APRIL 10, 2015. Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.

Slides:



Advertisements
Similar presentations
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
Advertisements

MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Telemetry System for RF cable interconnect monitoring sensors Design Review Mike Iannacone & Dmitri Yudanov Senior Project II.
Title. Preliminary Design2 Agenda Overview Life Cycle Model Data Flow Data Dictionary Constraints Prototype Summary.
CategoryCapability + Recommended Tool Analysis Self Service BI with Power View integration Ad-Hoc (e.g. user defined) views Interactive analysis.
Automatic Software Testing Tool for Computer Networks ARD Presentation Adi Shachar Yaniv Cohen Dudi Patimer
26-28 th April 2004BioXHIT Kick-off Meeting: WP 5.2Slide 1 WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution.
Semantic Interoperability Jérôme Euzenat INRIA & LIG France Natasha Noy Stanford University USA.
IT – DBMS Concepts Relational Database Theory.
COMP 410 Update!. The Problems Story Time! Describe the Hurricane Problem Do this with pictures, lots of people, a hurricane, trucks, medicine all disconnected.
October 30, 2008 Extensible Workflow Management for Simmod ESUG32, Frankfurt, Oct 30, 2008 Alexander Scharnweber (DLR) October 30, 2008 Slide 1 > Extensible.
Team 20 Advisor Dr. John Keenan 2:30 pm – 3:00 pm 3:00 pm – 3:30 pm Abstract Course scheduling is an integral part of the college experience. At the University.
Planning Iteration Demo Suunto Training Program Planner.
ABSTRACT Zirous Inc. is a growing company and they need a new way to track who their employees working on various different projects. To solve the issue.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
Team 1 Jesus Weibo Mina Yunming. Client’s Needs  Short term, medium term, long term plans  Simulation of energy system to provide affordable future.
MARCH 27, Meeting Agenda  Prototype 1 Design Goals  Prototype 1 Demo  Framework Overview  Prototype 2 Design Goals  Timeline Moving Forward.
Multi-agent Research Tool (MART) A proposal for MSE project Madhukar Kumar.
COMP 410 FINAL PRESENTATION. Agenda  Introduction of the Problem  Overview of NetFlow  Demo of Applications Built on NetFlow  The COMP 410 Experience.
GDT V5 Web Services. GDT V5 Web Services Doug Evans and Detlef Lexut GDT 2008 International User Conference August 10 – 13  Lake Las Vegas, Nevada GDT.
Volunteer Management System Presented by Team SE18-08S SE18-T08S - Jan 2012.
Components of Database Management System
COMP 410 Update. The Problems Story Time! Describe the Hurricane Problem Do this with pictures, lots of people, a hurricane, trucks, medicine all disconnected.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
CERN IT Department CH-1211 Genève 23 Switzerland t Internet Services Job Monitoring for the LHC experiments Irina Sidorova (CERN, JINR) on.
Proposal for Term Project J. H. Wang Mar. 2, 2015.
Clever Framework Name That Doesn’t Violate Copyright Laws MARCH 27, 2015.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Verified Network Configuration. Verinec Goals Device independent network configuration Automated testing of configuration Automated distribution of configuration.
Visualizing Peer-to-Peer Networks Final Presentation By Team SPEW.
EE/CS 481 Spring /28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill.
Example Template for Project Presentation
Actors and Use Case Diagrams Month Day, Year. Agenda Training Plan Overview Review Detailing Requirements with Requisite Pro Concepts Setting Up XDE Integration.
Ad Hoc Graphical Reports Ad Hoc Graphical Reports Copyright © Team #4 CSCI 6838 Spring CSCI Research Project and Seminar Team# 4 (
Microsoft Project Reporting with Reporting Services.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Implementation of a Relational Database as an Aid to Automatic Target Recognition Christopher C. Frost Computer Science Mentor: Steven Vanstone.
MSE Presentation 1 Lakshmikanth Ganti
Worldwide Protein Data Bank Common D&A Project Sequence Processing Modular Demo May 6, 2010 Project Deliverable.
Louisiana Tech Capstone Submitted by Capstone 2010 Cyber Security Situational Awareness System.
The SQL Applications Documentation Tool for Dublin City Council.
Clever Framework Name MARCH 27, Meeting Agenda  Framework Overview  Prototype 1 Design Goals  Prototype 1 Demo  Prototype 2 Design Goals  Timeline.
1 The Features of the IoT and Some Extension Considerations China Communications Standards Association Subin Shen 21th meeting CJK.
Library Online Resource Analysis (LORA) System Introduction Electronic information resources and databases have become an essential part of library collections.
MND review. Main directions of work  Development and support of the Experiment Dashboard Applications - Data management monitoring - Job processing monitoring.
Alex Turner Senior Program Manager Managed Languages Team Improve Your Code Quality using Live Code Analyzers.
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
Internet of Things. Creating Our Future Together.
LOGO e-Citizen. Phan Nhật Minh Phạm Thị Dinh Vũ Xuân Đông Phạm Thị Huyền Nguyễn Thùy Trang
AMSA TO 4 Advanced Technology for Sensor Clouds 09 May 2012 Anabas Inc. Indiana University.
ConfigMgr Discovering and Organizing Resources Mariusz Zarzycki, Phd, MCT, MCTS, MCITP, MCSE, MCSA.....
SOFTWARE TESTING Date: 29-Dec-2016 By: Ram Karthick.
Sponsored by Portakal Technologies
A Case Study: Automated Continuous Software Engineering Cycle (ACSEC)
Integrating Dropbox with Canvas
Clever Framework Name That Doesn’t Violate Copyright Laws
Proposal for Term Project
Microsoft Power BI with Azure Services
Supplier Recovery Claim Automation
COMP 410 Update March 13, 2015.
Building Innovative Apps using the Microsoft Developer Platform
Project management 102 – PLANNING
Virtual LANs.
SQL Server OLTP with Microsoft Azure Virtual Machines
Clever Framework Name That Doesn’t Violate Copyright Laws
REST Easy - Instant APIs for Your Database
Lecture 34: Testing II April 24, 2017 Selenium testing script 7/7/2019
March 27, 2015.
Presentation transcript:

APRIL 10, 2015

Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final Presentation  Questions & Answers

Prototype 2

Goals  Complete Data Aggregation  Synthesize different types of inputs into one or more different types of outputs  Increase the amount of data flow  Robust Connections  Demonstrate transmission failure and unintentional disconnection recovery  Network components directly related can detect device disconnects  System Diagnostics  Expand status logging of components, graphical network topology tool, and diagnostics tool

Progress  Complete Data Aggregation  Extended Prototype 1 structure to add automatically generated data in order to demonstrate scalability  Robust Connections  Reconnection after network failure between connected components  System Diagnostics  Parse network logs to display topology graphically  Log aggregation and filtering

Robust Connections TEAM LEAD – LUKE WANG

System Diagnostics TEAM LEAD – MAX PAYTON

Challenges  Complete Data Aggregation  Bottlenecks in Azure Database queries  Moving to Worker Roles from VMs more difficult than expected  System Diagnostics  Azure database connection problems prevented integration with Application

Final Prototype

Mitigation Plan

Final Presentation

Date & Location  Date: April 27th  Time: 4 PM  Location: McMurtry Auditorium

Format  Introduction of the Problem  Overview of the Framework Design  Demo an Application built on the Framework  Reflect on what we learned  The COMP 410 experience

Final Prototype  Efficiency  Recovery  Security  Extensibility  Testability

Final Prototype 1.High Volumes of Heterogeneous Data 2.Disconnections 3.Different Kinds of Devices 4.Human Interaction

Deliverables  Framework User Manual  Framework Code  Framework API Documentation  Example Application Project  Expect by May 6th