 Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding electrical components dependent on varying mechanical.

Slides:



Advertisements
Similar presentations
Merchandise Assortment. Decisions, Decisions □Good planning is critical □Target market analysis □Merchandise decisions □Pricing decisions.
Advertisements

Mecklenburg County – Code Enforcement Land Use & Environmental Services Agency.
Other Circuit Components SPH4C. Equivalent Resistance: More Practice.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Week 3: End of Day P Progress Edge Organized page for ease of additional document addition Added New Documents.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Dr. Ralph R. Young Director of Software Engineering PRC, Inc. (703) Fifth IEEE International Symposium on Requirements Engineering.
Office Designs The Design Process at Work © MS Office Suite.
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Electronic Component Functions What is this component doing my in electronic device?
Applied Technology High School ATE 1012 Grade 10 Eng. Rose Hasan.
Module – 7 Eng.Islam Al-Jarrah.  Define energy.  Differentiate between the different forms of energy.  Draw energy transfer diagrams.  Give examples.
Final-Presentation Project “Kuala” Winter 2014 High Speed Digital Systems Lab Presented by: Stephen Taragin Supervisor: Boaz Mizrachi.
Michael Bova- Project Lead Kevin Alderfer- Lead Engineer Ryan Selig- Hardware Engineer P Navigation Aid for Visually-Impaired.
1 CMPT 275 Software Engineering Software life cycle.
Section 7-3 Computing the Costs of Credit
Purchasing Director’s Meeting MFMP 2.0 Upgrade Status February 15, 2007.
1 Transactions BUAD/American University Transactions.
Dr. Ralph R. Young Director of Software Engineering Systems and Process Engineering Northrop Grumman Information Technology (703)
Writing for Business Audiences
IMPROVED CONTAINER LIFTING FRAME (ICLF). IMPROVED CONTAINER LIFTING FRAME - MARK II (ICLF-Mk II) Quantum Engineering Design, Inc (QED) 01/28/04 OBJECTIVES.
Document Imaging and Workflow. An electronic file cabinet Rather than maintain paper documents, Feith allows for electronic files to be stored and sorted.
Installation Date Selection at Register - January Installation Selling Communication Sears Approved Provider Installation Date Selection at Register.
TESTING LEVELS Unit Testing Integration Testing System Testing Acceptance Testing.
TREADS Semester Review Dec. 14, Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
T HE A DMINISTRATION INFORMATION SYSTEM DESIGN AND CONSTRUCTION T HE A DMINISTRATION INFORMATION SYSTEM DESIGN AND CONSTRUCTION O F “S UMBER U TAMA ” I.
Bully Blue Lock Midterm Presentation 2014 Senior Design II.
Bicycle Powered Charger Kento Yamaguchi ECE 498 Design Defense Advisor: Professor Hedrick.
Safety demands strict documentation management (from initial requirements to the final design of the system) Bojan Zalar
Project Management. Introduction  Project management process goes alongside the system development process Process management process made up of three.
Midterm Presentation Senior Design II February 28, 2012.
Electricity & Magnetism Electricity. Beginning Task: Trade Science Fair Assignment #4 with your partner Use the Peer Review Form to provide feedback to.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Project Closeout Report. Closeout Components Project Objective Results Deliverable Results Lessons Learned Summary and Team Feedback Final Project Organization.
Meeting Practices Yan Wei Foundation Extreme programming is used Meeting practices are based on extreme programming technology with.
Patient w/ Drop foot Customer Previous Group Design Group Assistant to Patient Medical event (stroke,etc) Create large scale goals Interview customerAssigned.
Motor Assisted Wheelchair Design Review 10/01/15.
Electrical Work Practices City of Council Bluffs Presented by: SilverStone Group © 2012 Zywave, Inc. All rights reserved.
Internet of Things, Are You Ready?. Contents ●Introduction ●IoT Examples? ●IoT Benefits ○For Industries ○The Internet of Things In Organizations ○The.
Your Electricity Expenses During Winter and Summer Cooling fans are an essential component of any electronic system. The reason for this is that electronics.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Start the program by pressing “enter”.
Energy Control (Lockout/Tagout)
Explaining Electricity
Software and System Delivery
A Road Map to Food Safety
What is an electric circuit?
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
CPMGT 300 STUDY Lessons in Excellence--cpmgt300study.com.
SAFE WORK INSTRUCTIONS
Merchandise Assortment
Team 7 Technical Presentation
Tub Lift Rev. 2 Dom Group
Information Processing Cycle
P17001: Wearable Interface Design Iterations Team Intro & Background
Buy all of your electricity and magnetism needs here!
Tub Lift Rev. 2 Dom Group
System Construction and Implementation
Current Electricity and Electric Circuits
Energy and Circuits Energy
Team P16228: Magnetically Levitated Propeller
ISE – Systems Design Review
Executive Project Kickoff
Detailed Design Review: P18001
Conduct an Employee Review
Presentation transcript:

 Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding electrical components dependent on varying mechanical parts  Working on methods to attach and store electrical components (due Week 1 winter)  Test plans have been created for each component, will be ready to complete upon arrival

*Minimum Life Until Failure: As part of the design and testing process teams should consider ways to prove an expected life as listed. Previous tests on the device or tests conducted on components in a similar application will be acceptable. Methods of superposition or extrapolation of high wear components may also be considered.

 Electrical component selection will be finalized when verify mechanical component testing  Outstanding purchased parts ◦ electrical components for PCB and battery ◦ Steel for attachment ◦ Need to verify electronic attachment  Testing plan- need to verify power terrain, how to determine speed, full system testing

 oject%20Review oject%20Review

 Added individual owners to all risk items  Risk items more specialized, before was a generalization  Added specific tasks once finalized the system architecture with the locking mechanism  Customer needs have been identified, should be met based on current design

 Notes from Meetings ◦ General Meetings 20by%20Date 20by%20Date ◦ Feedback from Reviews es/ %20Systems%20Design%20Review.pdf es/ %20Detailed%20Design%20Review.pdf