1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
March 24-28, 2003Computing for High-Energy Physics Configuration Database for BaBar On-line Rainer Bartoldus, Gregory Dubois-Felsmann, Yury Kolomensky,
1 Alan Barr, UCL Fixed Frequency Trigger Veto The problem: –Currents in wire bonds in presence of strong magnetic fields –DC current not a problem (small.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
SctRodDaq CGL. The ASICs are called “ABCD”s Where the tests come in.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
SCT Analyses on Cosmics. Efficiency 2 methods –Online- quick/biased -> located in SCT_Monitoring –Offline- slow/unbiased In agreement with each other.
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
BOE/BME – MDT: DCS For the 2 BOE, DCS needs to handle 2 x 2 HV (1 ch/multilayer) 2x LV 2x JTAG, associated 2 MDMs/ELMBs Monitoring of T, B and CSM sensors.
Peter W. PhillipsSCT/Pixel RODDAQ workshop, UCL, July 2002 SCT Needs for Full User Evaluation Peter W Phillips Rutherford Appleton Laboratory.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.
Cosmic tests and Performance of the ATLAS Semi-Conductor Tracker Barrels Bilge Demirköz Oxford University On behalf of the ATLAS SCT Collaboration.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
Muon commissioning status and plans G.P. C. De Plano.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
HCAL DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova for the HCAL DPG October 20, 2011.
News on GEM Readout with the SRS, DATE & AMORE
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
SCT Readiness for Heavy Ion Collisions Dave Robinson on behalf of SCT 15/9/101Dave Robinson Heavy Ion Review.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
Tony WeidbergOpto WG April '081 SCT Links Long Term Monitoring Summary quality installed links Techniques for monitoring long term performance –Data links.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
Florida Institute of Technology, Melbourne, FL
SCT Bytestream Hacking Bruce Gallop RAL High mu upgrade - 16 th May 2012.
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Peter W. PhillipsATLAS SCT Week, CERN, September/October 2002 Electrical Tests of SCT modules using RODs Peter W Phillips Rutherford Appleton Laboratory.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
CERN, CT Workshop, ID Week, July 2 nd, 2007 Connectivity Workshop Conclusions: Lessons learned C12 Test Next future Claudia Gemme, CERN - INFN Genova Connectivity.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
L1Calo EM Efficiencies Hardeep Bansil University of Birmingham L1Calo Joint Meeting, Stockholm 29/06/2011.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Operation & Performance of the ATLAS SemiConductor Tracker Dr. Petra Haefner Max-Planck-Institut für Physik.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
62cm 64cm. DAQ status and Plans DAQ –Timing tuning –Which tools to learn (SC, Event monitor, GPIO, MIDAS, DIP, laser, storage, analysis) Plan with beam.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
SCT Links Operation Performance from QA and operation
DAQ for ATLAS SCT macro-assembly
Experience with DAQ for ATLAS SCT
Level 1 (Calo) Databases
Large CMS GEM with APV & SRS electronics
Example of DAQ Trigger issues for the SoLID experiment
CMS Pixel Data Quality Monitoring
Trigger issues for the CALICE beam test
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Presentation transcript:

1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future

2 4 July 2006 Alan Barr - SCT DAQ Scope ~10% SCT 468 modules available for read out –Top and bottom sectors + equivalent sectors of TRT Full DAQ chain –LTP, s-link etc –No CTP Calibration and ”Physics” (cosmics) running 13 online DAQ computers –Trigger control –ROD control –User Interface –Analysis –ROSes –Event Builder

3 4 July 2006 Alan Barr - SCT DAQ Calibration SR1 TIM ROD Analysis PC, GUI etc SBC Triggers Single DAQ crate Triggers from RODs or TIM Gain, Noise, Trim etc tests Noise occupancy and synchronous noise tests Events Histograms

4 4 July 2006 Alan Barr - SCT DAQ Setting things up : mapping checks Power Supply Channel DAQ TX Channel DAQ RX Channel Physical module Hard reset scan Probe scan Trim check Location Production database Offline position Alignment

5 4 July 2006 Alan Barr - SCT DAQ Running calibrations Ran top sector, then bottom sector, then top + bottom sector together Usual variety of tests: –3 Point Gain –Response Curve –Noise occupancy (Async + Synch) –Self-pickup noise occupancy (double trigger) –Opto scans

6 4 July 2006 Alan Barr - SCT DAQ Experience running calibrations Good if all is set up correctly –Not tolerant to single point failures –Absolutely need to have well behaved system (opto, modules etc) Now much easier to get to this point –DSP code identifies trouble makers Many fixes still require guidance by an expert hand

7 4 July 2006 Alan Barr - SCT DAQ Physics running TIM ROD SCT LTP Event Builder Event display Monitoring SCT ROS TRT LTP Scintillators Events Triggers TRT ROS TRT DAQ HW

8 4 July 2006 Alan Barr - SCT DAQ Timing-in Look at individual modules –Calculate concidences between top and bottom in DSP code –Scan the delay (BOC delay) –Good to ~few ns for overall timing –Confirmed by offline monitoring Module  module timing done by dead reckoning in advance (fibre lengths)

9 4 July 2006 Alan Barr - SCT DAQ Coincidences vs time: Non-coincident hits Coincident hits Correct delay Chose correct delay  Saw tracks!

10 4 July 2006 Alan Barr - SCT DAQ After concidence scan with top sector only

11 4 July 2006 Alan Barr - SCT DAQ Configuration Started running with thresholds as set from production database –Not good – wide variety of thresholds Once problem identified, two different “good” thresholds used –“Trim target” i.e. uncorrected 1 fC –“Response curve 1 fC” Includes ~10% wafer-by-wafer correction for variations in ABCD calibration capacitor

12 4 July 2006 Alan Barr - SCT DAQ Stability Good cosmic/ noise runs Long noise run Problem runs

13 4 July 2006 Alan Barr - SCT DAQ Good physics mode data Cosmics: –280k cosmics at trim target –170k cosmics at 1 fC corrected Noise Runs: –900k events at 0.9 fC RC – look for correlated noise –490k events [ fC RC] threshold scan –220k events in trigger rate noise scan –14k events with different grounding schemes –90k events looking for pickup from TRT –TRT heater pickup tests (on/off) – 66k For more details

14 4 July 2006 Alan Barr - SCT DAQ Headaches Opto TX and RX tunings still causing problems/errors –Query over mark/space ratio –Worries over VCSELs –Optical cause of tbin “000” hits seen by offline in 6 modules? ROS machine problems –Required reboot, remount, … –Possibly linked to invalid data coming from ROD –Some ideas as to what might be the cause… Initialisation problems in SctRodDaq start-up –Particularly after crate reboot –Being fixed as they are found/understood Further automation of module turn-on procedure required Low level of module HV and LV trips to be investigated Event filter requires configuration before start of run. EF crashed so was removed Upload of configurations needs streamlining

15 4 July 2006 Alan Barr - SCT DAQ Issues for the pit Configuration (inc. DCS) still a big area First large-scale multi-crate test Parallelism needed for analysis Much harder to reset off-detector hardware! Auto recovery required for –Modules (bring back into synch) –OPTO tuning –DAQ systems as a whole Set up of trigger chain (resets etc) through LTPs ROD monitoring not physics-ready yet Full list of active work topics in yesterday’s DAQ working meeting

16 4 July 2006 Alan Barr - SCT DAQ DAQ Contacts Grumble to the experts! –Wiki page: bin/wiki.cgi/UserStorieshttp:// bin/wiki.cgi/UserStories – address:

17 4 July 2006 Alan Barr - SCT DAQ