NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.

Slides:



Advertisements
Similar presentations
Module Ethernet Technology Module Ethernet Technology.
Advertisements

1 iHome Automation System Home Automation System Team: Million Dollar Contingency Regiment Adam Doehling Chris Manning Ryan Patterson.
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
Presented by Steve Lewey –Lake Washington School District 414.
Serial Interface on 195E products Configure Ethernet links first Troubleshooting and diagnostic of WLAN network Serial Data Transferred Over Ethernet.
ThruLink™ Fixed or mobile security systems Streaming secure, live video over a public network Replacement for leased lines Transmitting data securely from.
AJC - End To End Ethernet Ethernet Private Line (EPL) – Test Results September 2009.
Identifying SLC 500™ System Components. SLC 500 System Options  The SLC 500 line of processors comprises both fixed and modular processor styles.:
PRIMEX Aerospace Company Page 1 Connecting Online Inflight A Passenger’s Perspective.
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
Advancing eAutomation 2-port Ethernet to RS-232/422/485 Data Gateway ADAM-4570 Reported by Alex Hsueh IAG Web & Comm. PM
IRIG-106 CHAPTER 7 TELEMETRY DOWNLINK ETTC JUNE 2015 Balázs Bagó Zodiac Data Systems.
New product introduction:
Internet2 Dynamic Circuit Services and Tools Andrew Lake, Internet2 July 15, 2007 JointTechs, Batavia, IL.
Microgravity Science Glovebox Video Overview. Course: MSG05 Version: May 2014 For Training Purposes Only Course Description  Detailed presentation of.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Execute Tailored Procedures (XTP) Status POIWG – July 2015 Lamar Stacy.
Pg 1 Robonaut TIR Overview September 15, 2010 Beth Griggs Robonaut Ops Lead
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR Overview Charts August.
Introduction to Payload Planning Will Kirby (256)
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
Date: September 24, 2007 Allen Taylor/TBE/FD35 Page: 1 HPA Hand Posture Analyzer Hardware Setup KAYSER ITALIA SRL Piazza 185° R.A. Folgore, 2/ Livorno.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
Page No. 1 ISS_CM_019 (Rev 08/2009) Robonaut to ISS Project Hardware Overview Sponsoring Org/Office Code: National Lab Office / OZ1 Name of Forum: Ops.
1 Increment 1 Lessons Learned Many things are not happening as predicted. Major differences are: –Scheduling and stowage –Turnaround times for troubleshooting.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
MOL The Mission Operations Laboratory First Contact Package June 2011 NASA MSFC Huntsville, Alabama An Introduction to the Payload Systems Team (PLST)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
Baseline 12/09/10 TDC Day 5 Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Approved for Public Release; Distribution is Unlimited Ricardo Rodriguez.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
Data and Computer Communications Eighth Edition by William Stallings Chapter 15 – Local Area Network Overview.
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #31, January.
Networking on the International Space Station Presentation by Bradley Roach 10/09/2007.
Baseline 06/10/10 TDC Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
Robonaut Setup and Taskboard Training 5/2/2013 Curtis Kershner/ ER Dennis Bentson/
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
I29/30 Robonaut Training Strategy Team (TST) Mike Joseph Robonaut Training Coordinator Notice: Material contained.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory PAYCOM Cadre and PD Enablement PAYCOM 207 February 2015 – Rev H.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIC Flight Control Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
An Overview When Connecting to Yaskawa Drives Date: 8/14/06, Rev: PP.AFD.26.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.
Bodies In the Space Environment (BISE) Operations Summary Prepared by Amy Jupin Operations Lead EO
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #35 January 27-31, 2014 Ann Bathew EO03/Operations Directors.
This document is the property of EADS SPACE. It shall not be communicated to third parties without prior written agreement.Its content shall not be disclosed.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Video and the PIA Bryan Walls.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #32, July.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Delta Training Strategy.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Initial MELFI Facility.
195E Serial Interface SECTION 9 - Serial Interface.
Making an Ethernet Cable
LSG Capabilities LSG nomenclature: WV - Work Volume AL - Air Lock
The Medium Access Control
AMS Summary 16:00 on Tue 9 Jul 2019 (GMT 190) To
16:00 on Mon 8 Jul 2019 (GMT 189) To 16:00 on Tue 9 Jul 2019 (GMT 190)
Presentation transcript:

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video Capability/Scheduling Station Cameras and R2 Analog Lamar Stacy MSFC/EO03 (256) Approved for Public Release; Distribution Unlimited.

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 2 Increment 25/26 Robonaut Video Ops  Cabin video from G1 Camcorder from Node 2 Setup to view through Hatch; no cable drag-through Standard Definition analog video  Robonaut video sources “Tele Ops” Analog via AVIU connection to video downlink GigE Bit Video via Ethernet connection through OCA Tele Ops is Standard Definition analog video  Bandwidth The two analog signals will require 2 of the 4 video downlink channels Data bandwidth for OCA on HRFM increased from nominal 12 Mbps to 35 Mbps (includes overhead) Total bandwidth requirements for Robonaut will create a challenge to schedule any other concurrent MPC video

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 3 Increment 25/26 Robonaut Video Ops  Crew Procedure ROBONAUT ASSEMBLY AND DISASSEMBLY; Step 4 ROBONAUT CABLE CONNECTIONs Analog Video connections: Loc CodeStepActivity 4.7 BNC Video Cable 15ft P2 →|← J5 Robonaut AVIU 4.8 BNC Video Cable 15ft P1 →|← J1 Video In GigE Bit Video connections: Loc CodeStepActivity ISL4.9 ISL Ethernet Cable 15m (RJ45) →|← ISL Interface Panel (per InterfaceExecution Note) Panel Robonaut 4.10 ISL Ethernet Cable 15m (RJ45) →|← J2 Data

On Orbit Soak Time Critical 2-Crew 1-Crew Ground ROBONAUT-H/W-ASSY ROBONAUT-H/W-DISASSY ROBONAUT-SOAK-OCA ROBONAUT-SYS-P/U ROBONAUT-SYS-P/D ROBONAUT-VIDEO-SETUP 2:10 :40:30 < 2:12 2:10 ROBONAUT-SOAK-VID :10 Scheduled after stowage configuration - For SYS P/U there are two options: 5-min activity (crew flips switch then ground performs SW power on steps) or 10-min activity (crew flips switch then performs SW power on steps) Robonaut System Powered Ops Constraints: - Limited to 2.2 hrs of powered ops per session. - Must be powered off for 22 hrs after any powered ops session :05 or :10 :05