,000 voltage channels >10 5 monitoring channels Power dissipation ~50 kW

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN The CMS Tracker

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN The Tracker’s environment The Tracker will have to be maintained at <-10 0 C, while its surrounding environment will be at ~18 0 C. The Tracker will be exposed to irradiation doses foreseen to be between 10 and 65 kGy and neutron and charged particle flows ranging from to particles/cm 2. The Tracker will share the CMS experimental cavern environment and resources. Power losses will be unavoidable as will be other harmful incidents (fire, flooding, etc).

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN The Tracker’s environment The Tracker has to be protected from temperature excesses;The Tracker has to be protected from temperature excesses; Temperature interlock The Tracker has to be protected from the presenceThe Tracker has to be protected from the presence of humidity. of humidity. Humidity monitoring The Tracker has to be protected from repeated powerThe Tracker has to be protected from repeated power on/offs; the power should be switched on and off in a predefined sequence. Power control The Tracker has to be protected from all cavernThe Tracker has to be protected from all cavern environmental hazards. DSS connection TheThe Tracker has only control over its own power.

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN The Interlock system must: Protect the Tracker by switching power off in theProtect the Tracker by switching power off in the “correct” method and in time; Evolve with the Tracker; accompany it during theEvolve with the Tracker; accompany it during the testing/integration period and during all its life at testing/integration period and during all its life at LHC. LHC. Have optimized sensor/interlock resolution.Have optimized sensor/interlock resolution. Be able to be integrated to the CMS experiment on time.Be able to be integrated to the CMS experiment on time.

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN The inputs conditioning only at ~100m conditioning only at ~100m The sensor requirements: radiation tolerant, tiny (mm) no magnetic field effects (4T) no magnetic field effects (4T) The temperature sensors : pt1000s,thermistors ( 3types ) The humidity sensors : radiation tolerant, able to sustain magnetic field. Digital inputs from “external” sensors

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN The inputs The sensor signals travel inside the Tracker on specially designed “control” cables ( ~1,600 ) for 100m in order to enter in the control system.The sensor signals travel inside the Tracker on specially designed “control” cables ( ~1,600 ) for 100m in order to enter in the control system. The thermistor and humidity sensor signals have to beThe thermistor and humidity sensor signals have to be conditioned before entering the readout of the control conditioned before entering the readout of the control system; the conditioning systems have to be under the system ; the conditioning systems have to be under the surveillance of the control system. surveillance of the control system.

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN The Outputs The output of the control system logic is distributed to the 200 power supply crates of the Tracker in the form of interlock signals;The output of the control system logic is distributed to the 200 power supply crates of the Tracker in the form of interlock signals; The power supplies provide bias both for the detectors and for the readout electronics chain.The power supplies provide bias both for the detectors and for the readout electronics chain. Each crate accepts up to four different interlock signals;Each crate accepts up to four different interlock signals; The granularity of action is that of a crate.The granularity of action is that of a crate. There is a hierarchical way of distributing the interlock.There is a hierarchical way of distributing the interlock.

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN The inputs : numbers Temperatures ~800 ~800 RH ~200 Other ~ 100 The control system (based on PLCs of the SIMATIC S7-300 family) S7-300 family) The Power Supply Read inputs Do logic Set outputs

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN System modularity-hardware integration TEC1 TEC2 TIB1 TIB2TOB2TOB1 Tracker Thermal screen

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN We try to treat the Tracker control system as a Discrete Event System. A Discrete Event System is a discrete-state, event-driven system, that is, its state evolution depends entirely on the occurrence of asynchronous events over time. We treat the Interlock system as such. EVENT: should be thought of as occurring instantaneously and causing transitions from one discrete state value to another. E.g.: a cable is disconnected; a cooling line gets clogged or a dry air pipe blows up. DES

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN GRAFSET

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN hardwired via DCU readout Information flow, communication and software integration cond. DB Measurements DCS layer (Diagnostic & Reconfiguration ) Drivers Hardware DCU Plotter (java) cond. DB DCU Filtre (XDAQ) DCU Filtre (XDAQ) DCU Filtre (XDAQ) i2o conf. DB DCU Thread FecSupervisor (XDAQ) DCU Thread FecSupervisor (XDAQ) DCU Thread FecSupervisor (XDAQ) PLC Plotter (java) PLC PLC Filtre (XDAQ) PLC T, H, other systems T, V, I Measurements

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN Status & Conclusions The Six large systems have to start being delivered in January Three shall remain for integration tests at CERN and three shall be shipped to laboratories outside CERN. They shall return “home” in order to form the control racks of the CMS Tracker.The Six large systems have to start being delivered in January Three shall remain for integration tests at CERN and three shall be shipped to laboratories outside CERN. They shall return “home” in order to form the control racks of the CMS Tracker. Six miniatures of the large systems are being deployed at CERN and in existing laboratories for more restricted roles but with exactly the same I/Os and functionalities.Six miniatures of the large systems are being deployed at CERN and in existing laboratories for more restricted roles but with exactly the same I/Os and functionalities. We are very tight on time schedule because we would like to have everything completely operational by spring 2006.We are very tight on time schedule because we would like to have everything completely operational by spring 2006.

A discrete event system: the CMS Tracker interlock Andromachi Tsirou, CERN Status & Conclusions The CMS Tracker infrastructure and environmental controls are fully based on standard industrial hardware. Although we needed to proceed to certain developments in order to integrate those standards to the general software and other requirements of a large HEP sub detector, the overall modularity, scalability and the up to now performance are satisfactoryThe CMS Tracker infrastructure and environmental controls are fully based on standard industrial hardware. Although we needed to proceed to certain developments in order to integrate those standards to the general software and other requirements of a large HEP sub detector, the overall modularity, scalability and the up to now performance are satisfactory.