Baseline 12/09/10 TDC Day 5 Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.

Slides:



Advertisements
Similar presentations
SESSION 2.2 Programme of Assessment Grades
Advertisements

Changing Nutritional Needs During Pregnancy. Maternal Diet and Infant Health  Recommended weight gain  1# month 1 st Trimester  1# week 2 nd and.
October 20 and 21, 2014 Faculty Meeting. Dr. Brantley Briley President WELCOME.
NSP1 The Five C’s of Closing. 1 st C Calculate….. Calculate…..Calculate Calculate the NSP Sales Price Calculate the Subsidy/ DHCD Match Calculate the.
Training Purposes Only JEM EPO 17A JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Property-Carrying Vehicles
Office of Research and Information Technology Flexible Sleeper Berth Pilot Program October 27, 2014 Martin R. Walker, Chief Research Division.
Compliance # e-Worksite Solutions sm Strategic Alliance Program For DiversityBusiness.com Members Presented to you by: Eddie Graves The Diversity.
Federal Motor Carrier Safety Administration
Title IV Administration of Clock Ho Title IV Administration of Clock Hours Craig D, Rorie, Training Officer Federal Student Aid U.S. Department of Education.
Google: coachFields wiki wikispaces.net/
The Diabetic Retinopathy Clinical Research Network
Education Unit The Practicum Experience Session Two.
Clock Hour Disbursement MAFAA Fall Training Day Presented by Ginny Dodds October 28, 2014.
Sequences & Series. Sequence: A function whose domain is a set of consecutive integers. The domain gives the relative position of each term of the sequence:
WCHS/WACC Modified Block Schedule ‘15-’16 MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAY 1 st Period 7:40 – 8:27 (47 min) 1 st Period 7:40 – 8:27 (47 min) 1 st Period.
North Carolina Department of Public Instruction Analyzing Student Work to Change Teacher Practice.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama BRIC-17 TIR Overview Aug 28, 2012 Tony Cox EO20.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
Overview of the Inc Experiments supported by CADMOS Hélène RUGET - Maurice MARNAT.
A. Maillet, POIWG#25, Feb 3-5, Inc Experiments supported by CADMOS and using the EPM Alain MAILLET CADMOS
1 Increment 1 Lessons Learned Many things are not happening as predicted. Major differences are: –Scheduling and stowage –Turnaround times for troubleshooting.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Cell Bio Tech Demo TIR Overview Aug 28, 2012.
Payload Operations Integration Working Group (POIWG) February 3-5, 2009 Human Research Program (HRP) Marc Perry HRP Increment 19/20 Overview Increment.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
Baseline 06/10/10 TDC Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
CADMOS-POIWG#31 I Jan , 2012 I Huntsville POIWG #31 – Jan , 2012 Stéphanie HERR - Alain MAILLET Overview of the Experiments supported.
Urine Collection and Pill Ingestion E255/SMO 021 Bisphosphonates Johnson Space Center, Houston, Texas Curtis KershnerKaren Lawrence 1 Bisphosphonates:
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
Lisa Prendergast EO20/ Operations Lead January
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
ISS: Nom Ops P.I. P.A. Whitson, Ph.D. Johnson Space Center, Houston, Texas E057: Renal Stone Risk During Space Flight: Assessment and Countermeasure Validation.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
4th Grade FSA FAMILY NIGHT
Payload Operations and Integration Center MSFC Daily Summary for PDs.
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
CADMOS for ESA Inc 25&26 supported activities Maurice MARNAT CADMOS - CNES POIWG #28: July 27-29, 2010.
Overview of the Inc Experiments supported by CADMOS Alain MAILLET.
Special Payroll Calculations
POIWG #32 – Jul , 2012 François NUYTTENS – Cécile THEVENOT Overview of the Inc Experiments supported by CADMOS.
Damec Research Aps POIWG July 2008 CARD Long-term microgravity: A model for investigating mechanisms of heart disease and sympatho adrenal activity during.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
Focused, Connected, Ready September 2014
The Greater Miami Valley EMS Council
Payroll Processing pay period end for HR Professionals
Review Expectation of Student Leadership
May be used for: Sick Leave Personal illness.
Grade one First term Second term Learning unit Learning unit
Study design. Study design. Each subject with or without type 2 diabetes participated in euglycemic and hypoglycemic clamp visits separated by 4–8 weeks.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Welcome to “TRC-170” Training
Data Wise Decardra L. Jackson, Ed.D..
Secondary Ramadan Schedule
Review Expectation of Student Leadership
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
Bell Schedule Regular 1st Hour – 8:17 - 9:10 -- CBA
Ambient Monitoring Initial Report
Secondary 3(2019) Subject Combination
Presentation transcript:

Baseline 12/09/10 TDC Day 5 Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond to blood collection day: FD15 scheduled +/- 5 days All other FDs scheduled +/- 14 days except: - No less than 7 days between FD15 and FD30 - No less than 3 weeks between other FDs If mission not exactly 180 days, final session scheduled within 2 weeks of landing, but greater than 3 weeks from previous session Day 0 Urine Setup Urine pH Testing Diet Logging Urine pH Testing Diet Logging Urine pH Testing Diet Logging Urine pH Testing Diet Logging Urine Collection & MELFI Insertion (day 1) Closeout Urine pH Testing Closeout Urine Collection (day 2) Blood Collection & Processing Diet & pH Log Photograph Blood Setup Blood Ops Day 1Day 3Day 4 Nutrition - Repository - PRO K Diet & pH Log Photograph OCA Downlink Blood Stow Urine Stow Initial Urine Collection (day 1) Closeout Urine MELFI Insertion (day 2) Initial Urine MELFI Insertion (day 1) Urine Collection & MELFI Insertion (day 1) Urine Collection & MELIF Insertion (day 1) pH Kit Unstow Day 2

Baseline 12/09/10 TDC within 5 days Day 5 Closeout Day of Diet Day 3 3rd Day of Diet PRO K Crew Ground 5 Sessions/Subject: Scheduled for each FD session (FDs 15, 30, 60, 120, & 180): Scheduled over 5 consecutive days beginning 96 hrs prior to blood ops and 72 hrs prior to start of 24-hr urine ops (4-day diet period: days 1 - 4; diet closeout: day 5): - Urine pH testing scheduled daily preferably in post-sleep (or at same time of day) for 5 consecutive days during 4-day diet period and diet closeout day - Diet logging scheduled daily mid-day during 4-day diet period - Diet & pH test log photos scheduled at end of session on diet closeout day (after urine and blood ops) - OCA downlink scheduled ASAP after photos Minimum 1-week separation between SOLO and PRO K sessions PROK-URN PH-TEST_SUB PROK-DIET-LOG1_SUB 4-Day Controlled/Monitored Diet Urine pH Testing & Diet Logging :05 Day 1 1st Day of Diet Day 2 2nd Day of Diet Day 4 4th Day of Diet PROK-URN PH-TEST_SUB PROK-DIET-LOG2-4_SUB PROK-URN PH-TEST_SUB PROK-DIET-LOG2-4_SUB PROK-URN PH-TEST_SUB PROK-DIET-LOG2-4_SUB PROK-URN PH-TEST_SUB PROK-LOG-PHOTO_SUB :15 PROK-OCA-DNLK :05 Day 0 Day prior to Diet start PROK-PH KIT-UNSTOW :05

Baseline 12/09/10 TDC 24-Hour Urine Sample Collection 5 Sessions/Subject: Scheduled for each FD session (FDs 15, 30, 60, 120, & 180): Scheduled over 24-hr period (first morning void on day 1 through post-sleep void on day 2 to capture first morning void on both days); For planning purposes, 5 voids per crew per 24-hr period chosen as basis of calculation: - First and last urine collects/inserts of each 24-hr period scheduled in post-sleep - CS represents Cold Stowage unit: CS = MELFI for MELFI; CS = GLCR for Glacier - If urine ops scheduled on off-duty days, use 3 urine collect/insert placeholders on day 1 and 2 urine collect/insert placeholders on day 2 to ensure 24 hrs of collection For NUTR/REP/PROK combined sessions (X = A): Scheduled to begin 72 hrs after start of 4-day diet period and 24 hrs prior to blood ops For NUTR/REP combined sessions (X = B): Scheduled to begin within 24 hrs of blood ops Nutrition - Repository - PRO K Once/Subject (any session) Day prior to 24-Hr Collection start HRF-URINE-STOW 1st Day of 24-Hr Collection2nd/Closeout Day of 24-Hr Collection HRF-URINE-SETUP :20 3 times throughout the day :20:05 24 hrs HRF-URN-CLCT_SUB_X HRF-URINE CS-INS :20:05 HRF-URN-CLCT_SUB_X HRF-URINE CS-INS HRF-URN-CLCT_SUB_X HRF-URINE CS-IN1 :10:20 :05 NUTR-HISD-PHOTO Crew

Baseline 12/09/10 TDC Blood Collection & Processing Day within 5 days HRF-BLOOD-COAG Day prior to Blood Collection :20 HRF-BLOOD-SETUP_X HRF2-RC-TRACK HRF2-RACK/PC-TRACK HRF-BLOOD-STOW Blood Sample Collection & Processing Nutrition - Repository - PRO K < 1 hr HRF-BLOOD-DRAW_OPR HRF-BLOOD CS-INS HRF-RC-CNFG_X HRF2-RC-SPIN 30 HRF-SPIN-CNCLD HRF-RC-SETUP_X :05 :15 :10 :30 :15 :05 NUTR-HISD-PHOTO 5 Sessions/Subject: Scheduled for each FD session (FDs 15, 30, 60, 120, & 180): Scheduled on FD session day: - Blood draws: Scheduled in post-sleep; Not scheduled two weeks prior to EVA unless approved and supervised by crew surgeon or his/her designee - CS represents Cold Stowage unit: CS = MELFI for MELFI; CS = GLCR for Glacier For NUTR/REP/PROK combined sessions (X = A): Scheduled 96 hrs after start of 4-day diet period and 24 hrs after start of 24-hr urine ops For NUTR/REP combined sessions (X = B): Scheduled within 24 hrs of 24-hr urine ops start :10 HRF-BLOOD-DRAW_SUB_X :10 :15 HRF-PHOTO OCA-DNLK Nutrition photo series (3 photos: 1 for urine ops & 2 for blood ops) Crew Ground Time Critical Optional (Subject preference) Once/Subject (any session) :10:20 1:00 30 mins ESA-HRF2-ACT PLC PRO-HRF2-ACT CMD HRF2-RACK-PWRUP CMD 1:00 :30 HRF2-RACK-PWRDN CMD PRO-HRF2-DACT CMD ESA-HRF2-DACT PLC