LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.

Slides:



Advertisements
Similar presentations
Welding Details.
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Types of Welds and Welded Joints.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Summary of Accelerator Systems Collimation Parallel Session 19 October 2007 LARP CM#9 - SLAC Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
LARP Rotatable Collimators for LHC Phase II Collimation 18 April 2007 LARP Collaboration Meeting – Fermilab Tom Markiewicz/SLAC Representing Gene Anzalone,
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 24 April 2008 LARP CM#10 Tom Markiewicz/SLAC BNL - FNAL-
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle1/20 Adapting the NLC Consumable Collimator to LHC Phase II Secondary Collimation.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
Summary Session Advanced Collimation CARE-HHH-APD BEAM'07 R. Assmann.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
LARP Contributions to LHC Phase II Collimation
Types of Welds and Welded Joints.
Automotive Engines Theory and Servicing
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LARP Phase II Secondary Collimator RC-1
SLAC RC Status Report US LHC Accelerator Research Program
Recommendations of 12/16/05 review committee & SLAC response
LARP Phase II Secondary Rotatable Collimator
23 April 2012 Tom Markiewicz/SLAC
LARP Phase II Secondary Collimator RC1
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
Types of Welds and Welded Joints
LHC Collimator – RF Contact Concept (180o wrap)
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
Types of Welds and Welded Joints.
Types of Welds and Welded Joints.
Types of Welds and Welded Joints.
Presentation transcript:

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status Revised 12/10/07

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 2 /12 Outline –Heater Test hardware & misc tests update –RC1 design progress

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 3 /12 Molybdenum Half Shafts & Copper Hub Halves braze preparations Expander Plug Retainer Ring Shafts are now ready to assemble into Mandrel

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 4 /12 Coil and Jaw brazing fixture Remaining fixture parts scheduled for completion on 12/17/07

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 5 /12 Moly U-Joint to Moly Shaft Braze Tests Pure Copper 25% Gold 75% Copper Wetting Test Samples confirm adequacy of Gold-Copper Alloy for a Moly-moly joint U-Joints actually get brazed with 35/65 so a additional wetting test is planned for 12/10/07. Fillets on outside of joint confirm that both gravity orientations of the U-joints during brazing will bond. Joint is good! However, alloy bonded the “diaphragm” to the “Shaft” end in several spots. A additional test with a wider gap will ensure full diaphragm travel. 35/65 alloy to be used for final test.

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 6 /12 RC1 Design progress –RF & Image Current System Concepts (see next 3 slides) Paired spiral style RF springs balance the loading on the RF “Sheath”. –Samples on order. Beam pipe id to 58mm square geometry is built into Tank ends. Thin copper “Curtains” bridge Tank end geometry to “End Socket”. End Sockets mount on ceramic ball bearings in Jaw ends. –Detail drawings of prototype bearing assembly to start this week. Spiral style RF spring retained in groove at each End Socket. –Samples in-house and tests are planned. RF Springs and Curtains stabilize End Socket during Jaw rotation.

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 7 /12 “Sheath” concept for transverse RF seal Paired spiral type RF Springs fit inside loop for balanced loading Sheath may require slits at 3mm intervals along loop sides to prevent wrinkling

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 8 /12 Up Beam end detail beam side view Spiral style backing springs reside inside “Sheath” (sheath not shown) Round to Square Transition Thin sheet metal RF “Curtain”

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 9 /12 Short RF Test Jaw with End Socket mounted End Socket Bearing Race SiN4 balls

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 10 /12 Section showing RF Spring location Slot for Spiral RF Spring SiN4 ball bearings support End Socket Mandrel & Shaft not shown

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 11 /12 End Socket RF Spring groove detail 82 degrees Groove width ~ 1mm 0.12 mm from edge

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 12 /12 Up Beam end detail from back side