POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.

Slides:



Advertisements
Similar presentations
Overview of ER & Availability Based Tariff P.Mukhopadhyay.
Advertisements

1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
Sl. No Lines/ICT’sAction byAction KV Kanpur - Ballabhgarh HVPN RRVPN DTL Load shedding in and around Ballabhgarh Load shedding in Northern Rajasthan.
POSTAL INDEX NUMBER(PIN) Postal Index Number is a 6-digits code introduced w.e.f It is the last piece of information in the address.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
NR - ULDC SCHEME POINTS OF CONCERN.  1. LACK OF REDUNDANCY  2. FREQUENT BUGS IN SCADA SOFTWARE  3. INCOMPLETE REPORTING SYSTEM  4. EMS – INCOMPATIBLE.
NR - ULDC SCHEME POINTS OF CONCERN.  1. LACK OF REDUNDANCY  2. FREQUENT BUGS IN SCADA SOFTWARE  3. INCOMPLETE REPORTING SYSTEM  4. EMS – INCOMPATIBLE.
MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
Balanced Score Card: The Strategic Management System What is a Balanced Score Card? 1.Companies express grandiose Visions and exhort managers to implement.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Scheme of Assistance for Working Women Hostel MINISTRY OF WOMEN AND CHILD DEVELOPMENT GOVERNMENT OF INDIA.
Electric Entities: New Models
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Program on Grid management SCADA/EMS System in Northern Region
Consultancy by : Power Grid Corporation of India Ltd.
NLDC 1 SCADA-Functions Author, Vineeta Agarwal Place PSTI, Bangalore Date
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
W E L C O M E Power Grid Corporation of India Limited.
Sanjay Garg General Manager PGCIL/ Ministry of Power
MANAGEMENT OF LOAD DISPATCH CENTERS RLDC’s MANAGEMENT.
Load Despatching Facilities in India SLDC AP WRLDC NLDC Main NRLDC Sub LDC CSub LDC W VSAT Commn PG FO Comn Sub LDC V NLDC Backup SRLDCERLDCNERLDC SLDC.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
NORTHERN REGIONAL LOAD DISPATCH CENTER 12 th June 2004 Director DOE MD BPC Advisor DOE Royal Govt of Bhutan WELCOMES POWER GRID CORPORATION OF INDIA LTD.
POWERGRID Welcomes Hon’able Members of “Standing Committee on Energy”
W E L C O M E Power Grid Corporation of India Limited.
Power Grid Corporation of India Ltd.
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri P. Shankar Chief Vigilance Commissioner At NORTHERN REGIONAL LOAD DISPATCH CENTER 25 th March.
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri N K Singh Member, Planning Commission At NORTHERN REGIONAL LOAD DISPATCH CENTER.
SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS.
CDR Analysis & Investigation Basic Course - Presentation by Ketan Computers Mobile: Website :
NORTHERN REGIONAL LOAD DISPATCH CENTER 1 st June 2004 Shri P. M. Sayeed Hon’ble Minister of Power Govt. of India WELCOMES POWER GRID CORPORATION OF INDIA.
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation.
Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri Brajesh Mishra Principal Secretary To Prime Minister At NORTHERN REGIONAL LOAD DISPATCH CENTER.
Renewable Regulatory Fund (RRF):- Implementation Mechanism
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
1 © A. Kwasinski, 2015 Cyber Physical Power Systems Fall 2015 Security.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
UTILITY OF MODERN LOAD DISPATCH COMMUNICATION SYSTEMS
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
To utilize spare capacity of ULDC schemes and maximize return on its transmission infrastructure, POWERGRID decided to diversify into Telecom Through an.
Wednesday, March 31, 2004 MANAGEMENTOF LOAD DISPATCH CENTERS.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Smart Grid & Integration of Renewable Energy Resources.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
HPSEB STATE LOAD DESPATCH AND COMMUNICATION CENTRE, SHIMLA
Sterlite Grid Limited Sterlite Grid Limited
A Presentation on Grid Management
POWER GRID CORPORATION OF INDIA LIMITED Northern Regional Load Despatch Centre (NRLDC) WELCOMES TANZANIAN DELEGATION 26th August 2003.
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
A PRESENTATION BY HPSEB LTD.
Renewable Integration
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Current Status of Polio Cases July 2011
Current Status of Polio Cases Dec 2010
Culture 8 - National Capital Territory of Delhi Culture 6B - Goa
“ MERIT ORDER SCHEDULING AND
Public Financial Management System (PFMS)
India countrY OUR.
Presentation transcript:

POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication Scheme January 11, 2002

Commencement of commercial operation : Largest transmission utility in the World today with EHV network of 40,000 ckt kms wheeling 33,000 MW (40% of total power) System availability over 98% at par with International standards Consistently profit making Most of 17 major projects on time and within cost Bestowed with PM’s Awards for excellent performance against MOU with GoI POWERGRID PROFILE

Development of National Grid with addition of 60,000 Ckt Kms of Transmission Network with an investment of Rs. 74,000 Cr to carry additional 1,00,000 MW by Existing 4850 MW inter-regional transfer capacity to be enhanced to 30,000 MW by 2012 Diversifying into Telecom business Delhi-Chandigarh link under commercial use Delhi-Mumbai link by Mid, 2002 Balance network by December 2003 Diversifying into Distribution, assisting 12 Circles in various States POWERGRID PERSPECTIVE PLAN

Quick restoration of power supply through Emergency Restoration System and trained manpower Gujarat cyclone in 1998, power restored within a week Orissa Cyclone in October, 1999, power restored within 11days Gujarat earthquake January, 2001 Power restored within one week Built 10 Sub-stations within 3 months, inaugurated by Hon’ble PM DISASTER MANAGEMENT

Erection of ERS by Helicopter

TOWARDS GREEN ENVIRONMENT

A STATION AND ITS GREENERY

5 Regional ULDC schemes under implementation, estimated cost Rs. 2,200 cr. NRLDC Project Cost Rs 659 cr., Payback period 3 years Most complex system covering 15 electrical utilities spread over ten (10) lakh square kilometers with 33 control centres and 369 RTUs Advance Training Simulator State-of-the-art technology Supervisory Control and Data Acquisition (SCADA) Energy Management System (EMS) Hybrid dedicated Communication System with Live Line Optic Fibre Stringing and Microwave UNIFIED LOAD DESPATCH & COMMUNICATION (ULDC) SCHEMES

HIERARCHICAL SETUP RTU SUB LDC SLDC ERLDC WRLDC NRLDCSRLDCNERLDC 5 Nos. NLDC 32 Nos. 41 Nos Nos.

OBJECTIVES AND BENEFITS Through real time monitoring & control system security, reliability, voltage & frequency profiles improved Avoidance/ minimization of grid disturbances and quick restoration in case of failure Optimal utilization of resources and economic dispatch of power

UNIFIED LOAD DESPATCH & COMMUNICATION SCHEME (NORTHERN REGION) J F H H H H H Chandigarh,BBMB DVB Lucknow Panipat(HSEB) H Patiala F F F F F Panipat (BBMB) F Dadri (B) Dadri (H) F F F F F Rishikesh F Bhilwara F Kota F Ratangarh F Narwana F Hamirpur F F Laltonkalan F Jallandhar (P) F Jallandhar (B) F Ganguwal (B) H Heerapura F H Jammu & Kashmir Himachal Pradesh Punjab Uttar Pradesh Rajasthan Gujarat Madhya Pradesh F Bemina J&K SEB 1 SLDC 1 Sub-LDC 16 RTUs PSEB 1 SLDC 2 Sub-LDC 40 RTUs HVPNL 1 SLDC 2 Sub-LDC 42 RTUs RVPNL 1 SLDC 3 Sub-LDC 79 RTUs HPSEB 1 SLDC 2 Sub-LDC 16 RTUs DVB 1 SLDC 4 Sub-LDC 31 RTUs UPPCL 1 SLDC 4 Sub-LDC 55 RTUs RLDC NEW DELHI 36 RTUs CPCC KANPUR 6 RTUs SLDC Sub - LDC H F Gladni Panki ana Uttaranchal 1 SLDC 27 RTUs BBMB 1 SLDC 4 Sub-LDC 21 RTUs Hary Moradabad Varanasi Sultanpur Delhi Jutogh Kunihar H Rishikesh

Thank You