Mechanical Components have been ordered and should arrive by Week 1 of winter quarter Outstanding electrical components dependent on varying mechanical parts Working on methods to attach and store electrical components (due Week 1 winter) Test plans have been created for each component, will be ready to complete upon arrival
*Minimum Life Until Failure: As part of the design and testing process teams should consider ways to prove an expected life as listed. Previous tests on the device or tests conducted on components in a similar application will be acceptable. Methods of superposition or extrapolation of high wear components may also be considered.
Electrical component selection will be finalized when verify mechanical component testing Outstanding purchased parts ◦ electrical components for PCB and battery ◦ Steel for attachment ◦ Need to verify electronic attachment Testing plan- need to verify power terrain, how to determine speed, full system testing
oject%20Review oject%20Review
Added individual owners to all risk items Risk items more specialized, before was a generalization Added specific tasks once finalized the system architecture with the locking mechanism Customer needs have been identified, should be met based on current design
Notes from Meetings ◦ General Meetings 20by%20Date 20by%20Date ◦ Feedback from Reviews es/ %20Systems%20Design%20Review.pdf es/ %20Detailed%20Design%20Review.pdf