Beamline Update Adam Dobbs, MICE CM38 Feb 2014. Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

Target Status Report Lara Howlett University of Sheffield.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Acceptance Criteria for the Decay Solenoid Tom Bradshaw Mike Courthold Matthew Hills.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICE FAC Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MOM Report. Shield Wall – Gone Before During After 2.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
MICE MICE Target Mechanism CM38 – Napa Valley P J Smith on behalf of the MICE target team.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
S A Griffiths CM42 June 2015 Electrical & Control.
Spokesman's update.
K. Long Imperial College London/STFC
MICE Hall Summer Workplan
MICE Target Report Video Conference 29/11/07
Project Manager’s Report + DC/MoM Report
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

Beamline Update Adam Dobbs, MICE CM38 Feb 2014

Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary 02/2014A. Dobbs, Beamline Update2

Recent Activity 2013 was relatively quiet for the beamline... 4V activation run – Feb 13 Shifter training runs – July 13 TOF calibration runs – Aug 13 EMR commissioning runs and TOF calibration - Oct 13 Target higher rate commissioning run - Jan 14 BPS tripped ISIS for 20mins in summer, and for 1 hr during autumn due to blown fuse 02/2014A. Dobbs, Beamline Update3

Upcoming Activity BLOC training - Easter shutdown 14 BLOC volunteers are always appreciated – please consider if you can serve the experiment in this way and contact Henry Nebrensky Activation run at higher target rate – June 14 Pneumatic proton absorber installation - Easter 14 Since last summer, have the requirement that target be exercised monthly to give us warning of issues 02/2014A. Dobbs, Beamline Update4

Target: Status and Increased Rate Target mechanism in ISIS continues to work fine, 2.5 years after installation – quite a triumph! Need to consider future however, new ‘S’ series stator Plan to double the actuation rate with current stator, to 0.8Hz in response to ISIS' request Jan commissioning run without beam was a success, no problems encountered. Need to test with beam and check activation in sync Need to test full beamline chain with increased dip rate before end of Summer 14 See Paul Smith talk for details 02/2014A. Dobbs, Beamline Update5

Target: Laser Fibres Optical readout levels found to be decaying Believed due to radiation damage to plastic patch fibres local to target in ISIS Could not diagnose immediately in the summer because of higher activation in ISIS SP7 (no radiation surveys done between 2010 and point of concern, too long a gap) Changed fibres in Nov 13, which resolved problem All fibres now replaced, with armour cladding Remains an issue for the longer term 02/2014A. Dobbs, Beamline Update6

Target: New Stator Development of S-series target stator continues; has passed 10M actuations milestone! Intent is that ISIS will qualify the S-series target design to 10M actuations, but each assembly will be run-in in R78 to some level; rather than existing agreement of parallel running Again, see Paul Smith talk 02/2014A. Dobbs, Beamline Update7

Conventional Magnets Behaving themselves pretty well "Magnet-On" warning lamp system completed Mystery of Q4 Earth Leakage trips partly solved (see eLog entry 2552) All trips seen occurred while magnet overheating because of interruption to the chiller Chiller behaviour understood, not relevant to increased Step IV heat load Magnet performance a function of British weather... 02/2014A. Dobbs, Beamline Update8

Decay Solenoid: Damage report Damage suffered last summer to current lead Superconducting ‘tail’ between the helium vapour cooled copper current lead, and SC wire going to the magnet melted Control crate powered off before system expert had finished using it Has lead to a long off time for DS ~ 1 year 02/2014A. Dobbs, Beamline Update9

Decay Solenoid: Repairs undertaken SC wire replaced, involved removal of current led turret, solder new SC tail on, and replacement of copper lead Vapour cooled pipe had to be cut and new VCR joint welded in position to reattach. Joint has now been pressure tested Repair work also included removal and replacement of some voltage taps and MLI in the area. Crate replaced (aside: need to watched cleanliness of hall!) 02/2014A. Dobbs, Beamline Update10 Vapour cooled current lead removed from turret

Decay Solenoid: Status and Plans DS vacuumed out and cold Power up magnet in March to check repair job Install new quench detector Install the new power supply Some fridge maintenance and fridge control PC needed 02/2014A. Dobbs, Beamline Update11 New VCR Joint

Decay Solenoid: Update from last week Helium flow-meter on the DS radiation-shield circuit found to be faulty, requires repair or replacement Following cleaning of the helium within the Linde fridge via its cold- trap, a nitrogen leak into compressor circuit was also discovered. Leak is quite large, nitrogen content increasing from 4.5ppm to ~70ppm in the first 24 hour period following cold-trapping Bottom line is that the DS cool-down is further delayed from last Monday (17th Feb) by at least 3 weeks, with an earliest start date of 10th march 23/02/2014A. Dobbs, Beamline Step IV Preparations12

Proton Absorbers Pneumatic absorbers nearly complete EPICS-based control GUI Some modification to control box for connectors needed Testing Install during ISIS Easter shutdown 02/2014A. Dobbs, Beamline Update13

Summary Target looking in good shape, higher rate seems good but needs full testing, fibre decay issue needs a long term solution Conventional magnets are all well DS suffered damage, lessons to learn, but repairs well underway New proton absorber system almost ready Age-related fragility of the equipment is becoming a bigger issue Response includes increased organisation: More detailed shifter training (two full days) introduced last year Regular "practice runs" (not necessarily of the whole beamline together) More organised BLOC training, with more coverage of non-target systems Higher priority needed for maintenance activity e.g. cleaning the Hall See also Beamline Step IV readiness talk 02/2014A. Dobbs, Beamline Update14

02/2014A. Dobbs, Beamline Update15 Experiment

Questions 02/2014A. Dobbs, Beamline Update16