MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
LHC Wed 16 Sept 2015 Struggling with cryo o-night Tuesday - Wednesday 07:11 Injecting again 09:00 Dump on injection of train of 144 bunches, losses IP7.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
Theoretical studies of IBS in the SPS F. Antoniou, H. Bartosik, T. Bohl, Y.Papaphilippou MSWG – LIU meeting, 1/10/2013.
LHC First LHC Emittance Measurements at 6.5 TeV IBIC15 Melbourne, Australia 2015 Maria Kuhn 1,2 – September 16, 2015 F. Antoniou 2, E. Bravin 2, B. Dehning.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)
#1 Energy matching It is observed that the orbit of an injected proton beam is horizontally displaced towards the outside of the ring, by about  x~1 mm.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
PyHEADTAIL-PyECLOUD Simulations for LHC and HL- LHC Aaron Axford 27/05/20151.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
Schottky Summary of status and plans for YETS 15/16.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LHC Emittance Preservation MD 3 - Preliminary Results M. Kuhn, V. Kain, G. Arduini, J. Emery, W. Hofle, A. G. Ollacarizqueta, F. Roncarolo,
Bunch shortening along SPS bunch trains due to e-cloud G. Rumolo, G. Arduini, F. Roncarolo Show results from the data analysis of 2 coasts during the August.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
Momentum slip-stacking of the nominal I-LHC beam in the SPS Particle simulations (preliminary) T. Argyropoulos, E. Shaposhnikova LIU-SPS BD WG 30/01/2014.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
LHC Wire Scanner Calibration
Beam instrumentation MDs
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Space charge studies at the SPS
Wire, flat beams and beam-beam MDs in 2017
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD2490 Measurement of the TMCI threshold at flat-top
MD2490: Measurement of the TMCI Threshold at Flat-Top
Tuesday Nov 16th Fill 1492 into physics around 07.30
LHC Emittance Measurements and Preservation
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
LHC Morning Meeting - G. Arduini
Limits on damping times
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Saturday 7th May Sat – Sun night
LHC Morning Meeting - G. Arduini
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Transverse emittance measurements from FWS
News on TMCI in the SPS: Injecting high intensity bunches
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Operational Experience with LCLS RF systems
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Fri :52 Stable beams fill #2536
Another Immortal Fill….
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Measurement of the beam (transverse) emittances
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre

Overview Merit Assessing the capability of the Schottky monitors to measure tune, chromaticity and emittance Beam Single Bunch (1.1E11) / Pilot at Injection energy The Schedule 3:00Chroma scan on B2V with a Pilot (2.1E9 ), 4 reference points 3:50Chroma scan on B1H with Nominal (1.2E11), 3 reference points 5:10New fill with 1 pilot and 1 nominal B1 and B2 5:15Emittance blow up on B1H, 4 set-points 5:46Emittance blow up on B2V, 4 set-points 6:05Beam dump Note B2V is equipped with modified frontend electronics which still has problems with gating on 25 ns trains

B2V data, (pilot bunch) Distance between peaks = Synchrotron frequency w HIGH w LOW ΔfΔf How to get Δf, W LOW and W HIGH ? Gaussian curve fit How to deal with the Synchrotron peaks and the Coherent / Incoherent part of the signal? Strong `Smoothing` Coherent tr. signal Incoherent tr. signal

Schottky Tune vs. BBQ Tune B1H (nominal) Top Schottky noise fine-structure (Synchrotron lines) Bottom Schottky Tune result of many curve-fits BBQ Tune from Timber Tune drift RF modulation fsfs

Schottky Chroma vs. RF Modulation Chroma B1H (nominal) Width of Schottky sidebands varies visibly Schottky Chroma result of many curve-fits Ref. meas. Chroma from RF modulation Chroma. setpoints Time Modulation method BUT: ‘Smoothing’ Parameter α = very critical and had to be fine-tuned by hand!

Chroma fit: Needs a lot of fine-tuning Fitting results depend very much on the ‘Smoothing’ Parameter α Fitting algorithm needs more work … Modulation method α = normalized cut-off frequency of smoothing filter α = α = (no smoothing)

Emittance B1H (nominal) From 5:14 – 5:35 the emittance was changed by blowing the beam up with the transverse damper Note the bunch intensity also changed slightly from ~ 1.28E11 to ~ 1.26E11 Emittance from wire scanner Integrated linear Schottky sideband power 2 μm rad μm rad 1778 Linear Scale ! But the relationship needs investigation The power of the Schottky sideband changes visibly with Emittance

Conclusion Proton Schottky signals at Injection are Ok Tune and Chroma information was validated at the MD ≈ 2 min avg. time for one data-point Software (data extraction) problems Current fitting algorithm requires parameter fine-tuning  Needs a lot more work! Emittance measurement  Algorithm not yet investigated Hardware (instrument) problems 25 ns trains saturate the system, especially at Flat top!  Even when gating on a single bunch  Technical problems with single bunch gating (Reflections) At Flat top the Schottky sidebands become very narrow and small  Difficult to curve-fit