FETS Laserwire Status David Lee 04.05.07.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
PS wirescanner calibration Student Meeting 10/03/2014 Carolina Bianchini BE-BI-BL.
CHRIS HOVDE, STEVE M. MASSICK and DAVID S. BOMSE
Visible Laser Light — Do Not Stare into Beam or View Directly with Optical Instruments Initials: __________Date: __________ CW power: ______________WType:
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
D. Schultz FAC 6/17/08 1 Undulator Travel and Girder Assembly Undulator commissioning Translation limits Interference The plan.
Selection Sort
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Installation of a Four-mirror Fabry-Perot cavity at ATF 1.Our setup/goal 2.Why 4 mirrors ? 3.The ATF 4-mirror cavity 4.The optical scheme 5.The laser/cavity.
Electronic Engineering Final Year Project Progress Presentation Title: Electromagnetic shielding techniques for inductive powering applications Supervisor.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet.
F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Selection Sort
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
WEEK 1 You have 10 seconds to name…
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
PASI OsC meeting 12th July 2012
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University March 2011 ALPG11 Eugene Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
FP7: EuCARD after a year of preparation… A.Jeremie.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
ESS wire scanner Benjamin Cheymol
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
Preinjectors Status D. Raparia April 26, 2016 Time Meeting.
ATF2 Status N.Terunuma, KEK
Laser-based Beam Diagnostics for the RAL Front End Test Stand
Test Beam Request for the Semi-Digital Hadronic Calorimeter
F.E.T.S. Mechanical Engineering Update
SLS Timing Master Timo Korhonen, PSI.
Secondary Storage.
continued on next slide
Conclusions of LCWS08 & ILC08, Chicago, November ‘08
                                                                                                                                                                                                                                                
CEBAF Injector Overview
continued on next slide
continued on next slide
پروفیل طولی یا نیمرخ طولی (Longitudinal Profile)
LARP Phase II Secondary Rotatable Collimator
Part 1 Q1 to Q5 of National 5 Prelim
On behalf of the Caltech Laser Group
Secondary Electron Emission and Photoemission Tests
continued on next slide

continued on next slide
Presentation transcript:

FETS Laserwire Status David Lee

David Lee UKNFIC Meeting Laser Last few safety bits to sort out –Should be ready to do some measurements next week Want to measure –Power stability CW and pulsed –Beam profile Longitudinal variation

David Lee UKNFIC Meeting Movable stages Control software written –Would be good to test CMM? Vacuum-suitable stages for one axis ordered –Need to work out what is required for other axis

David Lee UKNFIC Meeting Tank design Have done a couple of iterations Need to revisit once pepperpot/cold model/… is sorted May need to tune magnet electromagnetic design Hopefully see some results this calendar year!

David Lee UKNFIC Meeting Spare Slides

David Lee UKNFIC Meeting Laserwire device Laser photo-dissociation Electron Collection