1 JEM PAYLOADS Off Console Plan Yoshio Toukaku / JAXA Kensuke Teranishi / JAMSS January 31, 2013 Notice : This technical data is furnished on the condition.

Slides:



Advertisements
Similar presentations
How to Conduct an After Action Review
Advertisements

1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Training Purposes Only JEM MICROBE-I JMU (Ver. 1.2) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Training Purposes Only JEM EPO 17A JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Training Purposes Only JEM PLT OV JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Systems Analysis and Design 9th Edition
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
Operations Section.
System Implementation
IS-700.A: National Incident Management System, An Introduction
Field Project Planning, Operations and Data Services Jim Moore, EOL Field Project Services (FPS) Mike Daniels, EOL Computing, Data and Software (CDS) Facility.
Training Purposes Only JEM FACET JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and disclosed.
Training Purposes Only JEM FPEF OV JMU (Ver. 1.3) 1 JEM FPEF OV Fluid Physics Experiment Facility (FPEF) Overview Notice : This technical.
9 Closing the Project Teaching Strategies
Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
Conservation Districts Supervisor Accreditation Module 9: Employer/Employee Relations.
ISO 9001: 2000 Certified Audit Process What to do.
CSU - DCE Internet Security... Privacy Overview - Fort Collins, CO Copyright © XTR Systems, LLC Setting Up & Using a Site Security Policy Instructor:
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
SpaceOps Stockholm Page 1 SpaceOps 2012 Stockholm Col-CC Voice System Migration During On-Going Operations Thomas Mueller, DLR,
Training Purposes Only JEM MS MT INC JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used.
Training Purposes Only JEM CERISE JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Training Purposes Only JEM PLT Support Material JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used.
Training Purposes Only JEM RAD SILK JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
1 Keiichiro Sakagami / JEM PAYLOADS Notice : This technical data is furnished on the condition that it will be used by and.
ARCHITECTURE ENGINEERING COMMUNICATIONS TECHNOLOGY AVIATION | CIVIL | CONSTRUCTION SERVICES | DATA SYSTEMS | ENVIRONMENTAL FACILITIES ENGINEERING | GEOSPATIAL.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
Introduction to Payload Planning Will Kirby (256)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
JMU Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its.
MOL The Mission Operations Laboratory First Contact Package June 2011 NASA MSFC Huntsville, Alabama An Introduction to the Payload Systems Team (PLST)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory First Contact Package for KSC Payloads #3 of 5 June 5, 2013 Getting.
Mission Planning Process Changes Gary Rowe Mission Planning Team Lead Teledyne Brown Engineering Presented to: Increment 3 POIWG June 13, 2001 Mission.
Splinter Utilization Planning Discussion Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
JAXA Rodent Experiment Requirements Futoshi MATSUNAGA (JAXA IS)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
Lisa Prendergast EO20/ Operations Lead January
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama OCR Etiquette Jimmy Whitaker.
ACES User Interface Workshop #1 Prototype Inspection 22. November 2011.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIC Flight Control Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
JAXA Operations Streamlining Payload Operations Integration Working Group#35 January 29, 2014 Akio Koike JAXA Flight Director (J-FLIGHT)
Payload Operations and Integration Center MSFC Daily Summary for PDs.
1 Increment 33/34 JAXA Utilization Overview Payload Operations Integration Working Group (POIWG) #32 in Huntsville, July 24th – 26th, 2012 Takefumi Sakaguchi.
June 16, PMDIS TIM Shuttle Operations Coordinators (SOC) Roles & Responsibilities Beth Griggs Shuttle Operations Coordinator
This document is the property of EADS SPACE. It shall not be communicated to third parties without prior written agreement.Its content shall not be disclosed.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
Stewardship in biotechnology
Roles and Responsibilities
Presentation transcript:

1 JEM PAYLOADS Off Console Plan Yoshio Toukaku / JAXA Kensuke Teranishi / JAMSS January 31, 2013 Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its contractors and sub contractors only for the purposes of fulfilling the cooperating agency’s responsibilities under the Space Station Intergovernmental Agreement (IGA) and Memorandum of Understanding (MOU). It shall not be used for any other purpose, nor disclosed or retransferred to any other entity or government without prior written permission of the Japan Aerospace Exploration Agency (JAXA).

2 Contents Introduction Structure New Staffing Concept Offline team Plan Question for POIC Question for Cold Stowage Operation

3 Introduction Purpose and Scope To provide a big picture of JEM PAYLOADS reduction plan from console. Goals To shift JEM PAYLOADS from console to offline for planning and preparation. Objectives To promote streamlining on JFCT structure. To simplify real time operation conforming to utilization era. To strengthen planning and product preparation for utilization operations.

4 J-FLIGHT SSIPC/MCR SSIPC/UOA Technical Support* JEM Pressurized Payload Operations JAXA System/Payload Safety * SSIPC/ESR JEM Payload Officer (JEM PAYLOADS) *On-call JEM Exposed Payload Operations Exposed Facility Payload Officer (ExPO) Payload Stowage Officer (HAWK-I)* KIBO PL FCT JFCT (FLAT,CANSEI, J-PLAN, J-COM, Tsukuba-GC, ARIES, KIBOTT) JAXA Payload Ops Conductor (JPOC) * Rack Officer (BIO, FISICS, GOLEM,MEISTER, etc) Introduction Structure (Current) IPU-G Operator Rack Operator (BIO, FISICS, etc) User Integrator SEDA/MAXI/ SMILES/MCE/REX- J Operator Technical Support* Payload Ground System Officer (PLGS)* POD POIC Cadre (PRO/DMC/OC/T CO/Marshall OPS /etc) POIC Direction from J-Flight to RO/Report from RO to J-Flight Coordination between SSIPC and POIC

5 J-FLIGHT SSIPC/MCR SSIPC/UOA Technical Support* JEM Pressurized Payload Operations JAXA System/Payload Safety * SSIPC/ESR *On-call JEM Exposed Payload Operations Exposed Facility Payload Officer (ExPO) Payload Stowage Officer (HAWK-I)* KIBO PL FCT JFCT (FLAT,CANSEI, J-PLAN, J-COM, Tsukuba-GC, ARIES, KIBOTT) JEM PAYLOADS * Rack Officer (BIO, FISICS, GOLEM,MEISTER, etc) Structure (Goal) IPU-G Operator Rack Operator (BIO, FISICS, etc) User Integrator SEDA/MAXI/ SMILES/MCE/REX- J Operator Technical Support* Payload Ground System Officer (PLGS)* POD POIC Cadre (PRO/DMC/OC/T CO/Marshall OPS /etc) JAXA Payload Ops Conductor (JPOC) * Position Lead (BIO, FISICS, ExPO, etc) * Off line Team POIC Introduction Direction from J-Flight to RO/Report from RO to J-Flight Coordination between SSIPC and POIC

6 New Console Staffing Concept Most of real time operation work done by JEM PAYLOADS is transferred to J-Flight. J-Flight directly controls rack officer for real time payload operation. No change of responsibility of Rack Officer except direct coordination with J-Flight. J-PLAN and Payload FCT might be expected in case J-Flight is tied up. J-PLAN will directly cover payload real-time planning as JEM PAYLOADS does. Offline payload team supports console J-PLAN instead of console JEM PAYLOADS. (STP, E-3, E-1, PPCR) Maintain support for POIC as we did except For real time coordination with POD, J-Flight takes care. J-Flight will use JEM PAYLOADS/POD loop when coordinating with POD as JEM PAYLOADS does. CANSEI, FLAT, J-PLAN will not change their staffing.

7 Strengthen Offline Support In order to accomplish fruitful science and operation, offline support should be built up for console support. With reference to PREP team in POIC, similar team is thought to be established. Member Lead JEM PAYLOADS Lead JPOC (or JPOC representative) Lead Rack Officer (or their representative) Representatives for Exposed Payload Officer, HAWK-I, PLGSG OP, as needed. 8x5 staffing For action necessary during weekend or holiday, handle them in advance or later chance of timeline review. Scope Overall planning management from WRP Input to E-3 – WPR Input, WLP review, STP review – JEMCR coordination for planning change by E-3 E-3/E-1 review in advance unless Rack Officer is on console. JEDI message, R/T ODFCR, File Transfer Request input and coordination Reference information input to console for real time operations.

8 Plan In addition to weekend and special holiday, some weekdays will also be off console starting in Increment 35. off console during orbit1 and orbit2 (7:00 to 23:00 GMT). on console during orbit3 (Tsukuba day time shift). POD and POIC will be informed when JEM PAYLOADS is off console for weekday. JEM PAYLOADS will be off console even JAXA payload racks are in active. Aiming low stress science operation period, such as … Monitoring only science like PCG. Well experienced science like Marangoni. Routine or simple crew task. (IPU VRU HDD R&R.) JEM PAYLOADS evaluate the real-time operation at MCR or UOA To monitor and evaluate process and execution of nominal operation. Voice loop is also being monitored. Could support Payload FCT and JFCT with their request.

9 Plan (Continued) Simulation to evaluate process and execution in anomaly and emergency situation will be conducted in parallel. Coordination of OIP update may start later in this year. Throughout some weekdays off console and simulation, OIP update proposal will be made. Coordination will be made via and POIC/SSIPC telecon. Evaluation will be made after some weekday off console as well as simulation whether the operational quality and experiment opportunities are maintained.

10 Undock Dock JAXA Utilization Overview (Based on Final OOS Input) Increment 35/362013Mar.Apr.MayJun.Jul.Aug.Sep. Note Saibo Rack 50P (- 4/23) 34S (3/30 - 9/10) 35S (5/30 -) Total: 25 Runs Soyuz Progress 33S (12/21 – 5/13) Ryutai Rack Marangoni UVP2R Ice Crystal 2 Resist Tubule HTV4 Kobairo Rack Alloy Semiconductor MSPR Microscope Checkout C/O 52P (7/27 -) ATV COTS, HTV ATV4 (5/1 - 10/15) MEDAKA Osteoclast 2 33S PCG 52P 51P (4/27 – 7/23) Orb-D1 (4/10 -5/7) HTV4 (7/20 – 8/19) SpX-2 ( - 4/2) 32S (- 3/15) 34S Resist Tubule Total: 17 Runs Total: 2 Runs Total:1 Run Checkouts Aniso Tubule Total: 1 Runs Weekday Off Console (TBD)

11 Questions for building efficient operation structure Several questions are listed from the next page.

12 Questions to POIC Cadre There are some question regarding POIC payload planning and operation with PREP team. Some questions for ground command and monitoring system are included. Cadre team building Structure, roles & responsibilities, staffing, How many people is on console per shift/position? How many people are certified for each position? Is there anyone who has two or more console position? Is current staff enough to operate many payloads simultaneously? Need more people or position? Less number of people could operate them as you did now?

13 Questions to PREP team PREP team building 8x5 staffing What is the structure (Integrated POD, PPM, …) How many people joined PREP room and its facilities Scope of PREP Covering up to E-3? How to communicate with console and user/PD? How do you manage, control and implement request change? Lessons Learned What is benefitial? What is difficulty for managing PREP? What should be considered making PREP?

14 Questions to Ground System Team Commanding How do you manage and share commanding from remote center, PI or user? Any command can be set from the remote center once PRO activate its experiment payload.(DECLIC, SpaceDRUM, HREP, etc) Do you have a capability to send command automatically? What is the method? How do you verify before implementing to operation? Is there any requirement on commanding system in remote center? Does POIC verify or certify that system before implementing to operation? Telemetry monitoring For telemetry termination or out of expected range, is there any sound or popup when it occurs? Or just watching telemetry periodically? For malfunction, is associate procedure or command script called out automatically?

15 Questions to Cold Stowage Operation team JEM system provides cold stowage function for transferring and stowing cold samples onboard. SSIPC would like to know your lessons learned from operation of many cold stowage such as MELFI, Glacier and so on. Is desiccant necessary onboard? How often is it replaced? Do you usually ask crew to defrost cold stowage? How long do you need to dry out DCB after launch? Is there any periodic checkout/maintenance required for cold stowage? Is there any special attention for planning and real time operation regarding cold stowage? What kind of function do you think the cold stowage should have for operation? What kind of function do you want for current cold stowage, such as MELFI, DCB, and so on? Is there any difficulty you found for cold stowage operation?