Design Update Puck and Gun Magnet February 16, 2016.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
The present CEBAF Wien Spin Manipulator: Designed for 100kV beam and max rotation +/- 110 degrees Adaptation of SLAC design (how different?) X turn coil.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
FACET Exp Area Christine Clarke 3 rd October 2013.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SBS Magnet and Infrastructure Status Robin Wines July 2015.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
SBS Magnet and Support Status Robin Wines June 2013.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Magnetized Beam Update (LDRD) JLEIC Collaboration Meeting March 29, 2016 Riad Suleiman and Matt Poelker.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Pull Force Measurements of the Magnetized Beam Solenoid
JLEIC R&D weekly meeting, Thursday Jan 26, JLab.
PIs: Riad Suleiman and Matt Poelker
F.E.T.S. Mechanical Engineering Update
AEGIS Magnet System.
Test beam setup: status report 10/02/2009
Experimental Overview
MDL0L02 Dipole and Environmental Fields
SoLID Magnet - Engineering and Cost
MDL0L02 Dipole Field July 6, 2016.
MDL0L02 Dipole Field Offset
Magnetized Bunched Electron Beam from DC High Voltage Photogun
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Additional Upstream Coil Shielding
MDL0L02 Dipole Hysteresis Loop Study
Laboratory Directed Research and Development (LDRD) Proposal
Bubble Chamber – Beam Requirements
Magnetized Electron Source, LDRD
Production of Magnetized Electron Beam from a DC High Voltage Photogun
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
R. Suleiman and M. Poelker September 29, 2016
Riad Suleiman February 2, 2017
A. Freyberg Aug 2016 ECT’16 =>
NPS Sweep Magnet Field-Mapping
Cooler e-source Magnetized Beam LDRD Progress Report
Puzzles of the VELA bucking solenoid v. 2.0
Challenges and Deadlines for Production
Measurement and Characterization of a 5T Solenoid Field
One Coil Gun Magnet February 2, 2016.
PIs: Riad Suleiman and Matt Poelker
2015 January February March April May June July August September
Cooler e-source Magnetized Beam LDRD Progress Report
Presentation transcript:

Design Update Puck and Gun Magnet February 16, 2016

Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber

Solenoid + Steel Puck 3 18” 7.5” 12” 6” 0.5” 9.0 cm Steel Puck Gun Table 8” 6.4 cm Moly 10” Cathode-Anode Gap Is it possible to replace this 10’’ flange with one that has shorter ports? Maybe not. Is it possible to replace this 10’’ flange with one that has shorter ports? Maybe not.

4

Steel Puck 5 Molybdenum and Steel hybrid puck Designed to enhance field to 2.0kG at cathode Use 1010 carbon steel Re-design new Puck Manipulator End Adapter Order 4 pucks – map with Solenoid Heat Treatment: 1.Un-heated 2.200˚C (Sb) and 120˚C (K – Cs) growth 3.550˚C Heat Cleaning then 200˚C and 120˚C 4.Multiple

6 Puck Puck Manipulator End Adapter

7 Steel Moly 6 mm 10 mm Design I Brazed – not screwed

8 Steel Stainless Steel 2 mm 10 mm Design II 2 mm 4 mm

9 Cut this part 2 mm

Power Supply 10 Use new spare Dogleg power supply (500A, 80V) We have Arne’s permission If needed at CEBAF, we can use an old Dogleg supply (270A, 50V) to keep going Need to add polarity switch to be able to degauss steel

Solenoid 11 Not bakable – will be mounted on rails. Push downstream out of oven and run LCW through. Move gate valve after beamline solenoid (in place of BPM). Move HV Chamber front foot upstream Designed to give 1.4kG at cathode without steel puck Bare coil – no cylindrical steel shield/return Plan to ask companies for design and cost: 1.Everson Tesla 2.Buckley Systems 3.JLab Machine shop Needs a designer for solenoid mount

12 Solenoid Mount Gun Table Rails Allow for small adjustments to center solenoid on beam

Timeline 13 Power Supply (new spare Dogleg) : 1.Being built at Magnet Lab: March 2.Test and add polarity switch: April 3.Move to GTS: May 4.Ready: July 1, 2016 Solenoid: 1. Design: February and March 2. Procure: April 3. Map (with and w/o puck), check hysteresis and forces: July 4.Install: August, 2016 All work has to be completed by September 30, 2016.