1 WMS Report To TAC October 2007. 2 In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Three Staff.

Slides:



Advertisements
Similar presentations
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Advertisements

DSWG Update to WMS May 17, DSWG Goals Update.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
Loads Acting as a Resource Relationships with QSEs and LSEs
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Review of Proposed Zonal Market Improvements ERCOT Board of Directors Meeting February 17, 2009 Dan L. Jones Potomac Economics Vice President Director,
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
ERCOT Emergency Interruptible Load Program Paul Wattles Steve Krein WMS Oct. 13, 2006.
2007 ERCOT SOM Report Recommendations Dan L. Jones Vice President Director, ERCOT IMM Potomac Economics ERCOT Wholesale Market Subcommittee Austin, Texas.
Evaluation of Historical and Proposed Alert and EECP Pricing True North Associates 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
Operations Report Kent Saathoff System Operations ERCOT.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Review of PUC Discussion on Nodal Market Adoption Technical Advisory Committee September 7, 2005.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
EILS Discussion February WMS. Charge to WMS from PRS The benefit. The cost based on the EILS PRRs. Changes in Market since April 17, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Operations Update ERCOT Board Meeting March 18, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
Emergency Interruptible Load Service Paul Wattles ROS Subgroup Feb. 7, 2006.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Report to WMS September 19, 2007.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
Presentation transcript:

1 WMS Report To TAC October 2007

2 In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Three Staff reports Three Staff reports

3 Staff Reports Closely Related Elements (CREs) Closely Related Elements (CREs) List approved by WMS List approved by WMS CRR transition Plan CRR transition Plan Endorsed by WMS Endorsed by WMS Continued CRR/CSC/zone transition planning Continued CRR/CSC/zone transition planning

4 Every month from Jan to Nov 08, ERCOT will, as usual, divide the 2008 annual auction TCR/PCR revenues into monthly revenues in the same proportion as ERCOT’s monthly energy forecast (see graph below) and distribute them to QSEs based on their Load Ratio Share (LRS). Every month from Jan to Nov 08, ERCOT will, as usual, divide the 2008 annual auction TCR/PCR revenues into monthly revenues in the same proportion as ERCOT’s monthly energy forecast (see graph below) and distribute them to QSEs based on their Load Ratio Share (LRS). In Dec 08 (when TCRs/PCRs are no longer in effect), ERCOT proposes to refund remaining 2008 TCR/PCR annual auction revenue to TCR/PCR owners based on TCR/PCR purchase allocation % (see formula below). In Dec 08 (when TCRs/PCRs are no longer in effect), ERCOT proposes to refund remaining 2008 TCR/PCR annual auction revenue to TCR/PCR owners based on TCR/PCR purchase allocation % (see formula below). JANFEBMARAPRJUNJULAUGSEPOCTNOVMAYDEC Total $ TCR purchases by TCR Account Holder in 2008 annual auction Total $ TCR/PCR purchases by ALL TCR Account Holders in 2008 annual auction TCR purchase allocation % = Refund to TCR/PCR Owner * = * * Total revenue for 2008 TCR/PCR annual auction Dec load forecast Total load forecast TCR purchase allocation % where *Note: For PCRs, purchase allocation % is based on $ amount paid, not equivalent TCR clearing price

5 Staff Reports Closely Related Elements (CREs) Closely Related Elements (CREs) List approved by WMS List approved by WMS CRR transition Plan CRR transition Plan Endorsed by WMS Endorsed by WMS Continued CRR/CSC/zone transition planning Continued CRR/CSC/zone transition planning

6 Working Group Reports QMWG Attempt to find a solution that will address the Reliability vs Scarcity debate Attempt to find a solution that will address the Reliability vs Scarcity debate

7 Reliability vs Scarcity Pricing Highlights Highlights Current system makes MW of balancing stack unusable due to discount factor. Current system makes MW of balancing stack unusable due to discount factor. ROS initiatives: ROS initiatives: dynamic discount factor dynamic discount factor Unannounced testing on HSL to account for weather differentials Unannounced testing on HSL to account for weather differentials

8 Reliability vs Scarcity Pricing Highlights Highlights Unload some units that are at the top, creating RRS. Redispatch of existing gen can give needed capacity instead of bringing on additional units. Unload some units that are at the top, creating RRS. Redispatch of existing gen can give needed capacity instead of bringing on additional units. PRR730 – no consensus, but need to continue discussion. PRR730 – no consensus, but need to continue discussion.

9 Reliability vs Scarcity Pricing Proposal Proposal Increase amount of RRS procured by 500MW Increase amount of RRS procured by 500MW Retain current 2300 & 2500 MW thresholds Retain current 2300 & 2500 MW thresholds Implement ex-ante Administrative Price Adjustments per flow chart presented by Dan Jones Implement ex-ante Administrative Price Adjustments per flow chart presented by Dan Jones An engineering study is needed for additional LaaR component of RRS. An engineering study is needed for additional LaaR component of RRS.

10 Zonal Congestion? EECP > Step 1 or Step 1 > 30 min? Y Y N N OOM for Short Supply or NSRS Deployed? Y N MCPE = CAP MCPE = SPD MCPE MCPE = Max (SPD MCPE, $150 to $250) Option 2

11 WMS Action WMS directs QMWG to write PRR(s) according to the QMWG proposal to increase amount of RRS procured by 500MW, retain current 2300 & 2500 MW thresholds, and implement ex-ante Administrative Price Adjustments per the flow chart presented by Dan Jones. WMS directs QMWG to write PRR(s) according to the QMWG proposal to increase amount of RRS procured by 500MW, retain current 2300 & 2500 MW thresholds, and implement ex-ante Administrative Price Adjustments per the flow chart presented by Dan Jones.

12 Long-term Solution Task Force Mission of finding alternative solutions to the emergency interruptible service that is required by Public Utility Commission of Texas (PUCT) Substantive Rule § The rule specifically requires the market participants to identify alternatives that are defined as long-term solutions. Any long-term solution must offer ERCOT the ability to avoid shedding firm load by bringing more resources online or curtailing load voluntarily. In this context, the PUCT is interested in the following: Better price signals leading up to an Emergency Electric Curtailment Plan (EECP) event; Bringing more resources (both interruptible load and generation) online through existing ancillary services; and Examining the priorities set by transmission/distribution service providers when shedding firm load. (ROS dealing with this issue)

13 Long-term Solution Task Force 8 Meetings held since April 8 Meetings held since April White Paper Developed and circulated to ROS and WMS White Paper Developed and circulated to ROS and WMS 6 Specific proposals are addressed in the White Paper 6 Specific proposals are addressed in the White Paper PUC Staff has generally adopted proposal 3 (Modification of Current EILS Program) and has published it. PUC Staff has generally adopted proposal 3 (Modification of Current EILS Program) and has published it. Commissioners “willing to wait” to analyze the Long-term solution proposed by Market Participants. Commissioners “willing to wait” to analyze the Long-term solution proposed by Market Participants.

14 LTSTF Proposals 1. Administrative Price Adjustment 2. Zonal Market Administrative Shortage Pricing and Procurement of Additional Reserves 3. Modification of Current EILS Program 4. Procurement of New Ancillary Service (Direct Load Control) 5. Procurement of Additional Reserves 6. Priority Pricing Proposal

15 1) Administrative Price Adjustment PRO’s Sends price signal during period of shortage (Currently little ability to determine need to curtail.) Sends price signal during period of shortage (Currently little ability to determine need to curtail.) May trigger response under existing programs May trigger response under existing programs Applies to both supply and demand Applies to both supply and demand Resolves price suppression related to OOME/C Resolves price suppression related to OOME/C Cons Not market based Not market based May trigger Peaker Net Margin May trigger Peaker Net Margin Significant system changes required Significant system changes required Short duration – therefore limited load response Short duration – therefore limited load response May be costly to market (order of magnitude more than EILS) May be costly to market (order of magnitude more than EILS) These proposals essentially create balancing energy service price floors based on triggers set by ISO Alert and EECP steps. The proposals suggest increasing the price floor as EECP progresses.

16 2) Zonal Market Administrative Shortage Pricing and Procurement of Additional Reserves PRO’s Sends price signal during period of shortage Sends price signal during period of shortage Provides price support to both LaaRs and generation. Provides price support to both LaaRs and generation. Provides for better frequency response Provides for better frequency response Cons May be more expensive than EILS May be more expensive than EILS May trigger Peaker Net Margin May trigger Peaker Net Margin Increasing the RRS hourly obligation to 2,800 MW, 50% allowed to be provided from under-frequency relay type Load Resources. For Intervals where ARRS > 2,500 and ERCOT deploys NSRS: MCPE = SPD MCPE + $50.00; for intervals 2,300<ARRS<2,500 SPD MCPE set to range of $ /MWh ; and for intervals where ARRS<2300 SPD set to CAP.

17 3) Modification of Current EILS Program PRO’s Provides ERCOT the tool it asked for Provides ERCOT the tool it asked for Easy to implement Easy to implement PUC already down the road PUC already down the road No system changes required No system changes required Cons Value of service unknown Value of service unknown Reducing quantity below 500 MW reduces the likelihood of avoiding any firm load shed Reducing quantity below 500 MW reduces the likelihood of avoiding any firm load shed Loads may already be participating in market (switching between demand side programs offers little additional benefits) Loads may already be participating in market (switching between demand side programs offers little additional benefits) Reduce the 500 MW Minimum requirement, Increase the $20 Million annual cost cap to $50 Million, removes the 500 KW/V size requirement.

18 4) Procurement of New Ancillary Service (Direct Load Control) PRO’s Provides real-time known and measureable demand response to ERCOT operations. Provides real-time known and measureable demand response to ERCOT operations. Brings in both small and large loads Brings in both small and large loads May offer performance during frequency disturbances May offer performance during frequency disturbances Cons Technology investment for larger loads Technology investment for larger loads Increased Risk of ERCOT Liability Increased Risk of ERCOT Liability “First of its kind” issues for ISO “First of its kind” issues for ISO Provides capacity payments for loads but not generators Provides capacity payments for loads but not generators Provides known and verifiable Direct Load Control by ERCOT of telemetered loads over 10 MW; provides for aggregation of smaller loads that can be statistically proven to provide response.

19 5) Procurement of Additional Reserves PRO’s No system changes No system changes Provides known benefits to prevent firm load shedding Provides known benefits to prevent firm load shedding Provides price support to both LaaRs and generation. Provides price support to both LaaRs and generation. May provide incentives for long-term resource adequacy May provide incentives for long-term resource adequacy Provides better frequency control performance Provides better frequency control performanceCons May be considerably more expensive than EILS May be considerably more expensive than EILS Requires new Engineering Study (Scope development underway) Requires new Engineering Study (Scope development underway) Completion date of Engineering Study tied to as of yet undefined Project Scope Completion date of Engineering Study tied to as of yet undefined Project Scope This proposal represents a compromise among proponents of the option of procuring additional RRS and/or NSRS. It is designed to increase the amount of operating reserves available to ERCOT by 500MWs through existing Ancillary Services and ensures both Load and Generation Resources have the opportunity to competitively bid against each other to provide the Ancillary Services.

20 6) Priority Pricing Proposal PRO’s Loads would be contractually committed to shed. Loads would be contractually committed to shed. Paid only the predicted value of their interruption Paid only the predicted value of their interruption Can use same performance metrics as EILS Can use same performance metrics as EILS Would be less expensive than the cost of new generation. Would be less expensive than the cost of new generation.Cons May result in distorted prices May result in distorted prices Requires price forecast from ERCOT. Requires price forecast from ERCOT. Requires price forecast before real-time for real- time prices. Requires price forecast before real-time for real- time prices. Nodal pricing will impose challenges to pricing model. Nodal pricing will impose challenges to pricing model. Energy consumers (“loads”) would contractually commit to curtail their purchase of electricity from the grid whenever the wholesale price of electricity reached various levels ($750/MWH, $1000/MWH & $1500/MWH).

21 2) Zonal Market Administrative Shortage Pricing and Procurement of Additional Reserves PRO’s Sends price signal during period of shortage Sends price signal during period of shortage Provides price support to both LaaRs and generation. Provides price support to both LaaRs and generation. Provides for better frequency response Provides for better frequency response Cons May be more expensive than EILS May be more expensive than EILS May trigger Peaker Net Margin May trigger Peaker Net Margin Increasing the RRS hourly obligation to 2,800 MW, 50% allowed to be provided from under-frequency relay type Load Resources. For Intervals where ARRS > 2,500 and ERCOT deploys NSRS: MCPE = SPD MCPE + $50.00; for intervals 2,300<ARRS<2,500 SPD MCPE set to range of $ /MWh ; and for intervals where ARRS<2300 SPD set to CAP.

22 WMS Action WMS accepts the LTSTF White Paper with edits only to the Specific Proposals submitted by the proposers. WMS recognizes that the QSE Managers Working Group is in the process of developing a PRR based on the combination of administrative prices and increased reserves similar to those outlined in the White Paper. WMS believes that the charge given to the QSE Managers Working Group is generally consistent with proposals 1 and 5 in the LTSTF White Paper, and will offer ERCOT the ability to reduce the probability of shedding firm load consistent with the Energy only market by bringing more resources online or curtailing load voluntarily. WMS advises TAC that the combination of improvements and enhancements that have been implemented since April 17, 2006 in combination with the PRRs under development by the QSE Managers Working Group, will constitute a Long-term Solution as contemplated by Substantive Rule

23 Changes in Market since April 17, 2006 Forecasting Model refinements Forecasting Model refinements Terminating Modified Competitive Solution Method Terminating Modified Competitive Solution Method Terminating CSC congestion constraint on BES MCPE Terminating CSC congestion constraint on BES MCPE Revised EECP and Alert process and procedures Revised EECP and Alert process and procedures Raised offer cap Raised offer cap

24 Calculation The value provided by EILS is the avoided cost of the outage prevented: The value provided by EILS is the avoided cost of the outage prevented: Value = Risk of outage * cost of outage = (1 event/15 yr) * ($6000/MWh * 1000MW * 4 hr) = $1.6M/yr

25 WMS Action WMS resolves that EILS as defined in Protocols is inconsistent with the energy only market design established by the Commission and supports the ROS resolution that the program does not provide the reliability tool ERCOT purports. Additional reasons are given below and WMS recommends that the program be discontinued: WMS resolves that EILS as defined in Protocols is inconsistent with the energy only market design established by the Commission and supports the ROS resolution that the program does not provide the reliability tool ERCOT purports. Additional reasons are given below and WMS recommends that the program be discontinued: 1) The cost of the program can potentially far exceed the economic value of lost load. 1) The cost of the program can potentially far exceed the economic value of lost load. 2) While EILS may reduce the amount and duration of firm load interruption, there is a very low probability that EILS will prevent the loss of firm load completely. 2) While EILS may reduce the amount and duration of firm load interruption, there is a very low probability that EILS will prevent the loss of firm load completely. 3) The greater issue for reliability in both the short and long term comes down to the lack of price signals for both load and generation and this is being addressed by the QSE PM group. 3) The greater issue for reliability in both the short and long term comes down to the lack of price signals for both load and generation and this is being addressed by the QSE PM group.

26 WMS Report To TAC October 2007