Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.

Slides:



Advertisements
Similar presentations
Management’s preliminary comments to the ERC Report.
Advertisements

(Insert Title of Project Here) Kickoff Meeting (Month Date, Year)
CSU Chico Web Site A Unified approach to Governance, Management, and Accessibility.
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
John Stem 7 th Annual Summit on VR PEQA Louisville, Kentucky.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Davenport University Strategic Planning, Goal Development and Budget Process December 15, 2009.
Legislative Policy Committee ISAC Board approved concept at their meeting in December.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Roles Committees Meetings
TS, Length of YETS EYETS LIU & CONS Project
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
R.Schmidt TE-MPE-PE: members of the section Michael Jonker Mike Koratzinos Rüdiger Schmidt Daniel Wollmann – from 1 st November 2011 Arjan Verweij Carlos.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
HL-LHC Organization: Now and post HiLumi
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Dr. José Miguel JIMENEZ LS2 Coordinator, CERN 1 LS1 Debriefing day 31 st March, CERN.
Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
PH-DT comments on the organisation Livio Mapelli 14 October 2015.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Collaborative Action Research Option: Staff Development.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
CERN Construction Planning and Scheduling (LHC installation)
East Area Renovation Project Team meeting # 2 – EDMS News
Framework Schedule from EYETS 2016 to LS2
Injector De-cabling Project
Safety in Construction and Upgrade Phases
Looking back on 2014 and Perspectives for the MPE Group in 2015
As energy coordinator for CERN Accelerators & Technology
What has been learnt from LS1
CRG activities for EYETS 2016
Overview & baseline of LS2 and roadmap for CRG
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
Terex HR Process Timetable (1st half)
Budget & Planning Calendar.
2013 Terex HR Process Timetable (1st half)
Potential Milestones A timeline to finish in one year
(Insert Title of Project Here) Kickoff Meeting
Presentation transcript:

Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015

Dr. José Miguel JIMENEZ LS2 Project Leader, CERN Long Shutdown 2 (LS2) Project Project Scope & Mandate of LS2 coordinator (1/2) The project scope covers all activities carried out and resources needed in the context of Long Shutdown 2 over the whole CERN accelerator facilities. The mandate of the project coordinator includes: Prior to the start of the LS2, the definition of main works to be achieved over the LS2 and of potential options based on priorities given to activities. This study shall highlight in particular LS2 duration and resources needed for each option and be presented to the Directorate by mid-2016 for final decision; The definition of a CERN-wide “resource-loaded planning”, ensuring the compatibility of resources and planning across the LHC Machine and LHC Experiments; 2 LS2 Days 30 th September2015

Dr. José Miguel JIMENEZ LS2 Project Leader, CERN Long Shutdown 2 (LS2) Project Project Scope & Mandate of LS2 coordinator (2/2) The mandate of the project coordinator includes: (cont.) The preparation, coordination and follow-up till completion of all LS2 activities in the frame of the LIU, HL-LHC Projects and other CERN approved projects. Work packages will define: The work absolutely essential to achieve the LS2 objectives (activities which will bear a priority 1), which execution will be closely followed up by the LS2 coordinator; The work which can be postponed to the LS3 (activities which will bear a priority 2), which impact on LS3 will be assessed by the LS2 coordinator. The flexibility to use the end-of-year technical stops before and after the LS2 to decrease the load of the LS2 is left at the discretion of the LS2 coordinator and is also part of the scope of the project. 3 LS2 Days 30 th September2015

Dr. José Miguel JIMENEZ LS2 Project Leader, CERN Long Shutdown 2 (LS2) Project Project Priorities LS2 Priorities are, by decreasing priority: 1.Safety 2.Reliability of the accelerator complex 3.Approved projects¨ 4.Non approved projects LS2 Days 30 th September2015 4

Dr. José Miguel JIMENEZ LS2 Project Leader, CERN Long Shutdown 2 (LS2) Project Project Team Project LeaderJosé Miguel JIMENEZ Project Office ManagerJean-Philippe TOCK Project Planning ManagerKaty FORAZ PLAN Data Quality ManagerRachelle DECREUSE-MICHAUD Project Safety Coordinator for LHCThomas OTTO Project Safety Coordinator for InjectorsAna-Paula BERNARDES Still to be defined Hardware Commissioning in: Injectors, TBD (one-for-all, -by-machines, -by Complex, team?) LHC, TBD 5 LS2 Days 30 th September2015

Dr. José Miguel JIMENEZ LS2 Project Leader, CERN Long Shutdown 2 (LS2) Project Project Meetings Executive LS2 Meeting with representatives of Projects, Experiments, Departments and HSE Unit 8 th January 2016 LS2 Committees (LSC) as done for LS1 20 th November 2015 Mandate, Memberships, standard agenda,… Feedback from LS2 days. Plan status Announcement of Chamonix 2016 LS2 session 4 th December 2015 Reminder of scope Preparation of Chamonix (LIU/HL-LHC, non-/LHC Exp, PLAN+Schedule, Safety) Priorities Monthly meeting after Chamonix Increasing recurrence right before and during YETS / EYETS / LS2 6 LS2 Days 30 th September2015

Dr. José Miguel JIMENEZ LS2 Project Leader, CERN Long Shutdown 2 (LS2) Project Reporting line & Collecting information LS2 Coordinator will report: On a strategic level to the CERN A&T Director On a technical level to the LMC and IEFC if impacting Machines Collecting information Done through bi(multi)lateral meetings with Experiments, Groups, Teams and Projects Using PLAN tool already successfully used for LS1 Learning from LS1 experience… 2 Major meeting planed LS1 Debriefing Day planed on 1 st trimester’15 LS2 Day kick-off planed Sept’15 7 LS2 Days 30 th September2015

Dr. José Miguel JIMENEZ LS2 Project Leader, CERN Long Shutdown 2 (LS2) Project Main dates and milestones 8 LS2 Days 30 th September2015

Dr. José Miguel JIMENEZ LS2 Project Leader, CERN Long Shutdown 2 (LS2) Project Main dates and milestones 9 LS2 Days 30 th September2015 Main milestones: LS1 Post Mortem: 1 st trimester’15 Start date: Mid December 2018; Duration: 24 months (end 2020) Yearly “LS2 day” as of 2015 Activities declared in Plan by end’15 both for injectors and LHC; March’16, definition of activities for EYETS 2016; Mid’16, definition of activities for YETS 2017 and LS2; Preliminary “final” validation: mid LS1 Post Mortem LS2 Day PLAN is made available Consolidated List of tasks to Director A&T 1 st step final validation Final validation