Tuner, Coupler WP & specification table H. Hayano, KEK 03042008 GDE Sendai.

Slides:



Advertisements
Similar presentations
ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Advertisements

Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Cavity Technical Specification IWLC2010 WG3 industrialization session H. Hayano Geneva,Oct.2010.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Cost comparison of tuners H. Hayano, KEK AWLC14
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
Cavity Tuner Spec. profile for Plug Compatibility H. Hayano April 22, 2008 ILC-SCRF
ILC S0 Strategy Proposal FNAL GDE status 報告会 4月28日: (空胴表面プロセス、空胴システム)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
Shuichi Noguchi,SRF2007,10.71 New Tuners for ILC Cavity Application Shuichi Noguchi KEK.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Lutz Lilje, DESY, TILC08 Tests with the Fast Frequency Tuners in the Saclay-I design Lutz.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Plug compatibility Document ILC10 cavity integration session H. Hayano.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Work Packages Lutz Lilje GDE.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
ALCPG11 1 Comparison of Tuner Performance in S1-G Cryomodule Rocco Paparella, on behalf of S1-Global team.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
GDE 4/Mar/20081 Lorentz Detuning Calculation for the transient response of the resonant cavity Introduction “Two modes” model Method of the.
Cavity and Cryomodule Plug-Compatibility To Reach Consensus Akira Yamamoto ILC-08, Chicago, Nov. 17, 2008 Nov. 17, 2008ILC-08 SCRF1.
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
TDR parameter discussion on Cavity, Cavity Integration R. Geng, H. Hayano
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
S1G Experiment Schedule Plan
TDR guideline discussion on Cavity Integration
WP5 Elliptical cavities
Power Couplers, HOM Couplers and Tuners for the XFEL
Meeting for S1-Global module design Cryomodule and Cryogenics
SCRF 21-25/Apr/2008 Measurement & Calculation of the Lorentz Detuning for the transient response of the resonant cavity Introduction “Two.
Tuner system Zhenghui MI 2017/01/17
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
S1-G Webex meeting Global Design Effort
Mechanical setups Lorentz Force Detuning System Setup
Review of the European XFEL Linac System
Tuner system for CEPC MI Zhenghui 2016/09/14
Nick Walker (DESY) EU GDE Meeting Oxford
TTC meeting, Milano Global Design Effort
Presentation transcript:

Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai

Work Package Cavity Package WP-CP1. Tuner Tuner Selection ( Saclay tuner, Brade tuner, Slide-jack tuner, Ball-screw tuner, together with Fast tuner selection) Lorentz detuning compensation (specification, method, required rigidities, fast tuning specification,…) Motor location ( inside/outside/inside with accessible ) Piezo location ( inside/ accessible) [Baseline Selection at end of 2008], then detail engineering design. WP-CP2. Coupler Baseline coupler : TTF-III (variable coupling) Consideration of fixed coupling for easy installation/handling, cost point of view. Re-visit of port diameter, etc. [Selection of fixed/variable coupling at end of 2008], then detail engineering design.

Work Package (cont.) WP-CP3. Cavity Magnetic shield Magnetic shielding method (inside or outside vessel) [Selection of magnetic shield inside/outside at end of 2008], then detail engineering design. WP-CP4. Cavity vessel Vessel material ( material selection, metal junctions, HPV regulation) including alignment method. [Engineering design detail at end of 2009] WP-CP5. Cryomodule Operation ( S1 task ) Demonstration of 31.5MV/m operation by at least one cryomodule. Possibility of STF phase 1 connected module with cavities from US, EU to be a S1 module (S1 global). [demonstration by end of 2009]

Plan for developing WPs and Spec. tables Call of EOI for proposed WP, done. (from IHEP, KEK-WG5 already received, LAL) Develop WP, with interested Institute, with resource(?), ~end of November. Revise specification profile table, ~end of November. Finalize WP & spec. tables, Feb March, ILC-GDE meeting at Sendai

Specification tables which allow a plug-compatible concept (1) Slow Tuner

Specification tables which allow a plug-compatible concept (2) Fast Tuner

Specification tables which allow a plug-compatible concept (3) Coupler

Specification Table Determine the design profiles/outlines. To be used for the plug compatible design. The plug compatible design, the alternate design must meet this specification table. They should demonstrate the specification with required number of validation test.

Survey Results (abbreviated) Results from survey can be used to identify dependencies in design schedule Rich Stanek

Tuner selection 1. Identify the down-selection item. 2. Identify the proposal & proposer of the technology. 3. Make comparison tables for advantages & disadvantages from each proposer. 4. PM Make fair-minded comparison table to be filled in by each proposer. 5. PM decide the technology according to the table. ✔ ✔

Slow Tuner TTF INFN/FNAL STF Saclay -1BladeSlide JackBall Screw Lifetime Test (~ 0.1mm x Times) is necessary. Mechanism Double LeverBlade+Lever+ScrewWedge+Screw+GearScrew+Worm Gear Blade has the potential Problem of Fatigue? Life time of Coating? Stiffens N /  m Seems not stiff enough Seems not stiff. If used to TESLA Cavity DLD at Flat- Top becomes ~900Hz. Strokemm < Long enough Location Beam PipeJacket Cylinder The room for tuner is small. Top Heavy. Alignment? Cost comparison table for baseline tuner selection Need to develop the table!

Fast Tuner TTF INFN/FNAL STF Saclay -1BladeSlide JackBall Screw Piezo(200V) Piezo(150V)Piezo+Blade Speed ? Blade has the potential Problem of Fatigue. Speed ? NORIAC (1 Spare) Piezo Mechanic x 1 Sizemm10 x 10 x 2610 x 10 x 38φ20 x 18 Stiffness N /  m Max. LoadkN4414 Stroke:RT mm Stroke:2k mm 462 Compensation mm Speed Delay 0.6 msec. Repairability Motor need Disassemble OutsideAccessible? Piezo need Disassemble RepairableAccessible? US Study on this Subject exists. How to check Piezos just we install. There are no experience for long term operation in Pulsed mode. Life time Test is necessary. Cont.

Would like to call Tuner discussion as follows; for DESY (Saclay) Tuner, for INFN Tuner, for KEK (Noguchi) Tuner, …. Later, KEK (Higashi) Tuner, discussion of Lorentz detuning compensation. discussion of motor/piezo maintainability.

Would like to call Coupler discussion as follows; for strategy of using fixed coupling for improvement of coupler process.