G070550-00-I Enhanced LIGO Update Rana Adhikari July ’07 LSC Meeting.

Slides:



Advertisements
Similar presentations
G v1 H1 Squeezer Experiment Update L-V Meeting, Caltech, March 18, 2009 ANU, AEI, MIT, CIT and LHO Ping Koy Lam, Nergis Mavalvala, David McClelland,
Advertisements

G v1 Squeezer Update Review February 9, 2010 H1 Squeezer Experiment ANU, AEI, MIT, CIT and LHO collaboration.
LIGO Laboratory1 Thermal Compensation Experience in LIGO Phil Willems- Caltech Virgo/LSC Meeting, Cascina, May 2007 LIGO-G Z.
Marcus Ng Mentor: Alan Weinstein Co-mentor: Robert Ward
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
LIGO-G M Photon Calibrator DRR & CDR: Response to Reviewers’ Report Phil Willems, Mike Smith.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
Jan 29, 2007 LIGO Excomm, G R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
G v1 Squeezer Update Review August 25, 2009 H1 Squeezer Experiment ANU, AEI, MIT, CIT and LHO collaboration.
G D Tasks After S3 Commissioning Meeting, Oct 6., 2003 Peter Fritschel, Daniel Sigg.
G v3 Integration Planning April 25, 2011 Valera Frolov, Daniel Sigg, Peter Fritschel NSF Review, LLO.
1 LIGO-G D LIGO Commissioning PAC Meeting, 18 May 2005, LIGO Livingston Joe Giaime, LSU & LLO, for the entire commissioning team. PAC Meeting,
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
LIGO-G D Installation and Commissioning Status Stan Whitcomb Program Advisory Committee 14 June 2001 Caltech.
Design of Stable Power-Recycling Cavities University of Florida 10/05/2005 Volker Quetschke, Guido Mueller.
G D Commissioning Report P Fritschel LSC meeting, LHO 15 Aug 2005.
LIGO-G Z LIGO Commissioning Report LSC Meeting, Hanover August 19, 2003 Peter Fritschel, MIT.
LIGO- G R 40m Progress, LSC meeting, 3/031 40m Laboratory Upgrade Progress Report Osamu Miyakawa, Caltech 40m Technical Advisory Committee LIGO-G R.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
LIGO-G Advanced LIGO Detector upgrade is planned for »Factor of 10 increase in distance probed (‘reach’) »Factor of 1000 increase in event.
Squeezed light and GEO600 Simon Chelkowski LSC Meeting, Hannover.
Enhanced LIGO with squeezing: Lessons Learned for Advanced LIGO and beyond.
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 DC Readout Experiment at the Caltech 40m Laboratory Robert Ward Caltech Amaldi 7 July 14.
LIGO-G D Commissioning, Part II PAC 12, June 2002 Peter Fritschel, LIGO MIT.
LSC August G Z Gingin High Optical Power Test Facility (AIGO) 1 High Optical Power Test Facility - Status First lock, auto-alignment and.
G D Commissioning Progress and Plans Hanford Observatory LSC Meeting, March 21, 2005 Stefan Ballmer.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
G I Retrofitting Strategy after S5 Rana Adhikari.
LIGO Laboratory1 Thermal Compensation in LIGO Phil Willems- Caltech Baton Rouge LSC Meeting, March 2007 LIGO-G Z.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
G I Interferometer Improvements after S5 Rana Adhikari.
LIGO- G Z LSC meeting at Baton Rouge, March Caltech 40m Lab Update LSC Meeting Baton Rouge Mar 21, 2007 Robert Ward, Caltech and the 40m.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
G D LIGO Commissioning Update LSC Meeting, March 16, 2004 Peter Fritschel.
LIGO-G R DC Detection at the 40m Lab DC Detection Experiment at the 40m Lab Robert Ward for the 40m Lab to the AIC group Livingston LSC meeting.
LIGO-G D Commissioning P Fritschel LIGO NSF review, 23 October 2002 M.I.T.
LIGO-G D Advanced LIGO Systems & Interferometer Sensing & Control (ISC) Peter Fritschel, LIGO MIT PAC 12 Meeting, 27 June 2002.
LIGO-G d April 24, 2007 Auxiliary Optics System (AOS) Technical Breakout Presentation NSF Review of Advanced LIGO Project Mike Smith, Phil Willems.
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 Prototyping for eLIGO: Power Recycled Fabry Perot Michelson DARM RF ITMy ITMx BS PRM SRM.
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer. at the Caltech 40m interferometer. Yoichi Aso*, Rana Adhikari,
H1 Squeezing Experiment: the path to an Advanced Squeezer
Squeezing in Gravitational Wave Detectors
Next Generation Low Frequency Control Systems
Quantum noise reduction using squeezed states in LIGO
Auxiliary Optics System (AOS)
Prospects and plans : LIGO interferometers Michael Landry LIGO Hanford Observatory LSC meeting, MIT Nov 4-5, 2006.
Aspen January, 2005 Nergis Mavalvala
Reaching the Advanced LIGO Detector Design Sensitivity
Progress toward squeeze injection in Enhanced LIGO
Commissioning Progress and Plans
Update on the Advanced LIGO PSL Program
Installation and Commissioning Status Stan Whitcomb
6. Noise sources encountered
Commissioning Update PAC 15, Dec. 11, 2003 Daniel Sigg.
Design of Stable Power-Recycling Cavities
Commissioning the LIGO detectors
Status of the LIGO Detectors
40m Laboratory Upgrade Progress Report
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
40m TAC Update October 2006 The 40m Team 11 April 2019 G I.
Panel Questions addressed
Presentation transcript:

G I Enhanced LIGO Update Rana Adhikari July ’07 LSC Meeting

G I

U of Minnesota

G I Timeline 1y S5 Coincidence IFOs ready Post-run diag. VENT MAXIMIZE TIME FOR S6 RUN: Several very new subsystems to debug Test different systems H1, L1 ‘Pathfinder phase’ Once teething troubles are debugged, update the other site with what works best ‘Synchronization phase’ Continue leapfrog commissioning w/both instruments completed to reach design sensitivity S6 AdL INSTALL AdL COMMISSION S5 S7 Inst/Comm

G I DC Readout In-vac, DC detectors. No RF demodulation for GW. No more AS_Q. Hardware DC PDs (Rich Abbott) Output Mode Cleaner (Sam W.) Active Beam Stabilization (Bram S.) OMC Suspension (Norna, Janeen, Chris, etc.) Stiff HAM (B. Lantz, ) Diode Testing (Nick Smith, Jamie Rollins) New AdvLIGO controls architecture (CDS) DC Readout Experiments Caltech 40m (Rob Ward) LLO (Rupal Amin, Valera, Sam, Rob)

G I Need serious jitter control to have good noise performance: in- vac, reliable -> ABS Like a iLIGO SOS but smaller and tougher Led by Bram Johannes Jozef ANU Pendulum freqs ~few Hz; passive isolation Large Range ( > 10 mrad & ~1 N/A) Enables dither lock of IFO beam to suspended OMC Dither software tested at 40m Active Beam Stabilization

G I Scattered Light iLIGO baffles were never installed, holes are incompatible (TCS, P-Cal) iLIGO baffles were never installed, holes are incompatible (TCS, P-Cal) Schofield/O’Reilly measurements show coupling from VE ( m/m) Schofield/O’Reilly measurements show coupling from VE ( m/m) Design/Fab/Install new baffles in all potential hot spots (aim for 100x clearance) Design/Fab/Install new baffles in all potential hot spots (aim for 100x clearance)

G IMisc 35 W Laser from LZH/AEI is arriving at CIT soon – integration with iLIGO servos TCS (Tobin Fricke, Phil Willems) – ultra-low noise ISS pre-amp, servo electronics from MIT, ‘Axicons’ for making donut beams. Will have to retire the LHO Quiet Chillers and find room for the new ones. Earthquake Stops – New glass-top stops being developed at MIT to reduce earthquake induced charge buildup. SUS Electronics Noise reduction – bias modules, coil drivers, careful LOS alignment plan MC Loss – absorption measured at LLO by SURF, scatter loss still a problem.

G I Summary So far so good: no large schedule mishaps or technical walls. Enhanced Grad Students (Nick Smith, Rupal Amin, Tobin Fricke,...)