CCP Track Safety Update Geneva 2016. * STRC amendments *Developments with APDs *Track Inspections.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
Compliance Dates The final rule was published on January 25, 1995,
1 IMPROVING TRANSPORTATION SERVICES IN EARLY EDUCATION AND CARE SETTINGS EEC Board Meeting – November 8, 2011.
TITLE 1 – MINIMUM REQUIREMENTS TO WORK ON A SHIP
East Carolina University Compressed Gas Safety Training Program
Compressed Gas Cylinder Safety
C&L Sales & Services P/L
Geothermal Alliance of Illinois Getting it Right the First Time.
Caravan Park Fire Safety Update David Kearsley Fire Safety Program Leader CFA Headquarters.
2 Fire Fighter Qualifications and Safety Skill Drills.
Intermediate SFFMA Objectives: – Hrs received.
Laboratory Fume Hoods In accordance with Title 8 CCR Section , Ventilation Requirements for Laboratory-Type Hood Operations. California State University.
Private Stairway A private stairway is a series of steps with straight nosings on plan intended for use solely in connection with one dwelling. Tread Newel.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Fall Protection and Ladder Safety Training. Course Outline  Introduction  Fall Protection  Ladder Safety  Wrap-up.
Safety for Working in High Places
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Rev: Section 1 Overview of Fall Protection.
World Archery Judges’ Training Aid – May VENUE & FIELD LAYOUT.
1 Before and After The Appearance Program; enhances your company image contributes to your fleet vehicle safety communicates a professional advantage.
1 - Issuing regulations Governmental, Legal and Regulatory Framework for Safety (GSR – Part 1) Requirement 1: National policy and strategy for safety The.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Fall Hazards.
AJ Gajdosik, CSP, ARM-P St. Louis ASSE Chapter Meeting July 2015.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
FITA Judge Seminar – Bangkok 2010 VENUE & FIELD LAYOUT.
© 2009 Michigan State University licensed under CC-BY-SA, original at Water Quality.
Section 54’s 54.Inspector’s power to deal with dangerous conditions – (1) if an inspector has reason to believe that any occurrence, practice or condition.
SAFETY MANAGEMENT SYSTEM Non Conformance Reporting
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
1 Falls Module 2. 2Objectives After this module you should be able to – identify the most common fall hazards – take the steps necessary to avoid those.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
1 Control Room Habitability Program James A. Carlson, Omaha Public Power District, Author Deep Ghosh, Southern Nuclear Operating Greg Holbrooks, PE, Duke.
REGATTA N OTICE O F R ACE : Rum Runner Catamaran Regatta 1. RULES 1.1 The regatta will be governed by the rules as defined in The Racing Rules of Sailing.
Electrical Safety Authority
INSTALLING HARDRIVES AND FLASH DRIVES Objective: install a flash drive and test the installation. How is a Flash drive different to a Hard Drive? Hard.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
MOUSETRAP VEHICLE OUT AND BACK Mike Johnson. LAY PERSON’S EVENT DESCRIPTION: Teams will construct a mousetrap-powered vehicle that: moves as fast as humanly.
HOMOLOGATIONS Alpine Technical Delegates – Update
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
Elgas and Master Plumbers Trade Information Night 20 th August 2014 MPA NSW College of Excellence 2 Percy Street Auburn Presented by Charlie Gauchie Manager.
Installation Walkthrough Image Guide
Food Suppliers Implementation of EDI &PAV March 2010
Regional Manager, The Jockeys’ Guild
Cross Connection Survey Training
Nunavut Water Board Public Hearing
Strategy for conformity of non-standard cryogenic equipment
Rockingham County Public Schools Teacher Evaluation Process
Quality Workshop The Local Council Award Scheme is a great guide for good practice in our sector and a way for councils to build confidence in their.
Fall Hazards.
Decree of the Ministry of Interior 3rd August 2015 The “so called” Italian Fire Prevention Code - IFC: S6 – Fire Control and Suppression provisions.
Project Development and Managing your Build Agenda
Subpart M Fall Protection.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Manufactured Buildings
East Carolina University Compressed Gas Safety Training Program
The FIM AFRICA Environmental Steward
Fall Hazards.
PARALLEL SL EVENTS: Non-Scored & Scored
PARALLEL SL EVENTS: Non-Scored & Scored
Temporary Event Notices
CHILD SAFETY INFORMATION FOR WINDOW BLINDS
Fall Hazards.
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

CCP Track Safety Update Geneva 2016

* STRC amendments *Developments with APDs *Track Inspections

Amendments to the STRC With effect from FIM will no longer accept and certify any new venue where the primary safety fence is of a solid construction, being wooden planks, wooden board or any solid material that is not in any way flexible and as such does not allow for the absorbing of kinetic energy when struck by a competitor or racing machinery.

In respect of current licensed venues with a solid non- flexible safety fence, additional protection will be required which may take the form of either of the following options:

Option 1 Additional protection is to be fitted to unprotected solid safety fences and kickboards on the exit of bends 2 and 4 from the end of a certified APD for a distance of 20 metres along the straights. This further protection will be in the form of foam padding or similar as certified and approved by FIM.

It is recommended that the additional protection be fitted as soon as possible following confirmation from FIM of the date of availability of the product. The requirement will be compulsory with effect from 12 Months following the confirmed date of availability.

Option 2 If the safety fence and kickboard is not of a flexible design the safety fence must be replaced by a flexible alternative as agreed and accepted by the FIM on the exit of bends 2 and 4 from the end of a certified APD for a distance of 20 metres along the straights. In respect of option 2 if this option is chosen work must be completed by 1st January 2017.

One possible solution from Germany (Abensberg)

Outer starting gate stanchion The outer stanchion should be positioned a minimum of 60 cm away from the outer edge of the safety fence.

In order to ensure compliance, all tracks hosting FIM events in 2016 are required to to the FIM a photograph of the outer starting gate stanchion demonstrating compliance with the above regulation. This should be sent at least one month before the date of the 2016 event.

APDs

A minimum of 4 spare APD panels in good condition (from the same brand) shall be available at the start of an event and shall be immediately available and ready for use

When fitting APDs to the safety fence, a maximum of 10cm gap between the APD and the fence is permitted. This is necessary to allow for the natural curvature of the safety fence.

If during a track inspection by the appointed FIM Track Inspector or by an appointed Jury President it is found that an APD is not in compliance with the STRC then the FIM Track Licence for that track may be suspended until reparatory work has been carried out and re-inspected.

The Organiser and the Clerk of the Course are responsible for the fitting of the APD to the Safety Fence, as required by the manufacturers.

Individual labelling of units APD manufacturers will be required to ensure that from every new APD panel is labelled with its own individual serial number and the year of manufacture. This label should be hard wearing and easily accessible for inspection.

Notification to CCP of servicing/ replacement APD manufacturers will notify the FIM in writing or by whenever major repairs or servicing is carried out to any APD fence. The information shall include the name of the track, details of the work carried out, any replacement panels supplied and any recommendation for future work. The manufacturers should also send to FIM the numbers of APD installed on any tracks.

APDs -Future Developments ongoing discussions and planning

Measures to prevent lifting on impact – suggestions from manufacturers Bury the APD and kick board into the track by cm

fitting sand bags into the wedge to replace the air, each bag contains 25kg kg per 5m barrier.

Improved designs Type A “plus+” Barrier – 60km/h – For Long Track/Grass Track and Speedway

The FIM recommends: The connection between the modules should have a geometric form.

an additional protective cover track side

Manometer or pressure gauge fitted to each module in order to check the pressure of the module

Track Inspection Report – Jury Presidents New Track Inspection Report for 2016 More information required (sorry!) Separate additional section for Ice Racing More user-friendly section for APDs Professional and thorough Track Inspections are a reflection on CCP

Please have a good look For Example - Ensure that fixings and straps are in good condition

And that the APD is properly fixed at the back

Finally Keep in touch Please send me all your track and JP reports Please send me any concerns that you may have of any bad practice Have a great season