Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
A longitudinal damper for the PS (preliminary ideas) 24 April 20121M. Paoluzzi BE/RF.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Feedback and Beam Control Section (FB) Activities and Highlights 2014 Outlook Wolfgang Hofle FB Section at 2014 RF Group Meeting - December
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
KEK Participation in the LHC Injector Upgrades C. Ohmori, KEK/J-PARC M. Paoluzzi, CERN 10 PSB cavitiesPS Damper cavities.
Jan 30, 2008MAC meeting1 Linac4 Low Level RF P. Baudrenghien with help from J. Molendijk CERN AB-RF.
PSB DSP Based Low Level RF Operational Experience. April 2015 M.E. Angoletta, A. Blas, A. Butterworth, A. Findlay, S. Hancock, M. Jaussi, J.Molendijk,
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Collected by E. Jensen, BE-RF 1 ATOP days RF limitations.
AB-RF-FB LLRF Developments at CERN Historic Overview, Highlights, Future Challenges Flemming Pedersen.
Summary of CERN/GSI Meeting on RF Manipulations and LLRF in Hadron Synchrotrons, March
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
PSB RF bypasses + PSB TFB electronics A. Blas PSB-LIU meeting04 Jun Executive summary: Components for the PSB rf-bypasses will be installed (Joao.
RF and Transverse Dampers Current Systems Wolfgang Hofle W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Acknowledgements: RF.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian Chase,Paul Joireman, Philip Varghese RF Embedded Systems (LLRF) Group.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
A.Blas APC meeting 12/5/ Status of the PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman (PU amplifiers) T. Bohl, W. Hofle,
PSB Finemet upgrade: overview, preliminary results & planning LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J. Sanchez Quesada (RF/FB, RF/CS)
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
PSB – Linac 4 Synchronization Alfred Blas PSB with Linac 4 Working group meeting 24/04/ Summary of discussions held with M.E. Angoletta, C. Carli,
Injector RF and Synchrotron RF Present Status, Activities, Plans PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 1.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
RF system & magnetic PU ELENA review meeting CERN, November 2015 M.E. Angoletta, S. Hancock, M. Haase, M. Jaussi, A. Jones, J. Molendijk, M. Paoluzzi,
Brief summary of Finemet Review 9-10 September S. Gilardoni.
Coupled bunch instabilities in the CERN PS
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
CERN LEIR Low Level RF Maria Elena Angoletta AB/RF CERN, Geneva on behalf of the LEIR LLRF team Invited Talk 55 LLRF05: Workshop on Low Level RF CERN,
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
FPGA Mezzanine Card standard IO-modules for the LLRF beam control system of CERN’s PS Booster and MedAustron synchrotron M. E. Angoletta, A. Blas, A.
Experience with the commissioning and operation of the new CERN Digital LLRF family M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J. Sanchez Quesada,
DLLRF: existing & possible applications M. E. Angoletta, M. Jaussi, J. Molendijk, J. Sanchez-Quesada CERN, BE/RF Finemet ® Review, September 2015.
An RF Low-level Beam Control system for PS Booster built in VME VXS using FMC mezzanines M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi,
Recent LLRF Developments at CERN and New Projects Wolfgang Hofle on behalf of BE-RF-FB and BE-RF-CS Section LLRF'15 Shanghai, China - W.Hofle CERN Lab.
Digital Receiver and Modulator Architecture for Multi-harmonic RF Finemet Operation 03/11/2015 LLRF15: Digital Receiver and Modulator Architecture for.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
EUROTeV Diagnostics WP5
For Diagnostics and Deceleration Flemming PEDERSEN
CERN’s PS Complex LLRF consolidation:
Controls & software Andy Butterworth.
ELENA Beam Instrumentation
the FIRESTORM project Real-Time distribution of
L4-PSB working group meeting 25/06/2009
Jorge Sánchez-Quesada BE-RF-FB
Working groups status report on Feedbacks
Injectors BLM system: PS Ring installation at EYETS
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
The ELENA BPM System. Status and Plans.
LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J
Low-level RF consolidation of the CERN PS Complex machines
M. Mehler1), H. Klingbeil1), B. Zipfel2)
"Research and Development in Beam Diagnostics"
Head-Tail Monitor for CC Diagnostics
Maria ELENA Angoletta for the RF team
ELENA / AD Pick-ups and Schottky
Presentation transcript:

Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN, September 2011

1.What 2.How 3.Possible external contributions 4.Conclusions 5.ReferencesOutline M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting

Actions: beam capture, deceleration & synchronisation (inj + extr). 1. What: RF Components: Qualitative ELENA cycle & RF actions.  Schottky Longitudinal Pick-ups (LPUs) : based on AD LPUs design  Cavity  Low-level RF (LLRF) From CERN injectors’ RF consolidation M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 1

M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 2 1. What: Schottky diagnostics Actions: beam parameters calculation on whole ELENA cycle  Debunched beam: Schottky scans (Np,  p/p,, averaged spectra)  Bunched beam: Np + bunch length from RF currents Main components:  Signal detection: Schottky LPUs (same as for RF part)  Real-time digital signal processing: LLRF hardware  Based on AD Schottky diagnostics  Essential machine diagnostics, used for >10 year  Usage: machine/cooling monitoring, optimisation, debugging  Included in RF WP as closely interlinked to LLRF

1.What 2.How 3.Possible external contributions 4.Conclusions 5.ReferencesOutline M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting

2. How: overview Working Se t OASIS Reference editor Tomoscope LLRF interface Controls Schottky diagnostics M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 3 BTrain, injection/extraction references, timings Local CR LLRF & DIAGNOSTIC DATA PROCESSING Ring beam LPUsCavity

2. How: Cavity  Material: ferrite vs. magnetic-alloy (Finemet)  Low-voltage broadband cavity + ampli  Important item in injectors HLRF renovation [1]  Finemet (FT3M) cavity deployed in CERN’s LEIR [1]. [2]  Low-loss Finemet (FT3L) [2] cavity will be tested in CERN’s PSB.  Collaboration with MedAustron on HLRF.  BW: 145 kHz → 1.06 MHz  Controlled voltage range: 0.7 mV → 11 V NB: > 80 dB dynamic range, challenging for LLRF !!! Finemet ring (courtesy G. Kotzian, MedAustron).  Finemet is the likely choice M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 4

2. How: overview Working Se t OASIS Reference editor Tomoscope LLRF interface Ring BTrain, injection/extraction references, timings Local CR Controls Schottky diagnostics beam LPUsCavity LLRF & DIAGNOSTIC DATA PROCESSING M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting

2. How: Longitudinal Pick-Up (LPU) LPU (LF + HF) currently installed in the AD  Usage: [3]  Non-trivial development based on AD LPU [3]  Space limitations + components obsolescence → re-design likely needed.  BW : 20 kHz → 20 MHz.  2 separate LPUs (HF + LF) + head amplifier  Summing unit in local CR  Beam phase loop in LLRF  Longitudinal Schottky scans (if noise low enough) M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 5

2. How: overview Working Se t OASIS Reference editor Tomoscope LLRF interface Ring BTrain, injection/extraction references, timings Local CR Controls Schottky diagnostics beam LPUsCavity LLRF & DIAGNOSTIC DATA PROCESSING M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting

2. How: LLRF & Schottky diagnostics  CERN RF new standard for Meyrin injectors [4]  Evolution of CERN’s LEIR system [4]  Backplane: VME Switched Serial (VXS)  Motherboard: 2 x Virtex5 FPGAs + SharcDSP 400MHz  Daughtercards: FPGA Mezzanine Card Standard (FMC) [5]  H/w + part of code (DSP, FPGA) from RF injectors consolidation [5]. [6]  Diagnostics: precise data processing specs from AD experience [6]. Some schematics & pictures of new h/w  State-of-the-art digital h/w + signal processing M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 6

2. How: LLRF & Schottky diagnostics OPTIONAL Block diagram of the ELENA RF & Schottky diagnostics system. M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 7

1.What 2.How 3.Possible external contributions 4.Conclusions 5.ReferencesOutline M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting

3. Possible external contributions 1. Cavity 2. Schottky Longitudinal PU  Estimates are for copy of existing AD Schottky LPU.  Re-design likely needed.  Possible external help  No outsourcing required M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 8

3. Possible external contributions – cont’d 3. LLRF  Possible & in collaboration with BE/RF. M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 9

3. Possible external contributions – cont’d 4. Digital signal processing  DSP + FPGA development (~0.5 FTE): possible & in collaboration with BE/RF.  Diagnostic-specific application (~0.3 FTE): possible & in collaboration with BE/RF. M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 10

4. Conclusions  ELENA project will profit from RF injectors consolidation (HLRF + LLRF).  AD experience: M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 11  Invaluable starting point for new developments  Enables precise specs for digital signal processing  External collaborations welcome!  Identified areas for possible external contributions. … Now the ball is in your court…  Tight manpower:

5. References R. Garoby, M. Haase, P. Maesen, M. Paoluzzi, C. Rossi, C. Ohmori (KEK), “The LEIR RF System”, PAC05, Knoxville, USA, May C. Ohmori et al., “Developments of Magnetic Alloy Cores with Higher Impedance for J-PARC Upgrade”, IPAC01, Kyoto, C. Gonzales, F. Pedersen, “An ultra low-noise AC beam transformer for deceleration and diagnostics of low intensity beams”, PAC ’99, NY, M. E. Angoletta, J. Bento, A. Blas, E. Bracke, A. Butterworth, F. Dubouchet, A. Findlay. F. Pedersen, J. Sanchez-Quesada, “CERN’S LEIR Digital LLRF: System Overview and Operational Experience”, IPAC 2010, Kyoto, M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, P. M. Leinonen, J. C. Molendijk, F. Pedersen, J. Sanchez-Quesada, M. Schokker, “CERN’s PS Booster LLRF Renovation: Plans and Initial Beam Tests”, IPAC 2010, Kyoto, M. E. Angoletta, V. Chohan, M. Ludwig, O. Marqversen, F. Pedersen, “The New Digital-Receiver-Based System for Antiproton Beam Diagnostics”, PAC 2001, New York, [1] [2] [3] [4] [5] [6] M. E. Angoletta, 28 Sept 2011 “RF & Schottky WP for ELENA” First ELENA construction meeting 12