Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.

Slides:



Advertisements
Similar presentations
LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
Advertisements

Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
17 july 2008 Inner Triplets upgrade – 2013 Very first Schedule.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
EN-CV interventions during YETS
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
LHC-YETS Coordination meeting #9 24 th November, 2015.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Overview of the LHC Year End Technical Stop
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
K. Foraz on behalf of OSS members
ABT-EC EYETS Activities 2nd reports
TE-MSC activities in SPS during LS2
SMACC Tenth report [15 min] 13/09/2013
EYETS David Hay EN-OSS.
Status of LHC installation & New Installation Schedule
K. Foraz on behalf of OSS members
Update of cryogenic activities
Helium spill in LHC tunnel
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Status of the cryogenic system for B180
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
LHC installation status
Experimental Areas – LS2 planning
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1

AD & LEIR 20/09/2013 LSC - EN-MEF-OSS 2 AD – Girder line 7000, procurement of material in progress, but some delay due to change of material (361 LN instead of 316L for a few chambers). – BHN06: official decision circulated – UHM3107 and UVM3207 tanks : Pumping and leak test in progress – KFI tanks reinstallation expected mid Oct.- final leak tests in progress – Installation of a railing for OD in progress LEIR – Successful brief opening vacuum sector 5 (removal IMP’s) last week. Sectors 1, 2 and 5 in preparation in view of coming bake-out campaign (1/10 until 15/11). – Cleaning campaign - 2 nd phase form next week – Access system - general tests OK Some mechanical issues to fix and then the access point will be officially be put into service (soon).

PS In Progress – CV Consolidation program: Cabling work is in progress Ventilation ducts installation – Septum 16 External Shielding program: Pilling work is completed – Cabling campaign Septa and vacuum teams are starting to connect and to test new cables – General equipment maintenance: Instrumentation, vacuum,, Beam Stoppers, (EN/STI) consolidation/maintenance program – PS PSS Safety and Access System installed – Successful test of assembly blocks for the dummy septum (ECR ) – LEIR injection beam line MTV intervention 20/09/2013 LSC - EN-MEF-OSS3

SPS BA1: – Installation of new fibre optic systems in progress (foreseen to finish ahead of schedule) – Replacement of safety valves in progress (almost complete) – A few cables still remain to be identified (ongoing) – [Irradiated cabling campaign – beginning of October] TT10: – Installation of the new support beams is postponed to next week (Has now started. See photo) – BA3 and outside the CCC: These 2 areas are currently being cleared and tidied in preparation for the CERN open days at the end of this month. (ongoing) Other works: – EN/CV have begun to refill the main SPS ring-main (Complete) – TE/VSC have started this week to pump down and leak detect all the long sectors of SPS ( started in BA3) – All other works are proceeding on schedule 20/09/2013LSC - EN-MEF-OSS4

LHC - P1 R2E – Pt1: – Left: Cabling progressing well – Right: Piping finished Cabling in progress LSS1: – Survey HLS maintenance in progress – DFBX: consolidation of current leads in progress – Upgrade and maintenance of collimator control systems in progress – TCLP installed – Roman Pots removed – BPMCW being installed 20/09/2013LSC - EN-MEF-OSS5

LHC – P1  P2 Arc 12 : – UPS replacement in RE 18 and 22 – QRL pumped – Cryo-magnets reconnection being finalized – Electrical tests next week; – SMACC: W bellows opened M openings finished (4 wks ahead of schedule) Point 2 – SU maintenance in progress (no cooled air) – Cryogenic maintenance in progress LSS2 – Preparation for open days – RB24 opening in progress – Maintenance of motorized jacks on ITs finished 20/09/2013LSC - EN-MEF-OSS6

LHC - P2  P3 Arc 23 – QRL pumping in progress – Magnet reconnection in progress High voltage electrical tests phase1 performed! – DN200 installed – UPS replacement going on – W bellows openings finished – M opening just started LSS3 – Installation of the cable trays finished – cabling campaign started – BLM re-installed in completed vacuum sub-sectors 20/09/2013LSC - EN-MEF-OSS7

LHC - P3  P4 Arc 34 – Magnets reconnection in progress “Plaque de renfort” in place End in November – QRL pumping completed – IC consolidation: W bellows openings started – CRG services modules consolidation finished – New non conformity on nested bellow B13L3 --> to follow 20/09/2013LSC - EN-MEF-OSS8

LHC – P4  P5 LSS4 & P4 – Water cooled cables consolidation in progress Ducts are exchanged Work on power converter in progress Rescheduling – Short circuit tests from Oct. 21 st to Nov. 8 th –  UW maintenance postponed to March 2014 – RF maintenance and upgrade Flow meters being re-installed – New cooling tower installation in progress – 13kA & 600 A shall be finished – Thermoswitch installation just started – LSS4L: Works have to stop on Wed 25th for Open days preparation Arc 45 – QRL pumping in progress (50% of overall QRL pumped) – Magnet reconnection in progress (end Nov.) – DN200 started – DFBAI.5L – damaged bellow – Opening starts next week – [QRL compensator replacement in December] 20/09/2013LSC - EN-MEF-OSS9 WCC leak test

LHC – P5 LSS5: – Modification of the cabling for TOTEM ongoing – 600A upgrade in progress – Survey finished in 5L, in progress in 5R R2E – P5 – Safe room ventilation: studies being finalized; extension and new hole will be done in coming weeks; – Pipe being installed (ahead of schedule) – UPS replacement finalized – Cable trays installation in progress 20/09/2013LSC - EN-MEF-OSS10 Cable tray installation in UJ56

LHC – P5  P6 Arc 56 – New faulty PIM replaced-leak tested beginning Oct. – QRL compensator replacement started – SMACC 11/14 vacuum subsectors consolidation completed; Non conformities being solved W closure stopped (priority to sector 67) – DFBA consolidation in progress 5R ends week 39 DFBAK.6L – damaged bellow – repair to be scheduled 20/09/2013LSC - EN-MEF-OSS11

LHC – P6 LSS6 & P6 – MKD-MKB tests on beam1 finished – MKD-MKB upgrade on beam2 in progress – Cabling campaign ongoing – Water cooled cable campaign in progress – priority on DFBAK.6L – 3 TCDQ – Lift PM65: Heavy maintenance performed. – LSS6: Works have to stop on Wed 25th for Open days preparation 20/09/2013LSC - EN-MEF-OSS12 No access by PM65 Access by PZ65

LHC – P6  P7 Arc 67 – SMACC in progress: Splices completed Shunt being finalized Diodes consolidation in progress W Closure activities in progress DFBA consolidation – 6R ends next week – 7L ends wk. 40 R2E – P7: – ODH and firedetection systems installed– tests done and ok – Fireproof racks tranported in TZ76 (storage) – Supports for fireproof racks installed 20/09/2013LSC - EN-MEF-OSS13 Fireproof racks and supports in TZ76 Insulation boxes; resin injection

LHC - P7  P8 Arc 78 – Magnet reconnection finished (except Q5L8) – Splice consolidation in progress Splices in progress (almost finished) Shunt installation in progress (~50% ) Diodes started DFBA consolidation shall end wks 43 – QRL X-rays in progress: only 1/301 inspected compensators found deformed on overall QRL LSS8 &P8 – Survey maintenance from next week – 1 st MKI re-installed R2E - P8 – Ventilation control scheduled in October – Cryo and cabling in progress 20/09/2013LSC - EN-MEF-OSS14

LHC – arc 81 Arc 81 - SMACC -DFBA consolidation (ends end Nov.) -Splices activities started (desolder) -QRL compensator being replaced -Vacuum consolidation from next week 20/09/2013LSC - EN-MEF-OSS15

Overall progress Injectors: – PSB: issue on dump line- to follow LHC – R2E – Ahead of schedule at P1- P5&P7&P8:On schedule – SMACC ~ 3 weeks of delay – QRL: no new deformed compensator; 50% pumped – Additional works QRL compensator exchange – scheduled – in progress DFBA bellow repair – to be scheduled – technical solution to be defined Open days – LHC6 and LHC4, work have to stop in LSS from Wed. night 20/09/2013LSC - EN-MEF-OSS16

LHC Overall Schedule – broken line 20/09/2013LSC - EN-MEF-OSS17