Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.

Slides:



Advertisements
Similar presentations
Water Source Heat Pump Systems
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
André Augustinus 16 June 2003 DCS Workshop Safety.
The pumps should be tightened about once a month. If a new pump is installed, the pump should be initially tightened and then re-torqued one week later.
PRESSURE TEST Hook tester up to tank inlet line. Pump tester up to 10psi (.7 bar) The line and carb should hold pressure for 1-min. Checks for leaks at.
27/10/ PHOS Cooling status (1-27 Oct) Brief History: 28 Sep start cool down. Steps (by liquid) was: +17, +5, -3, -10, -15,
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
CHE 185 – PROCESS CONTROL AND DYNAMICS DCS AND PLC FUNDAMENTALS.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
Hydraulics For The Long Term
July 29, Update on the HBD Gas System Modifications Robert Pisani Brookhaven National Laboratory.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
The SPD cooling plant: status and plan of upgrades Rosario Turrisi.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
PLC Based sequential batch process CONTROL system
20/10/ PHOS Cooling status (1-20 Oct) Brief 28 Sep start cool down. Steps was: +5, -3, -10, -15, -20, -25, -30°C (by liquid).
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
André Augustinus 9 October 2006 Interlocks update.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
BGV 03-nov-2015CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and TS3 installation plans Valdir & Massi.
ALICE TC Meeting – CV Detcool1 LHC stop 31 May, 1-2 June – CV/DETCOOL Interventions Cavern interventions: 31 9:15: Sampling with RP.
HMPID maintenance activities during LS1 during LS1 Cosimo Pastore HMPID PLENARY MEETING March 22th, 2013.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
LS1 SSD PLANS 1.Cooling always on 2.SDD/SSD Cooling plant under UPS 3.Counter flow cleaning 4.Removing Teflon 5.Check safety valves 4 Sept 2012ITS Cooling.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
1 CERN - 19/03/2016 Claudio Bortolin CLAUDIO BORTOLIN INFN – PD / CERN.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
TC meeting P2 planning wks 3&4 A.Tauro
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
Industrial Resources, Inc.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
IBBelle: Status & Plans
University of Colorado – Boulder
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Rosario Turrisi INFN Padova
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Tracker cooling loop “check out” draft for discussion
ITS Cooling: Xmas Plan Claudio Bortolin.
CV maintenance works during YETS
IBBelle: Status Commissioning at MPP Transport to KEK
Forced draft cooling tower. NumberingEquipment A-1Storage Tank B-2Temperature sensor C-3Pump D-4Ball valve E-5Rotameter F-6Cooling water from the tank.
November technical stop activities:
Presentation transcript:

Claudio Bortolin

pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water valve: replaced (it was leaking) safety valve on the tank: replaced alarm security test: done upload new program PLC (ramp of p regulator SSD): done temperature sensors loop 17 & 18: replaced          F i n i s h e d

pump replaced dehydrator cartridge replaced inlet mechanic 1um filter replaced chilled water valve replaced (leak on the top) one of compressor was replaced some safety valves were recalibrated and installed (10 bar pump valve and 8,5 bar in the inlet manifold, 3,5 bar tank valves): done 10 safety valves on the loops (return side) replaced: more reliable test security alarm: done UPS integration: done          F i n i s h e d

The ≈500 kg C4F10 delivered 1 month ago are being analyzed

11:30 am - The cooling plant went in alarm and the detector was switched off The EN-CV colleagues found out that the problem was due to the PLC memory card that failed (reason unknown) 2:00 pm the card has been replaced, the PLC and cooling plant have been restarted SPD will be switched on again tomorrow morning early The flow rates in the drilled sectors didn’t change, there are some small losses in sectors 3,4 and 5 as expected

The CILK PVSS project (version 3.8) was developed by Marco Boccioli (ALICE DCS until end of 2009) In April 2010 the ALICE central DCS passed this task on to each detector Since then the CILK project was used but not updated Recently I was asked to take care of the CILK project. I met Marco Boccioli to discuss the basic requirements of the project The PLC programs were generated using S7 UNICOS by Stefan Lueders

This alarm appeared after IP address on the PLCs was changed the few weeks ago An alarm is still not acknowledged (SDD): to be fix only when the plant is switched off: S. Berry masked the alarm on the level of the plant PLC

The maintenance of the plants is over: thanks to the EN-CV colleagues for their co-operation The leak rate of the SPD cooling plant is not negligible: to be monitored during next weeks CILK project: I had a first meeting with Marco Boccioli; the logic of the PLC program can be improved (during LS1?) Alarm on SDD cooling not acknowledged. To be done as soon as the plant can be switched off    