Elbow River in Calgary (ERIC) Maureen Bell. Requests to The City of Calgary 1. We request The City advise where any and all berms, channel blockages,

Slides:



Advertisements
Similar presentations
Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Advertisements

Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Emergency planning and community resilience Edward Shaw Emergency planning officer 30 th October 2013.
Management of future floods at Cockermouth LO: To be able to explain how a specific riverine area has been managed.
Status Quo Assessment of Wastewater Ponding Systems.
Sandbagging Techniques
Rebuilding in flood hazard areas. Impact of flood Area directly impacted spans 55,000 square kilometres Evacuations of almost 100,000 people 10,000 homes.
Stormwater Management Jamie Geils Lock, Project Engineer DuPage County Stormwater Management.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
BY: GROUP 2 Food Safety Regulations and Standards.
Process Analysis: Fire Safety At Workplace CM2180 Student Sample.
Project Scope Hire Consulting Firm to perform following:
Greg Carter GoA Partnership Symposium. Format AENV role in emergency management AENV role in emergency management AENV role in the field AENV role in.
The In's and Out's of Locking Through a Dam By RiverBill.
RISK BASED ENVIRONMENTAL ASSESSMENT RISK-BASED ENVIRONMENTAL ASSESSMENT Simon Catchpole Porto, May
FDA Recalls Risk Communication Advisory Committee David K. Elder Director, Office of Enforcement.
Presentation resource for teachers. 2 The water cycle Source: Anglian Water.
The Environment Institute Where ideas grow Striking the Balance between Food and Fibre Production and the Environment Mike Young Executive Director, The.
COMMUNITY-ORIENTED DISASTER PREPAREDNESS STRATEGY Tuesday April 22, 2014.
Healthy people/Healthy communities Disaster Planning and People with Disabilities.
1 TRANSNET PAGE National Environmental Management: Integrated Coastal Management Amendment Bill, B Transnet SOC Ltd submissions to the Parliamentary.
Unit 15 Planning and Management of Major Incidents
October 29, 2013 Calgary flood 2013 – Resilience of City’s workforce supports Continuation of operations Ron Schafer, Transportation Planning Sandy Virgo,
City of West Linn Bolton Reservoir Replacement Planning Commission Hearing July 1, 2015 Presented by: Thomas P. Boland, P.E. Murray, Smith & Associates,
What is a Watershed? Goals for this module Discuss the goals and objectives of the project Discuss the goals and objectives of the project Learn who.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
FREEMAN Flood REsilience Enhancement and MANagement A pilot study in Flanders, Germany and Italy.
How Do Californians Get the Water They Need?. California Science Standard 3.e Students know the origin of the water used by their local communities.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Crisis in Shrewsbury Flooding impacts and risk management.
Amherst County Comprehensive Plan (Update)
Barron v. Baltimore Argued February 11, 1833 Decided February 16, 1833.
In coordination with FEMA Kickoff Meeting Ventura County, CA April 29, 2010.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Isolation Lock-Out Room Johns River Quarry Site Contact: Blake Ardrey, Quarry Manager, BCM, Johns River Quarry Phone:
WJEC (B) GCSE Geography Theme 2 Topic 4 Click to continue Hodder Education Revision Lessons Flooding.
Re-entry/Re-occupancy Exercise New Orleans, LA after Hurricane Katrina. Courtesy of NOAA.
Impact of Natural Disasters
OHS TAAENV403B ensure a healthy and safe learning environment.
Somerford Keynes Parish Council Neighbourhood Development Plan PARISH PRESENTATION 19 th JANUARY 2015.
Bath and North East Somerset – The place to live, work and visit Local Flood Representative Meeting 08 October 2015.
FDA job description  Regulates about 25% of all consumer purchases  Mission summary: protect and advance public health  Products: food, cosmetics, drugs,
Infrastructure Vulnerability Profile. Objectives: To identify key infrastructure concerns related to the pre-defined hazards and issues Identify needed.
Flood Recovery for Heritage Calgary, Alberta and surrounding area Alicia Ghadban Heritage Conservation and Sustainability Sustainable Heritage Case Study.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
Using HAZUS to Estimate Social Impact Reduction during the June 2013 Alberta Floods SOCIAL IMPACT REDUCTION DURING THE JUNE 2013 ALBERTA FLOODS: Using.
International Levee Handbook Overview of the handbook Chapter 6 – Emergency Management and Operations.
WJEC GCSE Geography A Unit 1 – The Core A- The Physical World Theme 1 Water.
US Army Corps of Engineers BUILDING STRONG ® 2011 Flood Recovery The Benefits of Collaboration Maria de la Torre Chief, Emergency Management Baltimore.
Back River Flooding and Shoaling Citizens Committee Back River Flooding and Shoaling Citizens Committee August 15, 2007.
Research Ethics Dr Nichola Seare Aston Health Research & Innovation Cluster.
Building community resilience Ralph Throp Resilience Division Scottish Government.
ND Downstream Watersheds Comprehensive Detention Planning
1,000 Year Flood Lessons Learned After A State Disaster Norma J
Parks Asset Management Plans in Action During a Natural Disaster
Occupational Radiation Protection during High Exposure Operations
Flood Control and erosion prevention
THE CORPS REGULATORY AUTHORITY
Marium, Alex, Billy, Ollie
What do you need to revise?
Nova Scotia’s Statements of Provincial Interest
Lesson Five: Decision Making
Selecting the Level of Involvement
Financial Considerations
Unit 5 Overview In this unit, you will be given an opportunity to apply information presented in the previous units. You will be given a scenario involving.
Hydrologic Engineering
Newport Flood Emergency Legal Issues
Disaster Recovery Operations
Sacramento Environmental Commission January 2019.
Periodic Accounting Review Periodic Revenue Reconciliation
Presentation transcript:

Elbow River in Calgary (ERIC) Maureen Bell

Requests to The City of Calgary 1. We request The City advise where any and all berms, channel blockages, sand bagging, temporary dams, or any other form of public property protection will be built, constructed, placed that will or may affect the flow of the river in our communities. We are aware that the Safeway berm was recommended in the Expert Panel’s report notwithstanding the adverse impact on the community. We are aware of the Stampede Flood walls and have been advised there will be no impact from the Flood walls on our neighbourhoods (no hydrological analysis complete). We are not aware of other measures intended to protect the downtown, LRT, Saddledome, City Hall, Macleod Trail, or other private or public properties in the watershed. Any emergency or other measures you intend may cause unintended consequences to the ERIC Communities and we request advance knowledge.

2. When The City protects the “public good”, the impact on all or any part of all of our communities must be understood and we must be advised so we can take the appropriate action. If you consider your highest duty to be to the larger public food, you must be responsible for the impact. Requests to The City of Calgary 3. We request The City place cranes at the bridges to remove the debris during high water. 4. We request The City remove the debris in the river now, so it will not block the river or bridges during high water.

5. We request The City provide its report on the condition of the Elbow River from the Reservoir to the Bow with respect to the changes in the channel. We assume the report is complete in order for The City to understand the issues that may arise from the next high water event. We can reasonably expect changes in the path of the river which will be different in 2014 high water due to the changes in the channel. In the event such a report or analysis is not available, we ask that it be done forthwith so that we can be informed of the changes that may affect the risk to our properties. Requests to The City of Calgary 6. We request The City dredge the Elbow River in Calgary to clear the channel where it is appropriate. We note The City has responsibility for managing the river which includes dredging so we are not adversely impacted by the channel change.

7. What sandbags and other equipment will be available for each of the ERIC communities? Who within The City of Calgary is our contact? Requests to The City of Calgary 8. When will The City of Calgary ask the citizens of the ERIC neighbourhoods what they need to prepare for 2014 high water in addition to the matters set out in this request. Our next meeting is May 13, 2014 at which we can accommodate you. Our preference is to invite you to come to a meeting where several people can hear the answer to each question rather than the current open house model at which each person may ask the same question over and over of The City employees present. The model does not allow collective wisdom which is essential for community safety. 9. We confirm our communities are under considerable stress and ask that you provide support. We advise monies are budgeted for this service.

10. As experts you know what we need to know. We request that you share that information with us. To not share the Master Plan puts our communities, our properties, and our people at greater risk. Requests to The City of Calgary 11. We confirm our invitation for The City of Calgary to join our next meeting on May 13, 2014.