GSZAJNB818\MSSQLSERVER_SORD,1500 Table – OC_ST_Plan_Transactions_BPF GSZAJNB818\MSSQLSERVER_SORD,1500 Table – vw_Site_Action_Register_BPF 1 3 2 4 3 Cancelled.

Slides:



Advertisements
Similar presentations
Training Course: Task List. Agenda Overview of the Task List Screen Icons across the top Making Appointments Viewing Appointments & Filters Working Your.
Advertisements

CP Chapter 4 Schedule Planning.
Using This Training This training contains a PowerPoint presentation that will guide you through the General Lab updates for the Cerner Millennium Upgrade.
Creating the Project Plan
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Manage Run Activities Cognos 8 BI. Objectives  At the end of this course, you should be able to:  manage current, upcoming and past activities  manage.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 12.1 PROJECT MANAGEMENT.
Quality Consulting Overview of Reports Module. Quality Consulting Dashboard Reports Dashboard Reports module provides project highlights for users of.
Quality Consulting Adaptive Processes Consulting Pvt. Ltd. An ISO 9001:2008 Certified Company This document is the property of.
Tom Lindstrom TL TooLs, Inc
ODOT Employee Intouch device training
Activator Chapter 5 Section 1
Rules for Successful Completion of Timesheets in Time Traq A Timesheet cannot be submitted by an employee if the employee has an un- submitted leave request.
Tracking progress on tasks and assignments TUTORIAL # 3.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
BSBPMG503A Manage Project Time Project Time – Covers all aspects of time and duration, from how long it takes to complete one activity right through to.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
How To Make a Graph (The Right Way)
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
Software Project Management
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
TESTING SERVICES Overview Testing Accommodations is a collaborative process between the DRC student, the Professor, and DRC. COMMUNICATION IS ESSENTIAL.
Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
10/14/10 BR – What type of Chart is this? Be sure to hand in this week’s bellringers!
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
Effective Meetings Tony Del Busso December 14 th, 2006.
0 On the day non-clinical cancelled operations (elective) Total non-clinical cancelled operations (elective) On the day non-clinical cancelled operations.
HP Project & Portfolio Management Entering Actual Hours for Project work July 11, 2007 CIMpleBS.com/HP-PPM/Training-Time Sheets.pps By Dan Gallagher See.
Models. make observations and form hypothesis make predictions and perform control experiments reject original hypothesis form theory data support hypothesis.
2010 Staff Development - Tony Judice. Highlight the area to be graphed. Highlight labels, in this case days of the week, and the values that apply to.
PAM Module PAM-Integration Amongst Systems COA NTES Train Running Data PAM COA Exceptional Information PRS Exceptions: Rescheduling Cancellation Origin.
WEEK 1 You have 10 seconds to name…
6. TRACKING PROGRESS. OBJECTIVES Save current schedule values in a plan as a baseline. Record progress on tasks through a specific date. Record tasks’
_name Workforce Timekeeper™ Employee Training Manual For D R. Reddy’s.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
1 GE Structured Services January 26, 2016 Agenda Sourcing GSE Unscheduled Lines Rogers / Southwick/ Deery Open Quote Review Celestino / Zajac / Deery GSE.
Welcome to Your ADP Workforce Now Manager Self Service Web Site
For sample use only. Reports do not reflect actual client information or all of the products or options available for each report. ©2013 Unum Group. All.
1 RSS User Guide for PSC USER ROLE. 2 User Guide Table of Contents PageContentPageContent 1Cover page19Invoicing-Attach Completed SO (s) to Invoice 2Table.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
© 2008 General Parts International, Inc. Written permission is required to copy or forward to anyone other than the intended recipient. TeammateTime Corporate.
Vendor Date VALU Monthly Project Review (VMPR) Project Name/IN #
Using MS-Project INFS MS-Project: 3 Major Parts 1. Project Planning 2. Project Execution & Tracking 3. Project Reporting.
Presentation title Presentation subtitle.
Student Accessibility Services Test Accommodation Orientation
Student Accessibility Services Test Accommodation Orientation
11 Scheduling.
Manage Project Time Introduction to Time Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Muslim Population Distribution Map
Lesson 12: Epic End of Day Status Procedure
Workforce Absence ManagerTM
= Models, Equations, & Explanation
Frozen Sequenced Scheduled
Room Booking System User Manual.
Resource Planning, Cost Estimation and Budgeting
High Urgency Personal or family illness or emergency.
Lesson 12: Epic End of Day Status Procedure
ADDITIVE VS. MULTIPLICATIVE RELATIONSHIPS
Take note or Add as Favourite
2 WOOD BADGE EARLY ON TIME LATE is on time is late Is unacceptable
Workforce Timekeeper™ Employee Training Manual For DR. Reddy’s
Work Breakdown Structure Tasks and Sub-Tasks
UR Procurement: Change Requisition Requester-Initiator
Thing / Person:____________________ Dates:_________________
TP002.
Lesson 12: Epic End of Day Status Procedure
DATA TABLES.
UR Procurement: Change Requisition Requester-Initiator
Presentation transcript:

GSZAJNB818\MSSQLSERVER_SORD,1500 Table – OC_ST_Plan_Transactions_BPF GSZAJNB818\MSSQLSERVER_SORD,1500 Table – vw_Site_Action_Register_BPF Cancelled tasks are tasks that were scheduled previously but not completed due to various reasons. These tasks need to be re-scheduled. A = C = 2 F = 4 Should fix the legend to reflect. All tasks with a scheduled date within the Week (scheduling week) at start of Schedule week All completed tasks during the schedule week Scheduled Date & Completion Date were in same week All tasks with a scheduled date within

KPI – Looks correct

KPI – should be SCHEDULED COMPLETION DATE before REQUIRED DATE

Total Work Completed = F Urgent Work + E Early Completed Work + D Late Completed Work + C Scheduled Work =F + E + D + C (for Scheduling Period) % Urgent work (F) = (F / Total Work Completed) x 100 % Early Completed Work (E) = (E / Total Work Completed) x 100 % Late Completed Work (D) = (D / Total Work Completed) x 100 % Schedule Work Completed (C) = (C / Total Work Completed) x 100 (% F) + (% E) + (% D) + (% C) = 100 % % Of Total Work Completed Analysis – Approved

Approval time <= 24 Hours Approval time >24 Hours Approval Time = Should be Selectable per FLM and then produce that FLMs Analysis bar charted per task. Number of Work Requests Approved Analysis – Approved

Create breakdown graph for work request types that were approved in scheduled week. Number of Work Requests Approved Analysis – Approved

Number of Urgent Work Requests by Impact type Urgent Work Impact = For BY Analysis – Approved

Urgent Work Scheduled Work Urgent Work = With Created Date in scheduled week Number of Work Orders Created Scheduled Work = With Created Date in scheduled week Analysis – Approved

Scheduled Work Status With Required Date in scheduled week = All tasks with statuses Work Requests = All Work Requests with statuses With Required Date in scheduled week Scheduled Work - Ready Complete Cancelled Work Requests - Tasks/WR Analysis – Approved

Scheduled Tasks With First Required Date in scheduled week = All tasks in WM Unscheduled tasks = With First Required Date in scheduled week Analysis – Approved, but would not be “Complete” status of WA, would be “Approved” and “Complete” for that week period.

Re - Scheduled Work = With First Scheduled Start Date <> Current Scheduled Start Date for All Tasks Analysis – Approved