NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
LCLS-II Cryomodules Production Plans at Fermilab
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Cryomodule requirements Hitoshi Hayano, KEK for CFS consideration Asian Single Tunnel Design June 1-2,2010.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
The ILCTA_MDB Horizontal Test Stand for SRF Cavities Andy Hocker FNAL-TD AEM, 25-JUN-2007.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
3.9 GHz Cryomodule Shipment to DESY E.Harms on behalf of the Third Harmonic Effort Team (AD & TD, with help from PPD, FESS, BS)
Refurbished Booster RF John Reid October 24, 2012.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Beam Test status and Plans of the ILC Main LINAC BPM
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
LCLS-II Cryomodules Production at Fermilab Tug Arkan, 7/17/2014.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Cryomodule Assembly Facility (CAF) at Fermilab: Feasibility Overview for Project X & future SRF Cryomodules Assemblies Tug Arkan February 21, 2012.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
- CT INSTALLATION PROCEDURE OVERVIEW -
Meeting for S1-Global module design Cryomodule and Cryogenics
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
S1-G Webex meeting Global Design Effort
C50 Cavity pair Assembly Changes
XFEL Vacuum System Commissioning
KEK injector cryomodule
Teleconference ACS – FREIA 20th February 2018
IMP Cryomodule Assembly and Alignment
Cryomodule Assembly Plan
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms

E. Harms 3 July Status Couplers installed –<1 week from beginning warm conditioning –Couplers under vacuum –Warm RF measurements completed, coupler motion verified All signal connections made and verified Vacuum leak discovered on 2  circuit during final leak check at NML

From the in-situ leak checks at NML, the leak is located within the close vicinity of the Ti bellows between the magnet and cavity #8 on the 2-phase pipe Courtesy of Tug Arkan/TD E. Harms 3 July  leak

1.In-situ in the NML cave – not feasible due to tight space and reachability limit (~1 meter inside from downstream end) to the area to locate the exact location of the leak 2.In-situ at NML floor – does not seem feasible due to reachability limit to the area for any kind of repair even we can locate the exact location of the leak 3.At CAF-ICB (partial cold mass disassembly) 4.At CAF-ICB and CAF-MP( (full cold mass disassembly) Courtesy of Tug Arkan/TD E. Harms 3 July Repair Options

CM-2 prepared for removal and transport including leak checks on all circuits – no other leaks found Transport from NML to ICB – completed 26 June –Max. quad acceleration = 0.23 g (vertical) –Max. isolation fixture acceleration = 0.2 g (vertical) –Max. base frame acceleration = 0.45 g (vertical) Diagnosis, repair, and full checkout – estimate 7-9 weeks –RF checks and cable disconnects in progress –Plan for disassembly prepared by Tug –Estimate 2 weeks to extract cold mass assembly –Diagnosis and repair to follow E. Harms 3 July Repair Plan

Photoinjector Gun installed and aligned on girder –Initial checks in progress –First RF soon (July) E. Harms 3 July Meanwhile…

6 Thank you for your attention E. Harms 3 July 2012