EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

11 This document contains DRS Technologies proprietary information. Copyright © 2012 DRS Technologies, Inc. All rights reserved. Halvorsen Parts Order.
Amateur Radio on the International Space Station (ARISS)
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST6 Training Multi-body modeling.
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
CIS101 Introduction to Computing Week 12. Agenda Your questions Solutions to practice text Final HTML/JavaScript Project Copy and paste assignment JavaScript:
Enlarging The Stream Image 1.Log onto the codian to view the stream. 2. Get to the class you are looking for. 3. Press the “Watch” for that class.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST4 Training Revising assemblies.
Preparing and Adding Multimedia. Speaker’s Notes This place used for writing important notes on the presentation slide that you will be talking about.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST4 Training Rendering assemblies.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Importing Foreign Data and Maintaining Associativity.
Life Long Learning and Self Assessment MOC Part 2.
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Cash and Cash Management.
242/102/49 0/51/59 181/172/166 Primary colors 248/152/29 PMS 172 PMS 137 PMS 546 PMS /206/ /227/ /129/123 Secondary colors 114/181/204.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Faculty Webpage Design Minimum Requirements. Go to: then High Schoolhttp://gcsc.groupfusion.net/
1 © 2001, Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID SQL 2005.
Backup. What to back up? Pictures Documents (include s if using Off Line Program) Video’s Music System Image – Programs – Registry – Operating System.
1 Alternate Navigation Methods Print Labels Any of the following navigation methods can be used in lieu of what was displayed in the Video Demonstration.
Doc.: IEEE /0129r0 Submission January 2006 Don Berry, Wireless Enterprise ConsultingSlide 1 Non Noise Interference Testing Notice: This.
1 Place Your Photo AND Logo on Your Home Page Website Manager Tutorials.
Last update 22/02/ :54 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD VO Registration procedure Presented by.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Preliminary Advanced Colloids Experiment – 2.
Introduction to Payload Planning Will Kirby (256)
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
A. Maillet, POIWG#25, Feb 3-5, Inc Experiments supported by CADMOS and using the EPM Alain MAILLET CADMOS
1 Increment 1 Lessons Learned Many things are not happening as predicted. Major differences are: –Scheduling and stowage –Turnaround times for troubleshooting.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
July 26, 2005 Nelda Allen/Colsa1 Configuration Management Process 2 Minor Changes (pages 2 & 5)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
Baseline 12/09/10 TDC Day 5 Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
EMCS Inc 13 Operations Gary Moore EMCS Ops Lead (256)
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
Baseline 06/10/10 TDC Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
PRO 232 Date: August 2011 Page: 1 MELFI PCS Displays PRO 232 November, 2014 – Rev I Form FD (Rev 3/8/04)
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL.
ISS Medical Program (ISSMP) Inc. 39/40 Training Strategy Team (TST) Sondra Fabian Inc. 39/40 Training Coordinator May.
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
Lisa Prendergast EO20/ Operations Lead January
EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
Avatar Explore PROPOSAL NUMBERS Not available SCIENCE TEAM Erick Dupuis, Canadian Space Agency RESEARCH OBJECTIVES Demonstrate an operational and technical.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Payload Operations and Integration Center MSFC Daily Summary for PDs.
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred)
Page No. 1 ISS_CM_019 (Rev 09/2011) Sponsoring Org/Office Code: OD Name of Forum: Date: July 2015 Dan Duncavage OD/Computer Resources iPad on ISS General.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
Revision E 12/19/12 PARC/E. Litkenhous JAXA-SDRM WGVOPN-PLC PRO-SDRM ACT-CMD 1:00 SpaceDRUMS Experiment Operations SDRM-EXP-POWER UP Nominal Operations.
Hudson Fare Files 103 – Alternate Fare Files
Program Management Portal (PgMP): Catalog and the Client
Upgrading To PowerPoint 2007.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Date, location 1.
You can insert a group photo by going to Insert → Image
Community Basics: Posting.
Presentation transcript:

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05 Session Day -1Session Day :05 Photo, Video, and Tape Measurement (Single Ops) :25 :30 BODYM-EQUIP-GATHER (can be the day before, if the day before make it flexible) REMINDER-BODYM (post-sleep) REMINDER-BODYM (pre-sleep) BODYM-EXP-OPS_SUB (before midday meal, as early as possible in crew morning) BODYM-EXP-OPS_OPR 1:55  Sessions required at FD15 (+/- 5 days), FD80 (+/- 7 days), and R-15 (+/- 15 days) for all subjects. Additional sessions (nominally carried as reserve) required at FD45 (+/- 7 days), FD105 (+/- 7 days), and FD135 (+/- 7 days) for all subjects.  Modified Ops may replace Single Ops during WLP/STP timeframe to satisfy Ku-Band requirements. When replaced, refer to the Photo, Video, and Tape Measurement (Modified Ops) slide.  Sessions for two subjects should be combined when possible. When combined, refer to the Photo, Video, and Tape Measurement (Combined Ops) slide.

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures :50 BODYM-NODE2-VID1 R5 :15 :55 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05 Session Day -1Session Day :05 Photo, Video, and Tape Measurement (Modified Ops) BODYM-EQUIP-GATHER (can be the day before, if the day before make it flexible) REMINDER-BODYM (post-sleep) REMINDER-BODYM (pre-sleep) BODYM-EXP-OPS1_SUB (before midday meal, as early as possible in crew morning) BODYM-EXP-OPS1_OPR 1:30  Sessions required at FD15 (+/- 5 days), FD80 (+/- 7 days), and R-15 (+/- 15 days) for all subjects. Additional sessions (nominally carried as reserve) required at FD45 (+/- 7 days), FD105 (+/- 7 days), and FD135 (+/- 7 days) for all subjects.  Modified Ops may replace Single Ops during WLP/STP timeframe to satisfy Ku-Band requirements. When not replaced, refer to the Photo, Video, and Tape Measurement (Single Ops) slide.  Sessions for two subjects should be combined when possible. When combined, refer to the Photo, Video, and Tape Measurement (Combined Ops) slide. :10 :25 :15 BODYM-NODE2-VID2 R5 :30 P/L-RSTRCT VID-CNFG BODYM-EXP-OPS2_SUB (before midday meal, as early as possible in crew morning) BODYM-EXP-OPS2_OPR :30 :25 :30

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:30 BODYM-NODE2-VID1 R5 :15 1:45 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05 Session Day -1Session Day :05 :30 BODYM-NODE2-VID2 R5 :30 P/L-RSTRCT VID-CNFG :05 Photo, Video, and Tape Measurement (Combined Ops) BODYM-EXP-NBP_SUB1 (desired before midday meal, as early as possible in crew morning) BODYM-EQUIP-GATHER (can be the day before, if the day before make it flexible) REMINDER-BODYM (post-sleep) REMINDER-BODYM (pre-sleep) BODYM-EXP-MEAS_SUB1 (before midday meal, as early as possible in crew morning)  Sessions required at FD15 (+/- 5 days), FD80 (+/- 7 days), and R-15 (+/- 15 days) for all subjects. Additional sessions (nominally carried as reserve) required at FD45 (+/- 7 days), FD105 (+/- 7 days), and FD135 (+/- 7 days) for all subjects.  Sessions for two subjects should be combined when possible. When not combined, refer to the Photo, Video, and Tape Measurement (Single Ops) slide. REMINDER-BODYM (pre-sleep) BODYM-EXP-MEAS_SUB2 REMINDER-BODYM (post-sleep) 2:10 :25 :30 :10 :40 BODYM-EXP-NBP_SUB2 :45

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures HRF1-SLAMMD-BMM_SUB (all subjects, sequentially, in any order) SLAMMD Body Mass Measurement Crew Commanding Unattended :30:15 :20 OR :30 OR :15 OR :20 :10 HRF1-SLAMMD-TRACK ESA-HRF1-DEACT (ESA) ESA-HRF1-ACT (ESA) HRF1-RACK/PC-TRACK 1:00 HRF1-RACK-PWRUP CMD HRF1-SLAMMD-SETUP OR HRF1-SLAMMD-SETUP1 OR (1 st performance/operator) HRF1-SLAMMD-SU CTRL OR HRF1-SLAMMD-SU CTRL1 OR (control run performed) (1 st performance/operator, control run performed) HRF1-SLAMMD-SU PARTL OR HRF1-SLAMMD-SU PRTL CR (SLAMMD partially deployed) (SLAMMD partially deployed, control run performed) HRF1-RACK-PWRDN CMD HRF1-SLAMMD-STOW OR HRF1-SLAMMD-STOW TMP OR HRF1-SLMD-STW TMP CR (SLAMMD left partially deployed (control run perform, SLAMMD left partially deployed) HRF1-SLAMMD-CTRL RUN (control run performed, assume 1 st session/increment :20 OR :10 OR :20  Sessions required at FD15, FD80, and R-30 (all +/- 30 days of photo, tape, and video measurement session; once every other month) for all subjects.  Sessions should be combined with concurrent SLAMMD sessions for other HRP experiments for all subjects.  This data may also be obtained using the Russian BMM device.

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO Baseline37/38 & Subs 8/8/13Nominal: Reserve: Inc 37/38 Working PTP 6/5/13 Nominal: Reserve: Ops: - Body Measures Photo, Video, and Tape Measurement (FD15, FD80, R-30 nominal; FD45, FD105, FD135 nominally reserve): 4.25 hrs/session. - Body Measures SLAMMD Body Mass Measurement (FD15, FD80, R-30; assume every other month): 0.83 hrs/session for one subject (setup-BMM-stow); 0.17 hrs for each additional subject (BMM) on same day; additional 0.17 hrs for 1st operator performance (assume once/increment, time covered by Pro K); additional 0.25 hrs for control run (every 6 months, time covered by Pro K this increment); 0.00 hrs/session when performed with Pro K (no additional time or BMM required). Nominal: Hopkins (36S I37/38 FE3): - 3 Body Measures photo-video-tape sessions (FD15, FD80, and R-30). - 3 Biochem Profile-Body Measures-Pro K SLAMMD sessions (assume 1st, 3rd, and 5th months) (session time covered by Pro K). Wakata (37S I38 FE6): - 2 Body Measures photo-video-tape sessions (FD15 and FD80). - 2 Biochem Profile-Body Measures SLAMMD sessions (assume 1st and 3rd months) (BMM time covered by Body Measures; setup-stow time covered by Pro K under Hopkins). Reserve: Hopkins (36S I37/38 FE3): - 3 Body Measures photo-tape-video sessions (FD45, FD105, and FD135). Wakata (37S I38 FE6): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). PPO Change Log *Crew Roll-up is not maintained real-time.

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO Revision A39/40 & Subs 12/12/13Nominal: Reserve: Inc 39/40 Working PTP 10/21/13 Nominal: Reserve: Ops: - Body Measures Photo, Video, and Tape Measurement (FD15, FD80, R-30 nominal; FD45, FD105, FD135 nominally reserve): 4.25 hrs/session. - Body Measures SLAMMD Body Mass Measurement (FD15, FD80, R-30; assume once every other month): 0.83 hrs/session for one subject (setup-BMM-stow); 0.17 hrs for each additional subject (BMM) on same day; additional 0.17 hrs for 1st operator performance (assume once this increment, time covered by Pro K); additional 0.25 hrs for periodic control run (every 6 months, time covered by Pro K this increment); 0.00 hrs/session when performed with Pro K (no additional time or BMM required). Nominal: Wakata (37S I39 CDR): - 1 Body Measures photo-tape-video session (R-30). - 1 Biochem Profile-Body Measures SLAMMD session (assume 5th month) (session time covered by Body Measures). Swanson (38S I39/40 FE3/CDR): - 3 Body Measures photo-tape-video sessions (FD15, FD80, and R-30). - 3 Biochem Profile-Body Measures SLAMMD sessions (assume 1st, 3rd, and 5th months) (BMM time covered by Body Measures; setup-stow time covered by Body Measures (1) under Wakata and by Pro K (2) under Wiseman). Wiseman (39S I40 FE5): - 2 Body Measures photo-tape-video sessions (FD15 and FD80). - 2 Biochem Profile-Body Measures-Pro K SLAMMD sessions (assume 1st and 3rd months) (session time covered by Pro K). Gerst (39S I40 FE6): - 2 Body Measures photo-tape-video sessions (FD15 and FD80). - 2 Biochem Profile-Body Measures SLAMMD sessions (assume 1st and 3rd months) (BMM time covered by Body Measures; setup-stow time covered by Pro K under Wiseman). (continued on next page) PPO Change Log *Crew Roll-up is not maintained real-time.

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes Reserve: Wakata (37S I39 CDR): - 1 Body Measures photo-tape-video session (FD135). Swanson (38S I39/40 FE3/CDR): - 3 Body Measures photo-tape-video sessions (FD45, FD105, and FD135). Wiseman (39S I40 FE5): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). Gerst (39S I40 FE6): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). pycmall /40 & Subs 2/19/14--Added exercise related reminder activity to reflect new direction to repeat pre-sleep exercise related reminders in next day’s post-sleep. hopsall /40 & Subs 4/4/14--Created activities to reflect new requirement to perform photo, video, and tape measurement as a combined session for 2-crew as optional ops. hopsall /40 & Subs 4/11/14--Changed video activity name from Lab to Node2 to reflect previous OCR’s PARD and procedure rev update to provide a better image for ground team. hopsall001230Revision B39/40 & Subs 8/1/14--Changed R-30 photo, video, and tape measurement session to R-15 with a +/- 15-day window to reflect payload ED rev update. EO10-PPO Revision C39/40 & Subs 8/18/14--Added PPO document number to reflect new EO10 OPR Configuration Control Plan for PPOs. PPO Change Log *Crew Roll-up is not maintained real-time.

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes parcall000039Review D41/42 & Subs 9/15/14Nominal: Reserve: Inc 41/42 Working PTP 8/6/14 Nominal: Reserve: Ops: - Body Measures Photo, Tape, Video Measurement (FD15, FD80, R-15 nominal; FD45, FD105, FD135 nominally reserve): 4.25 hrs/session. - Body Measures SLAMMD Body Mass Measurement (FD15, FD80, R-30; assume every other month): 0.83 hrs/session for one subject (setup-BMM-stow); 0.17 hrs for each additional subject (BMM) on same day; additional 0.17 hrs for 1st operator performance (assume 2 times this increment, time covered by Biochem Profile and by Body Measures one each); additional 0.25 hrs for periodic control runs (every 6 months, time covered by Pro K this increment); when performed with Biochem Profile or Pro K, no additional time or BMM required (payload carrying majority of time varies). Nominal: Wiseman (39S I41 FE5): - 1 Body Measures photo-tape-video session (R-15). - 1 Biochem-Profile-Body Measures-Pro K SLAMMD session (assume 5th month) (session time covered by Pro K). Gerst (39S I41 FE6): - 1 Body Measures photo-tape-video session (R-15). - 1 Biochem Profile-Body Measures SLAMMD session (assume 5th month) (BMM time covered by Body Measures; setup-stow time covered by Pro K under Wiseman). Virts (41S I42 FE6): - 2 Body Measures photo-tape-video sessions (FD15 and FD80). - 2 Biochem Profile-Body Measures SLAMMD sessions (assume 1st and 3rd months) (session time covered by Body Measures, includes 1st operator performance time). Reserve: Wiseman (39S I41 FE5): -1 Body Measures photo-tape-video session (FD135). Gerst (39S I41 FE6): -1 Body Measures photo-tape-video session (FD135). Virts (41S I42 FE6): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). PPO Change Log *Crew Roll-up is not maintained real-time.

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes hopsall001254Revision E41/42 & Subs 10/30/14--Decreased crew time to reflect adjusted setup, NBP measurement, and stow time based on data gathered from first 5 subjects. parcall000089Revision F43/44 & Subs 3/24/15Nominal: Reserve: Inc 43/44 Working PTP 2/27/15 Nominal: Reserve: Ops: - Body Measures Photo, Tape, Video Measurement (FD15, FD80, R-15 nominal; FD45, FD105, FD135 nominally reserve): 3.58 hrs/session. Nominal: Virts (41S I42 CDR): - 1 Body Measures photo-tape-video session (R-15). Yui (43S I44 FE5): - 2 Body Measures photo-tape-video sessions (FD15 and FD80). Lindgren (43S I44 FE6): - 2 Body Measures photo-tape-video sessions (FD15 and FD80). Reserve: Virts (41S I42 CDR): - 1 Body Measures photo-tape-video session (FD135). Yui (43S I44 FE5): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). Lindgren (43S I44 FE6): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). PPO Change Log *Crew Roll-up is not maintained real-time.

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO Revision G45/46 & Subs 9/21/15Nominal: 7.17 Reserve: 0.00 Inc 45/46 Working PTP 8/14/15 Nominal: 7.17 Reserve: 7.17 Ops: - Body Measures Photo, Tape, Video Measurement (FD15, FD80, R-15): 3.58 hrs/session. Nominal: Lindgren (43S I45 FE6): - 2 Body Measures photo-tape-video sessions (FD80 and R-15). Reserve: - N/A PPO Change Log *Crew Roll-up is not maintained real-time.