TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT JRC PPE SSW-rx VME protocol Chikara Fukunaga TGC.

Slides:



Advertisements
Similar presentations
IO Interfaces and Bus Standards. Interface circuits Consists of the cktry required to connect an i/o device to a computer. On one side we have data bus.
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
Token Bit Manager for the CMS Pixel Readout
ESODAC Study for a new ESO Detector Array Controller.
M.J. LeVine1STAR HFT meeting, Sept 27-28, 2011 STAR SSD readout upgrade M. LeVine, R. Scheetz -- BNL Ch. Renard, S. Bouvier -- Subatech J. Thomas -- LBNL.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Beam Test of TGC electronics in 2003 Introduction Electronics Setup Stand-alone Run Setup Data.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
SVT TDR meeting – March 30, 2012 List of peripheral blocks for SVT strip readout chips.
PRR on Patch-Panel ASIC 9 Dec. 2002KEK SOS Overview LVDS Rx Variable Delay BCID Test Pulse Generator Control Radiation tests Mass-production and inspection.
Computerized Train Control System by: Shawn Lord Christian Thompson.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
Phase-1 Padring. i PHC Phase 1 Padring 2 03/04/2008 Padring Overview µm Several Blocs :  JTAG pads  Digital Control.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Firmware - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane, Martin Postranecky TIM Firmware.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
J. Christiansen, CERN - EP/MIC
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
TGC Electronics Status Osamu Sasaki 23 Dec 河口湖 SLB ASIC PS-Board H-pT Board Star Switch Sector Logic Other boards Procurement 2004 極み.
11 October 2002Matthew Warren - Trigger Board CDR1 Trigger Board CDR Matthew Warren University College London 11 October 2002.
14/6/2000 End Cap Muon Trigger Review at CERN 1 TGC LVL1 Trigger System Link C.Fukunaga/Tokyo Metropolitan University TGC electronics group System link.
Development of an ASIC for reading out CCDS at the vertex detector of the International Linear Collider Presenter: Peter Murray ASIC Design Group Science.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Hi-pT Board Hi-pT ASIC Board Type Endcap-wire Endcap-Strip Forward Chikara Fukunaga (TMU)
FDR of the End-cap Muon Trigger Electronics 1/Mar./04
PSI - 11 Feb The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
ATLAS Muon Week in Seattle 30/June/04 1 Test Beam of TGC electronics in 2004 Introduction Member List Electronics Setup TGC Setup Overlap problem in 2003.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
ClicPix ideas and a first specification draft P. Valerio.
14/Sept./2004 LECC2004 Irradiation test of ASIC and FPGA for ATLAS TGC Level-1Trigger System 1 TID (  -ray) and SEE (proton) tests and results for ROHM.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
2001/02/16TGC off-detector PDR1 Sector Logic Status Report Design Prototype-(-1) Prototype-0 Schedule.
09/02/20121 Delay Chip Prototype & SPI interface Joan Mauricio La Salle (URL) 15/02/2013.
CCU25 Communication and Control Unit ASIC in CMOS 0.25 μm Ch.Paillard
PSI - 11 Feb Status of the electronic systems of the MEG Experiment.
The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
H-pT ASIC A.The logic of H-pT ASIC 1. overview 2. matrix, encoder, selector… B. Test result 1. verification 2. electrical characteristics C. Usage.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
Sector logic firmware and G-link Merger board designs
Iwaki System Readout Board User’s Guide
PRR of the TGC SLB and SSW (Reported by CF)
Meeting at CERN March 2011.
Electronics for Physicists
Status of Slave Board (SLB) ASIC
Presentation transcript:

TGC electronics meeting at CERN June/ Status of ASIC development for TGC electronics PP SLB Hi-pT JRC PPE SSW-rx VME protocol Chikara Fukunaga TGC electronics meeting on 21-June-2002 at CERN

TGC electronics meeting at CERN June/ PP (Patch Panel) ASIC  16 chan. 0.35um VDEC 8/2001→3/2002  32 chan. 0.35um VLDAC (Rohm) 11/2001→4/2002  32 chan. version has been tested and found no analog circuits (lvds, PLL, Test pulse) worked. Upset & Struggle, and we found ….  Miss-connection of I/O pads.  The Analog I/Os have been connected to the digital I/O pads accidentally.  Each digital I/O pad has a digital CMOS buffer. Analog signals are blocked with the threshold of this buffer.  We have corrected already the pad miss-connection, re-submitted on 10- June, and expect to have new one in September (both 16- and 32- chan.)  We have used passport library for analog pads. DLL →PLL

TGC electronics meeting at CERN June/ SLB (Slave Board) ASIC  Version 1 (the first one after the premières ones used for the 2001 Slice test (= version 0)) has been submitted and tested preliminary.  0.35um 10x10mm 2 VLDAC (Rohm) 2/2002→Mid.6/2002  New features  Standard JTAG, JTAG racing problem fixed (cDR < TCK problem)  New connection ordering with Hi-pT ASIC (Adapted to HpT ordering)  Clock distribution optimized (partially manual place and routing)  Clock bi-phase (master & slave) logic applied to PSC and JTAG  32bit ID code  Test results (since only 1 week from delivery)  We have quickly checked the parts in which we had problems in 0-th version.  It would seem that almost all problems (in JTAG and readout) are solved with the above prescriptions.

TGC electronics meeting at CERN June/ Hi-pT ASIC  Version 2 (to be final and fixed for the production )  0.35 um Hitachi Gate Array 12/2001→2/2002  New features (Already reported in the last meeting in 2/2002)  3-bit voting registers for delay control installed (JTAG accessible)  32-bit ID code  Add New ID for No hit  Test results  A few thousands of I/O patterns (generated by the simulation) are checked for both wire and strip, and no problem found  Minor problem → Existence of  value with >3 bits Lowest 5 bits of output data consist of 1 bit for sign ±,1 bit not used, and 3 bits for  Non-used bit is not sent and simply suppressed to reduce the number of fibers.  =-9 is expressed with the 5 bits as 01001, but data are sent as 0_001 (MSB 0 means negative, and _ means no connection) Consequently at the receiver side,  =-9 and  =-1 are not distinguishable.  We plan to install an exterior circuit to deal  3 bits as “No hit”.  We’d like to open PRR for Hi-pT in September 2002, either before or after LECC 2002 at Colmar.

TGC electronics meeting at CERN June/ JRC (JTAG Route Controller) on PS-board  To ASIC from CPLD version used in Slice test 2001  2/2001→1/2002, and JTAG minor problem fixed, 2/2002→5/2002  Now checking PPE (Primary Protocol Encoder for addressed JTAG access) on HSC  Transferred from CPLD to ASIC for radiation tolerance  Now checking SSW-rx (Star Switch Receiver)  Transferred from CPLD to ASIC for radiation tolerance  2/2002→5/2002  We will re-design the ASIC in the next fabrication VME protocol  Transferred from CPLD to ASIC for radiation tolerance  A24D16, VME slave access, no interrupt, no block mode transfer support  Used for both SSW and HpT VME modules  Under designing

TGC electronics meeting at CERN June/2002 6

7

8

9