Faculty of Physics, University of Belgrade General meeting, 19 th of May, 2015. Pixel/Connectors Checking Jovan Puzović, Faculty of Physics, Belgrade.

Slides:



Advertisements
Similar presentations
100[ch] 0.28[ps/ch] 200[ch] 0.54[ps/ch] TDC-calibration.
Advertisements

Status of the Clermont-Ferrand R&D works Tilecal upgrade meeting at CERN (11 February 2015) François Vazeille on behalf of Clermont-Fd team ● Active Dividers:
Inti Lehmann University of Glasgow 27 June 2011 Status of the TOFs.
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
1 Tracking Tests of DHC Tower Update - 10/01/2003 Kurt Francis - Northern Illinois University.
1 Subproject HADES 2 Forward Wall FP6 Meeting September 26, 2006.
HF Video MeetingDec 2002E. Hazen HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter As of 9am 05/28/2003.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
1 Initial Tests of DHC Tower Update - 09/03/2003 Kurt Francis, Donna Kubik - Northern Illinois University.
Faculty of Physics, University of Belgrade General meeting 3 rd of June, ToF-L/R Performance Marjan Ćirković, Faculty of Physics, Belgrade.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Setup of Gain Monitoring System with Mr. Uozumi Kobe Univ. Hiroko Ikeda 18,May 2007.
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
TAU status 14/2/2012. Temperature behavior in red Delayed response No A/C T=24-25 C 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C 16:30 18:00 04:00.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
STATUS 11/8/15 Itamar, Meny, Sacha, Yan. Envelope gluing : – All pieces has been produced – Yesterday, a robust pump has been installed – First gluing.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Detector Cabling and Patching Rainer Schwemmer
S-2S memo WC Toshiyuki Gogami 24Apr2015.
CAL DQM REPORT T. Schörner-Sadenius Hamburg University CAL/HES Meeting, 4 January 2005.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
To measure the beam intensity a sampling method was used where two cadmium apertures (P1 and P2) are placed to cut the beam down so the neutron counts/sec.
PMT Calibration Bryan Musolf. Goals Transform raw data into graphs for 30 PMTs Observe how the gain and # of photoelectrons (PE) change as a LED intensity.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Status of NA62 straw electronics Webs Covers Services Readout.
PHENIX DC meeting Oct / 10 / 2001 Status of T0 counter DC meeting, Oct / 10 / 2001 T. Chujo, A. Danmura, S. Esumi, A. Kiyomichi, Y. Kuroki, H. Masui, Y.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Status of the ETL 9125FLB Photomultiplier Tubes Steve Bache UNC-Wilmington.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
Preparation for TS3 Mariana Rihl. Known issues Implications on light leaks on all modules – Visible on current feedback of bias – Confirmed by study performed.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
Faculty of Physics, University of Belgrade General meeting, Wroclaw 28 th of January, ToF-L/R HV Upgrade, Status and Plans Jovan Puzović, Faculty.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
S-2S meeting Toshiyuki Gogami 15 Oct Contents TOF detector Kyoto University.
Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, 10 th of October, Remote control and monitoring of ToF-L/R detector Jovan.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
LKr status R. Fantechi.
The procedure for noise rate measurement of BBC’s PMTs
OH 2007/4/18 Alan Iguchi.
Presentation transcript:

Faculty of Physics, University of Belgrade General meeting, 19 th of May, Pixel/Connectors Checking Jovan Puzović, Faculty of Physics, Belgrade

Faculty of Physics, University of Belgrade General meeting, Page 2 out of 7 Jovan Puzović, Belgrade SHINE team Status - Start working on Sunday with some preparation works -Monday – Zoltan produce Mickey Mouse system to measure position in the cable where it is broken (by using delay between signal from signal generator and reflected signal) -All tested connections show delay of ~250/2 ns (~25m), the position of the break is in the TPC hut! -Monday afternoon we got access to experimental area!

Faculty of Physics, University of Belgrade General meeting, Page 3 out of 7 Jovan Puzović, Belgrade SHINE team Status -Fully checked 40 out of 96 bad pixels -20 has good connection – bad PMT/Scint. -7 not connected to the patch panel in TPC hut -8 connected, but PMT divider is broken -3 (+7?) bad connections between two patch panels -2 unclear at the moment -It seems that at least 35 out of 40 pixels has problem with PMT/Scintilators (or HV, or readout electronics)

Faculty of Physics, University of Belgrade General meeting, Page 4 out of 7 Jovan Puzović, Belgrade SHINE team Plan for Tomorrow -Check the rest of the pixels/connections -Open one of the cassette to inspect the situation with PMT, divider and scintilator