Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 1 Status of Aerogel Reconstruction –Track association implemented in CGL. –Raw data (ADC, TDC)

Slides:



Advertisements
Similar presentations
Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
Advertisements

PHENIX High pt Upgrades Recent Progress Yasuo MIAKE For High pt Upgrade Team
1 N. Davidson E/p single hadron energy scale check with minimum bias events Jet Note 8 Meeting 15 th May 2007.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
STAR J/  Simulations for RUN III Manuel Calderon for the Heavy-Flavor Group Analysis Meeting at BNL October 23, 2002.
July 28, Mechanical Design of the Cell - M. Konno, Univ. of Tsukuba 1 1.Introduction Requirements 2.Details description Design parameters, Cell Design.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
QM2006 Shanghai, China 1 High-p T Identified Hadron Production in Au+Au and Cu+Cu Collisions at RHIC-PHENIX Masahiro Konno (Univ. of Tsukuba) for the PHENIX.
Current Status of Hadron Analysis Introduction Hadron PID by PHENIX-TOF  Current status of charged hadron PID  CGL and track projection point on TOF.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Status of Aerogel detector for high pT upgrade at PHENIX Budget from US-J project for next two years : (1) 400 liters of Aerogel (2) 600 photomultiplier.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
PHENIX DC meeting Oct / 10 / 2001 Status of T0 counter DC meeting, Oct / 10 / 2001 T. Chujo, A. Danmura, S. Esumi, A. Kiyomichi, Y. Kuroki, H. Masui, Y.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Multi-strange Baryon Correlations in p+p and d+Au Collisions at √s NN = 200 GeV Betty Bezverkhny Yale University For the Collaboration Hot Quarks ’04,
Search for High-Mass Resonances in e + e - Jia Liu Madelyne Greene, Lana Muniz, Jane Nachtman Goal for the summer Searching for new particle Z’ --- a massive.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Extended Pid in PHENIX (assembly and integration ) 7/28/03 CDR review 07/28/2003, presented by E.Kistenev.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
1 Report on PHENIX work in Apr/May/Jun Kotaro Kijima 大西洋~
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.
Particle identification by energy loss measurement in the NA61 (SHINE) experiment Magdalena Posiadala University of Warsaw.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Masashi Kaneta, RBRC, BNL 2003 Fall Meeting of the Division of Nuclear Physics (2003/10/31) 1 KANETA, Masashi for the PHENIX Collaboration RIKEN-BNL Research.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Yonsei – Tsukuba Workshop / Hiroshi Tsuruoka / Aug 1 Current Status of TOF Analysis 1. PHENIX 実験とは 2.なぜ新たな検出器が必要か? 3. Time Zero Counter の設計 4.テスト実験(
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
TOF detector in PHENIX experiment PHENIX time-of-flight counter The PHENIX time-of-flight (TOF) counter serves as a particle identification device for.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Analysis Meeting, November 9-11, 2003 Manuel Calderón de la Barca Sánchez Heavy Flavor Working Group Heavy Flavor in ‘04: Prospects for J/ . Heavy.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Direct Photon v 2 Study in 200 GeV AuAu Collisions at RHIC Guoji Lin (Yale) For STAR Collaboration RHIC & AGS Users’ Meeting, BNL, June 5-9.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
PreShower Characterisations
HF Test station at P5 A.Mestvirishvili.
Tracking results from Au+Au test Beam
Charles F. Maguire Vanderbilt University
CLAS12 software workshop
High-pT Identified Hadron Production in Au+Au and Cu+Cu Collisions
Status of the TOF Detector
Development and Construction of PHENIX Aerogel Cherenkov Detector
Scaling Properties of Identified Hadron Transverse Momentum Spectra
High-pT Identified Charged Hadrons in √sNN = 200 GeV Au+Au Collisions
Identified Charged Hadron
Identified Charged Hadron Production at High pT
Presentation transcript:

Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 1 Status of Aerogel Reconstruction –Track association implemented in CGL. –Raw data (ADC, TDC) included in PHCentralTrack. –Need to add some information of the adjacent 8 cells with track- associated cell in nanoDST, in order to take care of particle passing through multiple cells. Calibration –Gain parameters for ADC obtained from LED and real data. –Timing calibration will be done with MinBias nanoDSTs. Construction for Run 5 Aerogel Detector has been installed in PHENIX for Run 4. (North-side Half Sector) Updated

Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 2 Kaons and protons still not seen clearly. - Track matching - RICH-veto - EMC energy cut ( >0.2GeV) Peak position (Npe) Npe vs. Momentum (62.4 GeV AuAu, Min-bias ~8M events)

Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/ – – – – - – – 3.2 Npe ~ 16 pe Npe distributions – Momentum slices [GeV/c] (62.4 GeV AuAu, Min-bias ~8M events)

Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 4 Preparation of Integration (80 boxes with 160 PMTs) at 510-HighBay Construction of South-side Half Sector All parts, except for additional Aerogel itself, are now at BNL. - Aerogel tiles (~1080 tiles, n=1.0120) at BNL. - Aerogel tiles (~700 tiles, n=1.0112) will be delivered to BNL by mid-May. Construction procedure is reviewed with last year’s experiences. Box Mechanical Assembling has been started in April. It will take ~2 months grad. students will come to BNL from Tsukuba. - Help of Dubna people (technicians). - Help of technicians (BNL). Completion of Assembly (Target: end of June) Install South-side Aerogel Racks Install South-side Aerogel Sector (Target: Aug/2) South-side half (Run 5-) North-side half (Run 4-)

Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/ Making holes on PC-boards [80/80] - HV Isolation Treatment (PMT) – Kenny helps [90/160] - Inner Box Assembly [39/80] - Mechanical Pre-Assembly (Lid) [20/80] - Mechanical Box Assembly [0/80] - Light Shielding [0/80] - Load Boxes to Half-Sector Frame [0/80] - Build N2 distribution  Need Help - KERPEN-HV Cable Assembly [0/8]  Need Help - Gas Flow Test - HV, Signal (PMT->Preamp), LED Cables - Light Leak Check and Cure  Time-consuming ! - Testing of Signal - Transport to Installation into W1 Sector - Preparation of FEM - Readout Test -- Major Things to do --

Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/ One issue raised up; HV strain relief (LeCroy) seems to be hard to find in the lab. The minimum of purchase is 250, but we just need 16 sets. -- Others -- From Dubna (5/20 ~, 1 month) - I. Migulina - V. Ivanov - A. Litvinenko From Tsukuba - M. Konno (~5/20) - S. Takagi (4/4 - 6/25) - S. Kato (5/25 - 6/24?) - S. Sakai (5/10? - 6/30?) - M. Inaba (6/19 - 7/18) - M. Shimomura (5/10? - 8/5?) -- Manpower --