4/11/2014 LIU-SPS ABT review1 M.J. Barnes, L. Ducimetiere, T. Kramer, W. Weterings Acknowledgements: E. Carlier, G. Rumolo, B. Salvant, C. Zannini.

Slides:



Advertisements
Similar presentations
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Advertisements

1/10/2014 LIU-PS ABT review1 T. Kramer, L. Ducimetiere, L. Sermeus.
Progress of the BEPCII Injection System Kang Wen.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
MKI Magnet Design, PT100 Sensor Locations & Heating Observations in 2011 M.J. Barnes Acknowledgements: H. Day, L. Ducimetiere, N. Garrel 23 November 20111M.J.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Update on MKI Performance: TS3 to 02/10/2012 M.J. Barnes Acknowledgements: P. Adraktas, V. Baglin, A. Bertarelli, G. Bregliozzi, S. Calatroni, F. Caspers,
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
1 July 11, 2008Mike Barnes, AB/BT Present Status and Future Plans for the MKD Beam Dump Kickers Acknowledgements: input gratefully received from Fritz.
LSWG day: Impedance and beam induced heating Nicolas Mounet *, Daria Atapovych, Nicolò Biancacci, Elias Métral, Tatiana Pieloni, Stefano Redaelli, Benoit.
Status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, N. Mounet, T. Rijoff, B. Salvant.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Sergio Calatroni, Fritz Caspers, Hugo Day,
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Update on wire scanner impedance studies
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
LIU and (E)YETS LIU-SPS Coordination Meeting 28/01/15 David Mcfarlane
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
High Order Mode Suppressors (HOMS) for SPS TWC200 (Sébastien Calvo, David Bastard) 25 November 2015 LIU-SPS Coordination Meeting.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
News and hot topics Impedance meeting 14/04/2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Feasibility of, and options for, the new MKE kicker concept M.J. Barnes, T. Kramer Acknowledgements: L. Ducimetière, B. Goddard, B. Salvant, J. Uythoven,
LIU-ABT systems: SPS T. Kramer, E. Carlier, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 4 th November /11/2014 SPS LIU-ABT Systems Review2.
LIU budget cuts – SPS savings? First brainstorming discussions!!! BG 30/4/14.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
Heating and Outgassing from MKP- L Magnet M.J. Barnes & L. Sermeus Acknowledgements: M. Beck, H. Bartosik, G. Bregliozzi, C. Pasquino, G. Rumolo, L. Vega.
LIU-ABT systems: SPS, W. Weterings M.J. Barnes, L. Ducimetière, N. Magnin, W. Weterings Acknowledgements: A Adraktas, M. Beck, G. Bellotto, S. Bouleghlimat,
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Vacuum System P. Chiggiato TE-VSC
Present Status and Future Plans for the MKE Kicker Magnets
TE-MSC activities in SPS during LS2
Longitudinal impedance of the SPS
AD consolidation activities in LS2
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Capacitive pick-up on MKP: why, when, who, resources, others
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
LIU and TE/ABT/PPE activities
Impedance working group update
Also on behalf of V. Senaj & L. Ducimetière
MKI Operational Experience and Future Plans
C. Zannini, G. Rumolo, V.G. Vaccaro
Status of the EM simulations and modeling of ferrite loaded kickers
Multiphysics simulations of impedance effects in accelerators
Cryogenic management of the LHC Run 2 dynamic heat loads
AC-Dipole Limitations and Options for its Upgrade
Presentation transcript:

4/11/2014 LIU-SPS ABT review1 M.J. Barnes, L. Ducimetiere, T. Kramer, W. Weterings Acknowledgements: E. Carlier, G. Rumolo, B. Salvant, C. Zannini

Content Expected Issues Possible Upgrades Schedule Budget /Spending Profile Manpower/ Resources 4/11/2014 LIU-SPS ABT review2

Expected Heating Issue 4/11/2014 LIU-SPS ABT review3 *: C. Zannini and G. Rumolo, “Impedance model of the new MKE concept”, LIU-SPS Open 'C' Core MKE Extraction Kicker Review, 20/3/2013. **: M. Timmins, A. Bertarelli, J. Uythoven, E. Gaxiola, “SPS Extraction Kicker Magnet Cooling Design”, AB-Note BT (Rev.2) HV Plates Ferrite Silver painted stripes 80°C (measured with PT100s) [ΔT meas =60°C ] corresponds to the ferrite Curie temperature of ~125°C [ΔT actual =105°C]**. Example of estimating ΔT (ΔT est ) for HL-LHC: ΔT est = 33˚C*(105˚C/60˚C)*(1650W/1000W)=95˚C, and assuming a worst-case cooling water temperature of 28˚C  T=123˚C. This is near the Curie temperature of 8C11/CMD5005 ferrite. 25ns data: measured temperature rise from April 2012; 50ns data: measured temperature rise from August 2012.

Ferrite Temperature  MKEs are currently cooled with demineralised water (20-28˚C).  Water cooling allows the MKE to operate with ~twice the beam induced power deposition (ref: AB-Note BT (Rev.2)).  With the expected beam induced power deposition of 1.65kW/magnet for HL-LHC (with the present serigraphy), the estimated (actual) ferrite temperature is:  ~125˚C for 25ns beam (corresponds to the Curie temperature);  ~105˚C for 50ns beam (uncomfortably close to the Curie temperature).  Mixed (12˚C) or chilled (6˚C) water would give a reasonable reduction (up to ~20˚C) in ferrite temperature.  Back of the envelope calculations indicate that increasing the emissivity of the inside of the MKE tanks (as per the MKIs) could result in a significant radiated power (15-25%), further improving cooling of the ferrite – but current tanks could be radioactive, thus difficult to treat.  Samples of CMD10 ferrite have been obtained for evaluation for possible future use in the MKIs: CMD10 has a Curie temperature of ~250˚C. The CMD10 samples have been tested and Oked by the vacuum team. CMD5005/CMD10/CN20, or a mix of some of these, could give a significant thermal operating margin, for the MKEs, for HL-LHC beam. Equivalent to 8C11 CMD10 also has a saturation flux- density (Bs) greater than CMD5005 but has a lower u’ (acceptable for MKIs, but needs to be checked for MKEs) 4/11/2014 LIU-SPS ABT review4

Ferrite Power Deposition 4/11/2014 LIU-SPS ABT review5 For given properties of the ferrite (permittivity and permeability [which are frequency dependent]), the length/overlap of the serigraphy determines the resonant frequency.  Reducing the length of serigraphy from 200 mm to ~180 mm is expected to increase the resonant frequency from 44 MHz to 49 MHz, close to an optimum for 25 ns and 50 ns beams.  The total power deposition is expected to be reduced from ~1650 W to ~850 W for 25 ns beam, and ~1150 W to ~820 W for 50 ns beam: 850 W  80˚C estimated with 28˚C.  Measurements (on a single cell or MKE magnet?) are required to confirm the predictions and hence the optimum length of serigraphy. Measurements on an S-type magnet would leave an L–type spare. 230 mm (length of ferrite block) 200 mm length (presently) Predicted power loss due to serigraphy peak as a function of frequency of the peak (σ=20 cm): 200 mm Courtesy of Carlo Zannini ~70% of total ~60% of total

4/11/2014 LIU-SPS ABT review6 25 ns Ecloud Studies (25/04/12-26/04/12) Ecloud is present in the MKEs with 25ns beam. Possibly coating the, aperture side, surface of the ferrites with Cr 2 O 3 or amorphous Carbon (aC) could eliminate Ecloud: this has not been tried at CERN. aC could suffer from high instantaneous power loss during pulsing, therefore Cr 2 O 3 may be a better option. Could/ should this be tested on an operational MKE or a dummy (retractable) MKE in the SPS?

4/11/2014 LIU-SPS ABT review7 Cost/Manpower: Chiller Chiller: Chiller (variable down to 6˚C) installed in tunnel, with a closed secondary cooling circuit; Disadvantage Condensation issues on magnet feedthroughs to consider (at low water temperatures); Advantages Magnets do not need to be rebuilt. Cost: approximate estimate of 40 kCHF per each of MKE4 and MKE6, including stainless-steel piping; Manpower: 6 person months for design and installation (parallel cooling circuits per extraction, where to put chiller, ….?) If optimized serigraphy is used, a chiller gives additional operating margin for ferrite heating (especially important if σ < 20 cm).

4/11/2014 LIU-SPS ABT review8 Cost/Manpower: Ferrite/Serigraphy New ferrite and/or new serigraphy: 10 MKE magnets MKE4 [3L, 2S], MKE6 [2L, 1S] & 2 spares [1L, 1S]) need to be rebuilt (if MKE4 is kept as per present): 2 less MKEs required for short-circuit configuration. ~3-4 months for bake-out of 10 magnets worth of ferrite to 1000˚C (probably not needed for change of serigraphy length); New ferrite: 231 kg/magnet  45 kCHF/magnet (estimate); Replace large vacuum seals of MKE tanks (~2 kCHF/magnet); Install 2 vacuum valves per magnet: 50 kCHF per magnet (allows vacuum to be broken in SPS ring without having to recondition all magnets) – expensive option…. Total person power for preparation and installation of 2 magnets (not inc. bake-out): With manual pulse conditioning: ~5.5-6 person months before TS + ~1 month in TS; With automatic pulse conditioning: ~4-4.5 person months before TS + ~1 month in TS. (manual conditioning: save ~3 weeks per magnet with automatic conditioning) Technical Stop (TS)

LS 4LS 5Run 5 LS2 starting in 2018 (July)=> 18 months + 3 months BC LS3LHC: starting in 2023 =>30 months + 3 months BC Injectors: in 2024=>13 months + 3 months BC LHC schedule beyond LS1 Beam commissioning (BC) Technical stop (TS) Shutdown Physics (Extended) Year End Technical Stop: (E)YETS Run 2Run 3LS 2 Run 2Run 3 LS 2 EYETS YETS F. Bordry: With only 1 L-type and 1 S-type spare: Only 2 MKEs can be swapped during a YETS (3 months) maybe 3 MKEs during EYETS; e.g. 2 MKE4s during Q1 2016, 3 MKE6s during Q1 2017, 2 MKE4s during Q1 2018, last MKE4 during LS2. With an extra L-type spare (but we do not have spare tanks….): 3 MKEs can be swapped during a YETS (3 months); e.g. all 3 MKE6s during Q1 2016, 3 MKE4s during Q1 2017, last 2 MKE4s during Q /11/2014 LIU-SPS ABT review9

Budget breakdown The following assumes that MKE4 is kept as per present (5 terminated MKEs): 2 less MKEs are required for a short-circuit configuration. Total budget for new serigraphy: ~30 kCHF (including labour for removing end (~20mm) of present serigraphy, cleaning); Total manpower (FSU) for assembly and installation: ~50 kCHF (6 person months); Modify lifting device to reduce radiation exposure of personnel: ~5 kCHF; Total budget for new seals for vacuum tanks: ~20 kCHF; Estimated total budget for Cr 2 O 3 : ~20kCHF; Total budget for chiller system: ~80 kCHF (to be spent ~2018, depending on effectiveness of new serigraphy and/or desired thermal margin). Detailed breakdowns to be done. Total budget for new ferrite type is ~450 kCHF (expensive and not necessary if optimum serigraphy length reduces power deposition to ~850 W, as predicted). Total budget for 2 valves per tank is ~500 kCHF (expensive for gain !). 4/11/2014 LIU-SPS ABT review10

Spending per year in kCHF Year Total ?+3080?+125 Spending Profile for Rebuilding MKEs Cooling option in purple. 4/11/2014 LIU-SPS ABT review11 Following spending profile is: with new serigraphy, large seals for tank, coating of ferrite (e.g. with Cr 2 O 3 ) and new lifting device; without new ferrite, valves or dummy magnet; assumes that MKE4 is kept as per present (5 terminated MKEs). Notes: a)if MKE4 is reconfigured with 3 short-circuit magnets, a total (including spares) of 8 (instead of 10) MKEs are required. This would save ~20 kCHF by reducing the number of MKE4 magnets by two. b)if MKE4 is reconfigured with 3 short-circuit magnets, a 4 th MKE could be installed with 180 mm serigraphy and Cr 2 O 3 : installing sector valves around this MKE would cost ~100 kCHF.

Manpower/Resources For chiller system: 6 person months for design and installation. For rebuilding, testing etc. 10/8 magnets and installing 8/6 magnets: ~ 35/28 person months with manual conditioning; ~ 28/21 person months with automatic conditioning Up to 3 person months for new conditioning system for lab (+ some hardware). No detailed manpower planning available yet Conceivable that additional manpower is needed. Assembly area for magnet and generator will be 867 (within controlled zone). HV-Test cage for system testing is needed /11/2014 LIU-SPS ABT review12

Conclusions Estimates presented for; Reducing length of serigraphy: measurements required (on at least 1 cell, and preferably a full [S-type?] magnet) for confirming impedance predictions; Painting aperture surface of ferrites with either aC or Cr 2 O 3 ; Using a chiller (gives additional safety margin, especially useful if bunch length < 20 cm); Replacing ferrite with a higher Curie Temperature version – expensive and probably not required; Vacuum valves – expensive. But cost estimates and manpower would be impacted by MKE4 configuration (terminated or short-circuit mode). 4/11/2014 LIU-SPS ABT review13

4/11/2014 LIU-SPS ABT review14

Reserve slides 4/11/2014 LIU-SPS ABT review15

Beam induced heating estimation 4/11/2014 LIU-SPS ABT review mm serigraphy Courtesy of Carlo Zannini

Beam induced heating estimation 4/11/2014 LIU-SPS ABT review mm serigraphy Courtesy of Carlo Zannini

Cooling test bench: ferrite temperatures at different probe positions Slide information from: SPS Extraction Kicker Magnet Cooling Design M. Timmins, A. Bertarelli, J. Uythoven, E. Gaxiola AB-Note BT (Rev.2) TS-Note DEC (Rev. 2) 4/11/2014 LIU-SPS ABT review18

43˚C 28˚C 23˚C 25 April-26 April, 2012: 25 ns beam Ecloud studies 4/11/2014 LIU-SPS ABT review19 Courtesy of Carlo Zannini

We assume a bunch length of about 18 cm with the 25 ns beam at flat bottom 25 April-26 April, 2012: 25 ns beam Ecloud studies G. Papotti In very good agreement with the measured heating 4/11/2014 LIU-SPS ABT review20 Courtesy of Carlo Zannini

Ref: Glenn Vanbavinckhove, Open 'C' Core MKE Extraction Kicker Review, 20/3/ /11/2014 LIU-SPS ABT review21

Ref: Glenn Vanbavinckhove, Open 'C' Core MKE Extraction Kicker Review, 20/3/ /11/2014 LIU-SPS ABT review22

4/11/2014 LIU-SPS ABT review23 50 ns Normal Operation (15/08/12-16/08/12) Ecloud is not so obviously present for 50 ns beam.