NPRR639 Discussion CWG/MCWG August 20, 2014 1. Current MCE Calculation MCE ignores net purchases of bilateral energy. See red portion of MCE formula below.

Slides:



Advertisements
Similar presentations
NPRR 206 DAM Credit Requirements Reduction: E Values and Percentiles Luminant Proposal.
Advertisements

Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
Automation and Improvements to Default Uplift Methodology (summary/white paper of a draft NPRR)
Concerns with RUC Capacity Short Charge and Energy Trades.
DSWG Update to WMS May 17, DSWG Goals Update.
Seasonal Adjustment Factor Discussion Technical Advisory Committee
Seasonal Adjustment Factor Mark Ruane Credit Work Group ERCOT Public July 23, 2014.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
Market Trials - Friday call Credit and Treasury Weekly Update September 3, 2010.
Day Ahead Market Working Group March 31, Agenda Review minutes - March 24 Coral Proposal - Working Group Discussion Loads/LDCs and DAM.
September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.
Discussion of ERCOT Market Default Alternative to Credit Insurance CWG/MCWG September 17,
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
WMS Subgroup – CRR Credit 3.Review of CRR margining methodology for PTP Obligations in Nodal Protocols 4.Potential credit margin alternatives Cheryl Yager.
Board of Directors Credit Aspects of Mass Transition.
Market Credit Working Group update to the Wholesale Market Subcommittee 06/03/
MCWG Update to WMS 5/11/ Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 4/30/11 remains less than Zonal Estimated.
Market Credit Working Group update to the Wholesale Market Subcommittee 10/07/
MCWG Update to WMS 6/15/ Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 4/30/11 remains less than Zonal Estimated.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
1 Draft NPRR – Revisions to Certain Price Components of EAL CWG/MCWG ERCOT Public January 22, 2014.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
October 20, 2010 WMS Credit Update. 2 Topics Nodal exposure – how much collateral CRR/TCR auctions – December 2010 Preliminary Credit Cutover Timeline.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
1 IMM Pricing Concerns with PFR and FFR Proposed pricing structure provides incentive for FFR to offer at less than cost. Dual clearing price pricing structure.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
Carrie Tucker Supervisor, Day-Ahead Market DAM data supporting MCWG/CWG credit parameters discussion February 29, 2012.
1 Credit Protocols Clarifications and Corrections Mark Ruane Director Settlements, Retail and Credit CWG / MCWG May 20, 2015 ERCOT Public.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
1 Tab X ERCOT Confidential Credit Impact of Increased Caps The credit exposure impact of higher system-wide offer caps was estimated using an internal.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
Market Credit Working Group update to the Wholesale Market Subcommittee 09/02/
Credit Updates Vanessa Spells Credit Work Group ERCOT Public December 16, 2015.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
1 Nodal Credit Update at WMS June 16, 2010.
Mitigation of Credit Tail Risk Exposure Donald Meek Credit Working Group January 20, 2015.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
Default Uplift Max MWh Activity Total Matthew Tozer Manager, Settlements and Billing WMS 1/8/2014.
Item 10: Mitigation of Credit Tail Risk Exposure Donald Meek 2015 Chair, Credit Work Group Finance & Audit Committee Meeting ERCOT Public February 9, 2015.
1 Nodal Day Ahead Invoice Taskforce Update COPS, May 8, 2007.
1 Exposure Stress Testing CWG/MCWG Suresh Pabbisetty, CQF, CSQA. ERCOT Public June 12, 2014.
Credit Parameter Change Technical Advisory Committee of ERCOT July 30, 2014.
1 Review of Minimum Current Exposure (MCE) as revised by NPRR639 Mark Ruane Director Settlements, Retail and Credit TAC July 30, 2015 ERCOT Public.
MCWG Update to WMS 2/9/2010. Agenda Items Exposure / Collateral Status Update 1/26 MCWG/CWG Joint Meeting – Potential NPRR to enable expiring CRRs to.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
October, 2011 MCWG/CWG Review of Abacus Loss Allocation ERCOT Mandy Bauld.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
DAM and Nodal Collateral Requirements Concerns and Solutions December 7, 2009.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
1 NPRR638 Back-casting Updated and Supplementary Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 20, 2015.
CRR Default and the Nodal Market Wholesale Market Subcommittee February 20, 2008.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public May 18, 2016.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
CRR Deration and NPRR821 WMS 09/06/2017.
Credit Reports Vanessa Spells COPS Meeting ERCOT Public
2017 Seasonal Adjustment Factors
DALE MCWG / CWG 3/10/2010.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
Loretta Martin LCRA , Chair Josephine Wan AE, Vice Chair 05/07/2014
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Presentation transcript:

NPRR639 Discussion CWG/MCWG August 20,

Current MCE Calculation MCE ignores net purchases of bilateral energy. See red portion of MCE formula below. MCE = Max[{ [[[L o, i, d, k * T2 - G o, i, d, k * (1-NUCADJ o ) * T3] * RTSPP i, d, k *SAF] + [RTQQNETES o, i, d, k * T1]]/n}, { [G o, i, d, k * NUCADJ o * T1 * RTSPP i, d, k *SAF]/n},{ DARTNET o, i, d, k * T4/n}] RTQQNETES o, i, d, k = Max [0, [[RTQQES o, i, d, k, c * RTSPP i, d, k *SAF] - [RTQQEP o, i, d, k, c * RTSPP i, d, k *SAF]]] 2

Flaw of current MCE design MCE calculates an inflated credit exposure which does not reflect the actual risk posed to the market. Purchases of bilateral energy reduce credit exposure. MCE penalizes prudent hedging decisions. This flaw in MCE gets magnified with SAF increase. Example: Market Participant serves 100MW of Load (L). Market Participant does not own any Generation (G). Market Participant purchases 100MW of firm physical power through bilateral trades (RTQQEP). Market Participant is 100% hedged. MCE zeroes out the hedge and treats Market Participant like it is short its entire load obligation. MCE = (100*T2 – 0)*RTSPP + Max (0, 0 – 100*RTSPP)*T1 = 100MW*T2*RTSPP – MP is actually flat so poses no credit risk to the market Why collateralize them like they didn’t hedge? 3

Hedged Counterparty Price spike occurs on Day 7 L = 100MW, RTQQEP = 100MW, Normal Price = $50/MWh, Price Spike = $9,000/MWh SAF = 100% Note: EAL = $0 4 Actual Exposure is Zero

Why is MCE designed this way? MCE ignores net energy purchases to capture this scenario: A Market Participant in the process of defaulting will not be able to find a trading partner willing to sell them power. This design is misguided for the following reasons: – At any given time, the vast majority of Market Participants are not in the process of defaulting. So why treat everyone like they are? Don’t use a market-wide rule to try to catch exceptions specific to a single Market Participant (or very few). – EAL will immediately pick up the change in hedging behavior when it matters and much more timely than MCE. See slide 6. – MCE allows for netting of DAM bids and offers so inconsistent. – ERCOT has better tools to address the situation with the discretion to ask for more collateral from a Market Participant if their ability to meet credit requirements is threatened (3). An MP-specific issue is better managed through an MP-specific solution. 5

Counterparty that cannot hedge Price spike occurs on Day 7 L = 100MW, RTQQEP = 0MW, Normal Price = $50/MWh, Price Spike = $9,000/MWh SAF = 100% 6 EAL addresses the situation faster than MCE

Why NPRR639? Credit exposure should more closely match the actual risk posed by the behavior. Prudent hedging practices should be incentivized and reflected in the credit risk exposure evaluation (like the rest of our credit rules). Don’t apply a market-wide rule to try to catch exceptions. Current design of MCE punishes the population of MPs for little benefit. Use better tools to address concerns, not a discriminatory approach which creates the wrong incentives. NPRR639 MCE = Max[{ [[[L o, i, d, k * T2 - G o, i, d, k * (1-NUCADJ o ) * T3] * RTSPP i, d, k *SAF] + [RTQQNET o, i, d, k * T1]]/n}, { [G o, i, d, k * NUCADJ o * T1 * RTSPP idk *SAF]/n},{ DARTNET o, i, d, k * T4/n}] RTQQNET o, i, d, k = Max [0, [[RTQQES o, i, d, k, c * RTSPP i, d, k *SAF] - [RTQQEP o, i, d, k, c * RTSPP i, d, k *SAF]]] 7