Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Prototype Fabrication, Economic, & Test Plan.

Slides:



Advertisements
Similar presentations
College of Engineering and Computer Science Department of Mechanical and Materials Engineering Wright State University Regular Class Aircraft SAE Aero.
Advertisements

Propulsion PDR 1 Team 1 September 21, 2006.
The Black Pearl Design Team: Ryan Cobb Jacob Conger Christopher Cottingham Travis Douville Josh Johnson Adam Loverro Tony Maloney.
SAE AERO Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) Brian Martinez.
Airplane Flight: X-Plane in the Classroom Wing Loading Ratio of the plane’s weight (w) divided by the surface area of the wing (s)
Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) SAE AERO Chase Beatty.
Team USYD National Aircraft Design-Build-Fly Competition.
1 Structures QDR1 Ashley Brawner Neelam Datta Xing Huang Jesse Jones Team 2: Balsa to the Wall Matt Negilski Mike Palumbo Chris Selby Tara Trafton.
1 Design Group 2 Kat Donovan - Team Leader Andrew DeBerry Mike Kinder John Mack Jeff Newcamp Andrew Prisbell Nick Schumacher Conceptual Design for AME.
Project Presentation Boiler Xpress December 5, 2000 Team Members Oneeb Bhutta Matthew Basiletti Ryan Beech Micheal Van Meter AAE 451 Aircraft Design.
Team 18 Dan Breuker Jon Cory Matt Edwards Kyle Israels.
AAE 451 Aircraft Design Aerodynamic Preliminary Design Review #1
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Critical Design Review Team 1.
DR2 Stability and Control Preliminary Design Review and Performance PDR October 24, 2000 Presented By: Christopher Peters …and that’s cool Team DR2 Chris.
Vehicle Sizing PDR Presented by: Mark Blanton Chris Curtis Loren Garrison September 21, 2000 Chris Peters Jeff Rodrian DR2.
The Barn Owls Chris “Mo” Baughman Kate Brennan Christine Izuo Dan Masse Joe “Sal” Salerno Paul Slaboch Michelle Smith.
March 3, Structures and Weights 2 PDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason.
October 30, 2001A&AE Fall, Critical Design Review Brian Barnett Rob Benner Alex Fleck Ryan Srogi John Keune.
Team 5 Aerodynamics QDR Presented By: Christian Naylor Charles Reyzer.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Structures 1 PDR Team “Canard” October 12th,
Team 5 Prototype Fabrication, Economic and Test Plan QDR Presented By: Maria Mullins Charles Stangle.
Prototype Fabrication, Economic, & Test Plan QDR Tung Tran Matt Drodofsky Haris Md Ishak Matt Lossmann Purdue University AAE 451 Fall 2006 Team 4 Mark.
March 1, Aerodynamics 3 QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason Tang Joe.
March 10, Dynamics & Controls 2 PDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason.
March 22, Prototype Fabrication Economic & Test Plan QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Propulsion QDR 2 Team 1 October 3, 2006.
DR2 Structures PDR Structures and Weight Preliminary Design Review October 5, 2000 Presented By: Jeff Rodrian & Chris Curtis Team DR2 Loren Garrison Chris.
Team 5 Structures PDR Presented By: Ross May James Roesch Charles Stangle.
Flight Performance, Stability and Control PDR Brian Barnett Rob Benner Ryan Srogi John Keune Alex Fleck.
AAE 451 – Fall 2003 Ares Team Mir Rashiduzzaman Alethea Tan Kai-Hui Leong Darwin Lisan Jung Hyun Ahn John Ko.
Slide 1 Announcements/Opportunities Next year’s Aircraft Design class: –We will (again) have a joint team with ME to build and fly a morphing airplane.
Team 5 Critical Design Review Trent Lobdell Ross May Maria Mullins Christian Naylor Eamonn Needler Charles Reyzer James Roesch Charles Stangle Nick White.
Team “Canard” September 19th, 2006
2015 SAE Aero East Design Team 2015 SAE Aero Design East Team Mid-Term Status Report (3/5/2015)
Dane Batema John Tapee Audrey Serra Patricia Roman Kyle RyanCarlos Vergara Benoit BlierDrew Capps Team 1: Lessons Learned and Vehicle Summary Team “Canard”
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Preliminary Sizing PDR 26 September, 2000.
The Lumberjacks Team /16/12 Brian Martinez.
Group 13 Heavy Lift Cargo Plane Richard-Marc Hernandez Yoosuk Kee Stephen McNulty Jessica Pisano Chi Yan Project Advisor: Siva Thangam.
Lancair IV-P “The Kit that sets the Standards” Designed by Lance Neibauer Plane & Pilot, Aug 98 Lancair website.
AAE 451 Aircraft Design First Flight Boiler Xpress November 21, 2000
Ancient Greece Myth of Daedalus & Icarus
February 24, Dynamics & Controls 1 PDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason.
2015 SAE Aero Design East Team
DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris.
Presented By: Aaron Goodwin Mike Pyrkosz April 15, 2004 Aquarium Wave Generator Project # A Design Review.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Propulsion QDR 3 Team 1 October 17, 2006.
The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept.
Dynamics & Controls PDR 2
Yaqoub Almounes John Cowan Josh Gomez Michael Medulla Mohammad Qasem
Vehicle Sizing AAE 451: Team 2 Michael Caldwell Jeff Haddin
Sae – aero micro capstone
Aircraft Design Process
AUTONOMOUS LONG-ENDURANCE UAV (SMART INTERN PROJECT)
Team 5 Final Design Review
Structures and Weights 1 QDR
Project Plan Review Team “Canard” September 14th, 2006 Team 1:
Team 5 Final Design Review
Fuel Cell UAV 2016 PROJECT ADVISORS DR. ZHANG AND DR. DEMUREN
Team 5 Project Plan Review
به نام خداوند خورشید و ماه
Project Status Review Purpose: To anticipate prototype performance
Fabrication, Economics and Test Plan QDR
Vehicle Sizing PDR Team “Canard” September 14th, 2006 Team 1:
Prototype Fabrication, Economic, & Test Plan QDR
Prototype Fabrication, Economic, & Test Plan QDR
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
Aether Aerospace AAE 451 September 19, 2006
Prototype Fabrication, Economic and Flight Test Plan PDR
Aether Aerospace AAE 451 September 6, 2006
Presentation transcript:

Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Prototype Fabrication, Economic, & Test Plan QDR

AAE 451 Team 1 2 Preconstruction Plans

AAE 451 Team 1 3 Airfoil Fabrication

AAE 451 Team 1 4 Fuselage Construction

AAE 451 Team 1 5 Propulsion/Wing Economics

AAE 451 Team 1 6 Other Economics If small budget exceedance is problematic, donations can easily be secured.

AAE 451 Team 1 7 Man-Hours Hours Worked to Date: 1250 man-hours Construction (Est): 850 man hours Total Hours: 2100 Typical Work Hours Estimate / Person

AAE 451 Team Find Actual CG 1.Adjust if needed 2.Test 10g wing loading (before Sean) 3.Test control surfaces –w/o engine –w/ engine 4.Comms w/ and w/o engine running (check for interference) 5.Test comms at long distance (driving test) 6.Full motor power duration test (static) 7.Remote control and servo calibration 8.Rate gyro test and tuning 9.Takeoff test 10.Flight endurance test 11.Test high speed flight Test Schedule Thurs 11/16 Fri 11/17 Sat 11/18 Sun 11/19