JRA1 Status: PCMAG, Testbeam Infrastructure and Pixel Telescope Tobias Haas DESY/F1 27 August 2007.

Slides:



Advertisements
Similar presentations
Testbeam Planning 2008 JRA1 Meeting, Geneva May 21 st 2008 Ingrid-Maria Gregor DESY.
Advertisements

F1 Contribution to ILC Vertex Detector Tobias Haas 23 Febuary 2005.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
SPiDeR  First beam test results of the FORTIS sensor FORTIS 4T MAPS Deep PWell Testbeam results CHERWELL Summary J.J. Velthuis.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
Calibration, simulation and test-beam characterisation of Timepix hybrid-pixel readout assemblies with ultra-thin sensors International Workshop on Future.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The pixel telescope DAQ Daniel Haas/Emlyn Corrin DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam.
Who is UMA ? Peter Fischer, I. Peric, F. Giesen, V. Kreidl Lehrstuhl für Schaltungstechnik und Simulation Institut für Technische Informatik Universität.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
JRA1 Status: PCMAG, Sensors and Infrastructure Tobias Haas DESY/F1 11 September 2006.
DESY test beam (DAQ integration, measurement plans, analysis) Mathieu Benoit.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
Tobias Haas DESY 8 November 2005 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET First general ideas (with some interludes)
1 EUDET Detector R&D towards the International Linear Collider Status and Plans Joachim Mnich VLCW06 Vancouver, July 2006.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Towards the ‘final’ JRA1 DAQ Daniel Haas DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam Outline.
Monolithic Active Pixel Sensors (MAPS) News from the MIMOSA serie Pierre Lutz (Saclay)
ATLAS micromegas activities (MAMMA)
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Status Daniel Haas DPNC Genève Status DAQ board INFN Strasbourg DAQ boards TLU Bristol Software.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
EUDET Pixel-related DESY Tobias Haas 29 June 2006.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1: Pixel Telescope Test Beam Campaigns Pixel Telescope: Status Demonstrator Testbeam 1 (DESY) Testbeam 2 (DESY)
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
Amsterdam, Oct A. Cotta Ramusino, INFN Ferrara 1 EUDRB: status report and plans for interfacing to the IPHC’s M26 Summary: EUDRB developments.
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
Micromegas projects and future tests Phone meeting August 26th, 2009.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
JRA1 Magnet and Test Beam Infrastructure  Superconducting Magnet (PCMAG)  Mechanics  Cooling  Telescope Simulations  Measuring DESY Tobias.
JRA1 PCMAG field mapping Elements of the work: Hall sensors: improvements and production Calibration of Hall sensor cards Mechanical mapping device Installation.
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
EUDET: Infrastructure for ILC detector R&D Felix Sefkow ILC detector test beam workshop at Fermilab January 17-19, 2007.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Trigger & Tracking detector for CMS
Atlas: Upgrade Phase I Massimo Della Pietra.
Work progress in Turin x the MVD
DESY contributions to MAPS DESY testbeam
DESY Test Beam Facilities - Status and Plan
Silicon Lab Bonn Physikalisches Institut Universität Bonn
3. Februar 2006 Tobias Haas DESY
Planning for the Demonstrator
Test Beam Measurements october – november, 2016
EUDET Extended SC meeting 31 August 2009
Presentation transcript:

JRA1 Status: PCMAG, Testbeam Infrastructure and Pixel Telescope Tobias Haas DESY/F1 27 August 2007

Tobias Haas: JRA1 Status This Talk JRA1 Organization and Planning JRA1 Organization and Planning Magnet Magnet Telescope Telescope Test beam campaigns Test beam campaigns Next steps Next steps Personnel Personnel

27 August 2007Tobias Haas: JRA1 Status JRA1 General Purpose Test beam infrastructure General Purpose Test beam infrastructure DESY Test beam DESY Test beam PCMAG PCMAG Pixel telescope Pixel telescope high precision (~ 1 µm even in a 6 GeV/c electron beam) high precision (~ 1 µm even in a 6 GeV/c electron beam) reasonably large area (~ 1 – 2 cm) reasonably large area (~ 1 – 2 cm) Fast readout (~1kHz frame rate) to handle higher rate environments Fast readout (~1kHz frame rate) to handle higher rate environments  Staged Implementation Demonstrator telescope with slightly less precision and slower R/O (analog pixel sensor) Demonstrator telescope with slightly less precision and slower R/O (analog pixel sensor) Final telescope with high precision and high rate (pixel sensor with ADC and data reduction on chip Final telescope with high precision and high rate (pixel sensor with ADC and data reduction on chip

27 August 2007Tobias Haas: JRA1 Status Detailed planning constantly being iterated Current Planning now DESY Demonstrator Integration Starts PCMAG Available Demonstrator Available Final Telescope Available PCMAG Field Mapping

27 August 2007Tobias Haas: JRA1 Status This Year 2007 JanFebMarAprMayJunJulAugSepOctNovDec Review Meeting Review Meeting Review Meeting Testbeam Meeting Testbeam Meeting DESY Test beam I DESY Test beam II CERN Test Beam I CERN Test Beam II With SILC PCMAG Field Mapping

27 August 2007Tobias Haas: JRA1 Status PCMAG Field Mapping July More details → Lucie Linssen

27 August 2007Tobias Haas: JRA1 Status Telescope sensors

27 August 2007Tobias Haas: JRA1 Status Test Beam Campaigns June 2007: DESY June 2007: DESY Commissioning, First beams Commissioning, First beams August 2007: DESY August 2007: DESY Full system, First results Full system, First results September 2007: CERN September 2007: CERN Demonstrate the performance: Demonstrate the performance: Speed Speed Precision Precision

27 August 2007Tobias Haas: JRA1 Status Sensors etc by IRES Mechanics/Cooling by DESY FE Boards by INFN DAQ by Geneva

27 August 2007Tobias Haas: JRA1 Status DESY Test beam I

27 August 2007Tobias Haas: JRA1 Status DESY Test beam I

27 August 2007Tobias Haas: JRA1 Status DESY Test beam II More details → Ingrid Gregor

27 August 2007Tobias Haas: JRA1 Status DESY Test beam II

27 August 2007Tobias Haas: JRA1 Status DESY Test beam II

27 August 2007Tobias Haas: JRA1 Status EU Personnel DESY: DESY: Need a replacement for Julia Fourletova, who has just left. Need a replacement for Julia Fourletova, who has just left. Geneva: Geneva: Emlyn Corrin Emlyn Corrin Bonn Bonn Lars Reuen, student Lars Reuen, student MPI MPI Stefan Rummel, student Stefan Rummel, student CERN CERN Jerome Alozy, student

27 August 2007Tobias Haas: JRA1 Status Other people DESY: DESY: Tatsiana Klimkovich (postdoc) will leave end September Tatsiana Klimkovich (postdoc) will leave end September Philipp Roloff (student) will work on data analysis Philipp Roloff (student) will work on data analysis Geneva Geneva Daniel Haas leaves Daniel Haas leaves INFN INFN Marcin Jastrzab (student) will work on FPGA programming Marcin Jastrzab (student) will work on FPGA programming Antonio Bulgheroni will go to Como and work on the software Antonio Bulgheroni will go to Como and work on the software

27 August 2007Tobias Haas: JRA1 Status Organizational T. Haas → steps down as JRA1 coor T. Haas → steps down as JRA1 coor Proposal: Proposal: I. Gregor takes over I. Gregor takes over 50k money for hw to be spent on various HW at DESY → Geneva 50k money for hw to be spent on various HW at DESY → Geneva Pay for parts of Daniel Haas to continue Pay for parts of Daniel Haas to continue SiLC has requested a common TB in October SiLC has requested a common TB in October Need to organize! Need to organize!

27 August 2007Tobias Haas: JRA1 Status Milestones/Deliverables      ()() Next major milestone: Intermediate Digital Chip (MIMOSA 22+)

27 August 2007Tobias Haas: JRA1 Status Marc Winter

27 August 2007Tobias Haas: JRA1 Status Summary JRA1 is well on track JRA1 is well on track Various test beam campaigns successful Various test beam campaigns successful Demonstrator telescope basically ready Demonstrator telescope basically ready PCMAG Mapping done PCMAG Mapping done Next major milestones: Next major milestones: Intermediate digital chip (MIMOSA 22+) Intermediate digital chip (MIMOSA 22+)