All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.

Slides:



Advertisements
Similar presentations
Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
Advertisements

July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Argonne Laser Test Stand and Fermilab Test Beam Facility Karen Byrum 8 March, 2007 Status of Argonne Laser Teststand (Joint ANL – UC program) Some first.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
MCTF C. Johnstone All Exp. Meeting 14 Mar First Beam to Muon Test Area Description and commissioning of beam to MTA Experimental Hall C. Johnstone,
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
F Project X Overview Dave McGinnis October 12, 2007.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Maintenance and Accelerator Support RHIC Start Up 12.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Maintenance and Accelerator Support RHIC Start Up 12.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Status Report Linac Startup plans 12/05/2012.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
Accelerator Status and Plans
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
March 4, 2013 Photo by Martin Murphy. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning.
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Recycler Pbar Transfer -Gattuso 1 Recycler weekly Summary This presentation will probably involve audience discussion, which will create action items.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
MI/RR Status January 3, 2014 D. Capista. MI Preformance.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Preinjectors Status D. Raparia March 22, 2016 Time Meeting.
Alexander Herlert, CERN (PH-SME-IS)
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Presentation transcript:

All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy

Accelerator Operation Summary Calendar Week # 47 NuMI Weekly Integrated Intensity 6.38 E18 protons BNB Weekly Integrated Intensity 5.08 E18 protons NMuon Weekly Integrated Intensity 1.91 E15 protons MTest Weekly Integrated Intensity 6.28 E13 protons Beam Hours To NuMI hours Beam Hours To BNB hours Beam Hours To NMuon hours Beam Hours To MTest hours From : November 18, 2013 (0000 hours) To: November 25, 2013 (0000 hours)

Status /Work Completed/Plans Proton Source – Tuning and Maintenance – Booster access to repair RF – Linac quad failure Main Injector – Tuning and Maintenance – Recycler access revealed leaking MI quad – Q229 Recycler – Commissioning – Access to look at extraction line vacuum valve BNB – Tuning – MI-13 temperature probe installation to monitor 50 meter absorber area NuMI – Tuning – Requesting 2 days of 2e12 this week

Status /Work Completed/Plans Switchyard – Tuned extraction and beamline – Looking into spill and controls MTest – Tuning – Experiment T-1041 online – MS2 cooling tower maintenance NMuon – Tuning – NM1/2 access during RR access – NM1 Box SWIC Working, shows profiles

Photo by Martin Murphy

Schedules and Links: Schedule can be accessed from the Operations Home Page – - Schedules -> Operations ScheduleOperations Schedule Direct link to schedule – -