1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.

Slides:



Advertisements
Similar presentations
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
Advertisements

1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Muon Endcap Alignment Software & Calibration February 2006 Muon Endcap Alignment Software & Calibration February 2006 Samir Guragain, Marcus Hohlmann Florida.
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
Approved Plots from CMS First Beam Runs 2-October-2008.
1 James N. Bellinger University of Wisconsin-Madison CMS Week June 2010 Coordination: Things to do Coordination: James N. Bellinger CMS week 2010.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
Muon Endcap Alignment Analog Sensor Calibrations & Software Update Samir Guragain, Marcus Hohlmann Florida Tech October 2005 USCMS EMU meeting – Fermilab,
Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS)
Hand Crosscheck HSLM1. Position of REF DCOPS CENTER MAB Target DM distance DMdowel to DCOPS dowel DCOPS dowel to center.
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
Calibration of Analog Sensors for the Alignment of Muon Chambers in the CMS experiment Marion Ripert, Georgia Karagiorgi, Thomas Moschoutis Dr. L. Caraway,
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
CHEP’06 COCOA 1 Cms Object-Oriented Code for Optical Alignment Pedro Arce (CIEMAT), Michael Case (U. California Davis) CHEP 2006, Mumbai, 13-17th February.
Samir Guragain, Marcus Hohlmann Florida Institute of Technology, Melbourne, FL Z′ Mass Reach MC Analysis USCMS meeting Brown University May 6 – 8, 2010.
1 James N. Bellinger University of Wisconsin-Madison 13 February 2008 Cocoa Plans.
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
1 James N. Bellinger University of Wisconsin-Madison 25-February-2011 Z-sensor News James N. Bellinger 25-February-2011 Good news this time!
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
1 James N. Bellinger Robert Handler University of Wisconsin-Madison 11-Monday-2009 Laser fan non-linearity James N. Bellinger 20-March-2009.
Status of physics analysis Fabrizio Cei On Behalf of the Physics Analysis Group PSI BVR presentation, February 9, /02/2015Fabrizio Cei1.
1 James N. Bellinger University of Wisconsin-Madison 19-Feb-2010 Status of Transfer Line Reconstruction James N. Bellinger 19-February-2010.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
Approved Plots from CRAFT
Muon Alignment: Organization
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Plus Endcap Transfer Lines
Status of Transfer Line Reconstruction University of Wisconsin-Madison
DCOPS Readout before and during MTCC
University of Wisconsin-Madison
Validating Transfer Line Fit University of Wisconsin-Madison
Starting from the Basics
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Comparing Laser Fit to Barrel Fit University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
CMS Week Muon Alignment
University of Wisconsin at Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Presentation transcript:

1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment

2 Endcap Hardware Alignment Lasers + DCOPS Across disk face (nearly radial) Axial across disk rims Z sensors at disk rim Tiltmeters at disk rim Radial distance-meters between chambers Overlap w/ Link sensors on ME±1/2 chambers Z sensor between ME±1 and outer MAB

3 DCOPS Positions on SLM

4 Tilt-meters and R distance-meters Tilt-meters at rim Z-sensors at rim R distance-meters between chambers, transfer plate

5 Transfer Line Layout ME+4ME+3ME+2ME+1 ME12 ME-3ME-1 ME-4 YB+2YB+0YB-0YB-2 Laser

6 Purpose of Components X/Y/Z of chambers relative to Transfer Plates DCOPS Z measurement at Transfer Plates Plunger distance-meter and Ztube for YE to YE disk IR distance-meter and target for YE1 to MAB Inner radius and X/Y/Z for ME±1 Supplied by Link X/Y of Transfer Plates Provided by Transfer Line Radial shifts between rings of chambers Measured by radial distance-meters

7 Hardware Status 3 bad readout boards repaired (1%) Analog components (distance and tilt meters) working IR lasers covered for safety Transfer line laser control tested Dismounted selected DCOPS and Lasers Xiaofeng also is responsible for the LV controls

8 To Be Done After closing, remount interfered-with lasers and DCOPS Align Transfer Line lasers Bug was fixed which blocked Picomotor control

9 Alignment Action Program Create/verify geometry definition Identify good data Piecemeal fit to subsections Share fit info among subsections (esp. from Link) Refit w/ new geometry info “Big Bang” fit w/ everything? May not be needed

10 Available Endcap Subsystems’ Analyses Laser Lines for ME+2,3,4 ME-2,3,4 Chambers ME+1/2 Chambers ME+1/3 (not blessed yet) Z sensors for Endcaps Reliable information available Chamber Z centers Chamber Z tilts

11 DCOPS Fits Outline of DCOPS CCD 2 Lasers: 1 per side Fits for chamber surface ME+2/SLM2, Z measurements, B=0 Cocoa est. for chamber fit error is 250µ

12 DCOPS-Only from previous Blow-up view of just the DCOPS. There are two CCDs for each direction Each DCOPS has 2 CCDs measuring Z. Most error bars are invisibly small Most fits have RMS near 30 microns

13 Chamber surface estimates Red=Real Green=Sim MAB ASPD ME12 ASPD ASPD P4 Distancemeter and dists IR target DCOPS dowels Animated ME+1 Half-SLM DCOPS Inner Link MAB dist

14 Muon Endcap Hardware Alignment Preliminary z global r global CMS Side view             Nominal CSC position              x = 0 Nominal CSC position Not to scale     Pink: Aligned by Tracker-Muon Link system Blue: Aligned by Muon Endcap Optical System Red: Not aligned yet  x = 0 : 3.9mrad ME+1/3,2/2,3/2: Δz:- 5 mm to IP globally : mm : mm   nom. : mm   x > 1.3mrad : 5.94 mm  : mm : mm : mm : mm : mm : mm : 3.7mrad : 3.4mrad : 3.9mrad : 4.7mrad : 3.6mrad : 4.2mrad : 3.4mrad : 3.4mrad : 3.5mrad nom. : 4.4mrad : 4.4mrad ← Muon Endcap stations → ME+1 ME+2ME+3ME+4ME-1ME-2ME-4ME-3 ME-1/3,2/2,3/2: Δz:+ 5 mm to IP globally : -2.2 mm Green: Not blessed yet Z not to scale

15 In the pipeline 1.Relative X/Y information for Endcaps separately 2.Barrel muon 3.ME-1 4.Locate Endcap SLMs using relative X/Y info from step 1 5.Reconcile inclinometer data w/ laser line results 6.Proof of principle linking MAB with Endcaps via Transfer Lines

16 Hardware Problems we had Minus side Link Disks assembled such that components couldn’t talk to each other! Transfer Lines Disk assembly mismatches caused some shadowing Could not adjust all the laser directions (FIXED) 3% DCOPS missing (FIXED)

17 Order of Tasks for Endcap Independent validation of data quality in all detectors Stand-alone reconstruction of SLMs and Transfer Lines When Link results are available: Refit Big Bang fit to everything at once?

18 Close CMS Bi weekly MWGR weekly MWGR CRUZET S w & w/o tracker CRAFTS Adjust LD- LHC dev. collisions DT StandAlone  align Mar Apr May Jun Jul Aug Sep Oct Nov Dec Barrel HW Geom Endcap HW Geom Full B=3.8T AR vs. TK survey+tracks  r correction CSC align w/cosmics DT align with collision tracks CSC align with collision tracks Full Barrel HW B=3.8T Full Endcap HW B=3.8T Integrated HW 3.8T Integrated HW + track-based Geom Full Link 0T Full HW Geom 0T Full Endcap HW 0T Integrated HW 0T DT align with CRAFT2 cosmics CSC align with CRAFT2 cosmics G. Gomez Alignment work plan

19 Time Estimates If the disks are assembled with reasonable accuracy Then repeating the work with fresh data in May should be quick Delays result from having to sort out bad values Doing it again in August should be easier still

20 Automation of Fitting DCOPS data is not automatically migrated from Online to Offline – Only needs password file, re-test in new environment We still want human eyes on the data before we use it James N. Bellinger 2-March-2009

21 Remaining Projects Include Decide how to interpolate between fit chambers to reach non-instrumented ones Include tilt-meter results Fit using all the Transfer Lines Preliminary work shows agreement with photogrammetry in the Plus Endcap

22 Plus Endcap DCOPS relative displacements Vectors plotted to show dX Ring diameter is not relevant Largest vector has length given in the title Vectors at center average the rest, to estimate disk displacement From PG Zrot: ±.7 mm ±.7 mm ±.7 mm ±.7 mm

23 Prospects Confident we’ll have good (to 250µ or better) fits for Endcap positions next summer Confident we’ll be able to link Plus and Minus Endcap positions Link system has been quite quick getting results Encouraging results from the Barrel