End-of-year talk LIU-SPS BD WG meeting 12.12.13. Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)

Slides:



Advertisements
Similar presentations
Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Advertisements

Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
SPS scrubbing run in 2014 H. Bartosik, G. Iadarola, G. Rumolo LHC Performance Workshop (Chamonix 2014), 22/9/2014 Many thanks to: G. Arduini, T. Argyropoulos,
H. Damerau, S. Hancock, LHC Beam Studies Review 28/08/2012 PS: the Longitudinal Plane 1 H. Damerau, S. Hancock LIU Beam Studies Review Meeting 28 August.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Impedance aspects of Crab cavities R. Calaga, N. Mounet, B. Salvant, E. Shaposhnikova Many thanks to F. Galleazzi, E. Metral, A. Mc Pherson, C. Zannini.
Injector MD planning and requests for 2014 Giovanni Rumolo and Hannes Bartosik Thanks to all MD users, machine supervisors, operators, experts … MSWG meeting,
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
SPS Scrubbing Runs 2014 week 45 and week 50 (part I) H. Bartosik, G. Iadarola, K. Li, L. Mether, G. Rumolo, M. Schenk Thanks to: SPS OP crew, G. Arduini,
Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro,
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Lessons from SPS studies in 2010 E. Shaposhnikova Chamonix’11 session 09: LHC injectors upgrade.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
LIU-SPS upgrade, schedule, target parameters and observed limits 1 B. Goddard, E. Shaposhnikova for LIU-SPS coordination team SPS scrubbing review
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
RF/BR section 2014 highlights. RF/BR section in 2014 ARGYROPOULOS Theodoros BOHL Thomas BORGMANN Silke CALAGA Buchi Rama Rao CASPERS Friedhelm CHAPOCHNIKOVA.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
Momentum slip-stacking of the nominal I-LHC beam in the SPS Particle simulations (preliminary) T. Argyropoulos, E. Shaposhnikova LIU-SPS BD WG 30/01/2014.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Introduction R. Garoby LIU 2014April 11,  LIU summary  LIU Highlights in 2013  Outcome of the «Review of LHC and Injectors Upgrade Plans» (Oct.2013)
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
Synchrotron frequency shift as a probe of the CERN SPS reactive impedance s HB2014 – 11/13/14 A. Lasheen, T. Argyropoulos, J. Esteban Müller, D. Quartullo,
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
LIU-PS Beam Dynamics Working Group Introduction and objectives
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Loss of Landau damping for reactive impedance and a double RF system
Harmonic system for LHC
Harmonic system for LHC
Longitudinal impedance of the SPS
Space charge studies at the SPS
Longitudinal beam parameters and stability
Proposals for 2015 impedance-related MD requests for PSB and SPS
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Benchmarking the SPS transverse impedance model: headtail growth rates
Acknowledgments: LIU-PT members and deputies, H. Bartosik
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Measurements of the Synchronous Phase Shift Aaron Farricker Participants: A.Lasheen, J. Repond & M.Schwarz Acknowledgements: H. Bartosik, T. Bohl,
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
Simulating transition crossing in the PS with HeadTail
Collective effects in the SPS and LHC (longitudinal plane)
Presentation transcript:

End-of-year talk LIU-SPS BD WG meeting

Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-) O Main topics: O SPS impedance – 17 talks… O Instabilities – 7 talks O Main speakers: O 5 talks: J. Varela, E. S. O 4 talks: T. Argyropoulos, B. Salvant, H. Timko O 3 talks – H. Bartosik, F. Caspers O Main writer: H. Bartosik - thanks a lot for Minutes!

Main efforts O SPS MDs: two months in 2013 and analysis of 2012 data O LIU days O SPS beam parameters – for RLIUP O LIU-SPS reviews (10!) => talks O SPS impedance model O Particle simulations

Priorities for MDs in 2013 ( from meeting on ) O Reference impedance measurements (synchrotron frequency shift) in Q26 with single bunches of: O variable, in range (1-15)x10 10, intensity O constant small (0.25 eVs) longitudinal emittance O Impedance identification: long bunches with RF off in Q20 (very high intensity ~ 8x3x10 10 ) O Single bunch stability in Q26 and Q20 (effect of bunch distribution due to the PS bunch rotation) O Single bunch stability in double RF system (Q26&Q20 => All measurements were done and analysed. Now they should be compared with simulations

B. Goddard LIU-SPS 800 MHz RF 12 December 2013

Plans for 2014 O Beam re-commissioning after LS1 O E-cloud: SPS scrubbing (do we need Ac-coating?) O Preparation of the LHC beam: 50 ns & 25 ns (BCMS) O Pushing intensity of 25 ns beam to the maximum O Preparation of doublets for scrubbing of LHC - new (longer) magnetic cycle - LLRF, transverse damper O SPS MDs O Effort for SPS impedance identification O Space charge studies O LIU day on 11 April 2014

MDs? Injector schedule for 2014

Merry Christmas! Happy New Year!