The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.

Slides:



Advertisements
Similar presentations
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Advertisements

NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Presented By: Mark Patterson ERCOT Manager, Demand Integration November 29, Minute ERS Pilot update to TAC 1.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
2011 Project Prioritization Troy Anderson ERCOT Program Management Office April 2010.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Item 5: PRS Report John Varnell 2014 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public August 28, 2014.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RATF Report to WMS Report of RATF meeting held March 3, 2014.
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
Capacity Forecast Model Mark Ruane Credit Work Group ERCOT Public October 15, 2014.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
1 Project Update and Summary of Project Priority List (PPL) Activity April 16, 2015.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
SAWG Update to WMS April 6 th, 2015 Brandon Whittle.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
September 25 and October 23, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 28, 2014 TAC Update to RMS 1.
Market Credit Working Group update to the Wholesale Market Subcommittee 09/02/
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
1 WMS Report TO TAC April 2007 (which is in March)
SAWG Update to WMS March 4 th, 2015 Brandon Whittle.
February 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 4, 2014 TAC Update to RMS 1.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
May 28, 2015 and June 30, 2015 Information Session TAC Meeting Update to COPS Michelle Trenary, July 15, 2015.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Reliability Unit Commitment Discussion with QMWG
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Market Credit Working Group update to the Wholesale Market Subcommittee 9/27/2017.
Project Update and Summary of Project Priority List (PPL) Activity to Date July 17, 2014.
Characteristics of Regional Power Markets
Presentation transcript:

The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting

WMS Update WMS overviewed the 2013 ERCOT retail DR/price response study – Quantified potential demand reductions during price spikes and 4CP intervals – The study marks significant progress in being able to assess DR impact, but the study did present some challenges – Frontier Associates concluded 432.5MW of estimated price response due to price spikes (>3,000) and 500MW due to 4CP intervals – Data collection for 2014 study will commence this fall

TAC Assignment List Update WMS Assignments From The TAC DateAssignmentStatus 7/9/12 Consider long-term solution for credit requirements in light of revisions to System Wide Offer Cap The Market Credit Working Group is looking into insurance that would absorb monies owed due to market defaults. 9/5/13Review steps ERCOT utilizes in the CDR load forecasts ERCOT’s analysis of incorporating ERS, Load Resources providing RRS, energy efficiency, and distributive generation in ongoing (~Fall 2014) 2/27/14 Review Operating Procedure that ERCOT uses to determine when they need RUC (specifically RUC for bad weather) WMS plans to create a task force to conduct a review of the RUC process. Optimize market based tools and minimize RUC. 2/27/14 Related to NPRR582, Refinements to Testing ERS – address testing requirements for all Resources. QMWG review ongoing 2/27/14 Related to NPRR598, Clarify Inputs to PRC and ORDC – address additional ORDC enhancements including addressing bandwidth oscillations QMWG review ongoing 5/30/14Augmented ORDC NPRR 627 Augmented ORDC to Include Reliability Factor Methodology was referred to the RUC Task Force, however was rejected at PRS