May 18, 2006 Slide 1 doc.: IEEE 802.15- 15-06-0146-03-003c Submission Ali Sadri (Intel Corporation) Project: IEEE P802.15 Working Group for Wireless Personal.

Slides:



Advertisements
Similar presentations
Doc.: IEEE s Submission January 2015 Mineo Takai, Space-Time EngineeringSlide 1 Project: IEEE P Working Group for Wireless Personal.
Advertisements

July 2005 Slide 1 doc.: IEEE / 419 r0 Submission Abbie Mathew, NewLANS Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0395r1 Submission July 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0136r0 Submission March 2006 Abbie Mathew, NewLANS Project: IEEE P Working Group for Wireless Personal Area Networks Submission.
July 2004 Jay Bain, Fearn Consulting doc.: IEEE /0379r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal Area.
September 2003 doc.: IEEE Submission Slide 1 Jason Ellis, Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE Submission doc. : IEEE March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /244r1 Submission July 2000 James P. K. Gilb, MobilianSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE Submission Sept Byung-Jae Kwak, ETRISlide 1 NOTE: Update all red fields replacing with your information; they are.
Doc.: b Submission January 2006 Marco Naeve, Eaton Corp. Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: Submission May 2006 Myung LeeSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE /241r4 Submission November 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE g TG4g Presentation Jan 2010 C.S. Sum1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)‏
Doc.: IEEE c Submission July, 2005 Skafidas,Pollock,Saleem, NICTASlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE c TG3c November 2006 R. Fisher, Oki Electric Industry co. LtdSlide 1 Project: IEEE P Working Group for Wireless Personal.
January 2005 Abbie Mathew, NewLANS Slide 1 IEEE /053r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks Submission.
<month year> doc.: IEEE /271r0 September, 2000
Submission Title: [Add name of submission]
July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13.
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
平成30年11月 doc.: IEEE /424r1 July 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
平成30年11月 doc.: IEEE /424r1 May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing.
平成30年11月 doc.: IEEE /424r1 March 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c.
平成30年11月 doc.: IEEE /424r1 March 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c.
Submission Title: [Wireless Display Throughput Requirements]
<month year> doc.: IEEE <030158r0> March 2004
May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
平成30年11月 doc.: IEEE /424r1 September 2006
Submission Title: [Wireless Display Throughput Requirements]
平成30年12月 doc.: IEEE /424r1 January 2007
doc.: IEEE <doc#>
January 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
July 2013 Robert Moskowitz, Verizon
<month year> doc.: IEEE <xyz> January 2001
Submission Title: Modification of time planning for the task group 3d
January 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
<month year> doc: IEEE c November 2006
January 2003 doc.: IEEE /056r0 May 2004
平成31年2月 doc.: IEEE /424r1 November 2007
<month year> doc.: IEEE <030158r0> September 2003
July 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: July 2014 closing report Date Submitted: July.
September 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group.
October 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted:
doc.: IEEE <doc#>
Submission Title: [Frame and packet structure in ]
July 2013 Robert Moskowitz, Verizon
<month year>20 Jan 2006
<month year> doc.: IEEE <030158r0> January 2004
May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
March 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
<month year> doc.: IEEE / September 2004
doc.: IEEE <doc#1>
<month year> doc.: IEEE / July 2004
10 May 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Open Issues with the TG3 Criteria Document]
Submission Title: [ e Schedule Update]
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
20 July, 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [5/19/2005]
Robert Moskowitz, Verizon
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
Project: IEEE P Working Group for Wireless Personal Area Networks
September 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suggested TG3c PAR Changes] Date Submitted:
平成31年7月 doc.: IEEE /424r1 November 2007
July 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Flexible DSSS Merging Effort] Date Submitted:
Submission Title: TG9ma Agenda for September Meeting
November 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [21.
Presentation transcript:

May 18, 2006 Slide 1 doc.: IEEE c Submission Ali Sadri (Intel Corporation) Project: IEEE P Working Group for Wireless Personal Area Networks Submission Title: [Usage Model Document (UMD) Status Report] Date Submitted: [July, ] Source: [Ali Sadri] Company: [Intel Corporation] Address: [Intel Corporation, Evening Creek Drive,San Diego, CA ,USA ] Abstract: [Update of activities in the Usage modeling sub-group] Purpose:[Contribution to TG3c at July 2006 Interim meeting in San Diego] Notice:This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P

May 18, 2006 Slide 2 doc.: IEEE c Submission Ali Sadri (Intel Corporation) Objective Develop Usage Models Document, the UMD, is the guide for the Technical Requirements, and to generate simulations for specified well- defined simulation scenarios provided by the Selection Criteria and Channel Modeling documents

May 18, 2006 Slide 3 doc.: IEEE c Submission Ali Sadri (Intel Corporation) Status  Three conference calls to date since May Jacksonville meeting  Tasks completed before San Diego meeting 4 contribution received on the Usage Models4 contribution received on the Usage Models  Tasks completed during Jacksonville meeting Define usage models and simulations scenariosDefine usage models and simulations scenarios Tasks aheadTasks ahead Update MAC attributes for the list of defined usage modelsUpdate MAC attributes for the list of defined usage models Finalize UMDFinalize UMD

May 18, 2006 Slide 4 doc.: IEEE c Submission Ali Sadri (Intel Corporation) IEEE Plan to Baseline Document  05/06 (Jacksonville, FL) – Issue CFP, finalize channel model document. Continue development of UMD  Future Plans: oMay 30, 2006, Usage Model scenarios are due o07/06 (San Diego, CA) – Finalize channel model work, Finalize UMD, Issue CFP o09/06 (Melbourne) – Finalize channel model document, Continue MAC discussions and make recommendations for MAC development o11/06 (Dallas) – Final proposals due 1 week prior to meeting, begin presentations of all proposals o1/07 (London, UK) - Down selection begins, begin drafting standard

May 18, 2006 Slide 5 doc.: IEEE c Submission Ali Sadri (Intel Corporation) Conference Call  Weekly conference calls on Wednesdays, 5 PM PST  Conference call Information Telephone Number:(319) Telephone Number:(319) Access Code: #Access Code: # Documents are shared on WebXDocuments are shared on WebX Request username and password from the organizer (Ali Sadri, username and password from the organizer (Ali Sadri,