Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini.

Slides:



Advertisements
Similar presentations
Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
Advertisements

PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
1 [12-Feb-2014] «BE-RF-PM» CLIC TBM Prototype Status update EDMS №[Number] Dmitry Gudkov 1.
Probe beam distortion in TBTS due to high gradient RF acceleration (first part: observations) CTF3/TBTS Logbook 17 May 2013 Wilfrid Farabolini – Alexej.
KCS Ongoing R&D Christopher Nantista SLAC LCWS11 Granada, Spain September 29, …… …… …… … ….
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
Introduction The input network of the power amplifier will be designed in the example. The network synthesized will be expanded to allow for biasing of.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
324MHz FETS RFQ RF measurement and components By Aaron Cheng 18 December 2006.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Christopher Nantista SLAC TILC09 Tsukuba, Japan April 20, 2009.
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Microwave Amplifier Design Blog by Ben (Uram) Han and Nemuel Magno Group 14 ENEL 434 – Electronics 2 Assignment
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
Introduction to Controlling the Output Power of a Transistor Stage A load network will be designed to maximize the output power obtainable from the Mitsubishi.
Feedback from structure tuning: Effects and Compensation of length (phase) difference in dual-feed couplers 22 May 2015 Rolf Wegner.
TD24 R05 N1 after high-power test analysis plans A. Degiovanni, M. Aicheler, N. Mouriz Irazabal, A.T. Perez Fontenla, R. Wegner CLIC RF Structure Development.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
Analysis of TBTS high-gradient testing and breakdown kick measurements Overview of on-going studies Preliminary results 2012 Feb. 291 RF structure development.
PROPOSAL G.I.A.F. (HYBRID GUN AT HIGH FREQUENCY) INFN-LNF – UNIVERSITY OF ROME “LA SAPIENZA”- UCLA D. Alesini (T), M. Ferrario (R), A. Gallo (T),
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
18/04/12 Arnaud ACKER Mechanical Analysis of RF Network 1/14 CLIC Two-Beam Module type 0.RF Network. Drive-Beam Main-Beam.
1.3GHz Input Coupler for ILC
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
RF DEFLECTORS AT CTF3 BNL/US-LARP/CARE-HHH MINI-WORKSHOP ON CRAB CAVITIES FOR THE LHC Brookhaven National Laboratory, Upton NY Feb 25-26, 2008 Fabio Marcellini.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
Integration of CLIC TBM in CLEX Electronics allocation and cables tracing Wilfrid Farabolini (CEA/IRFU) 16 October 2013.
BINP geometry (= cavity inner dimensions which define the boundary) is based on CERN geometry (as of August 4, 2008) with some adjustments made in order.
Plug-compatibility interface for Input Coupler LCWS13-AWG7-SCRF H. Hayano
Detuning of T18 after high power test Jiaru Shi
HLRF R&D Towards the TDR Christopher Nantista ML-SCRF Webex meeting June 29, 2011.
Dmitry Gudkov BE/RF CLIC Module Working Group Test Module Type 1 (LAB). Design and integration. 3D model Ref: ST
C3 CLIC Crab Cavity Vasim Khan WG damping Mode # Fsyn (GHz) Fsyn (GHz) H-H B.C.E-H.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
Time Varying Structural Behaviour of the PETS “On-Off” mechanism piston movement impact Riku Raatikainen
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
Slide 1 Insert your own content.. Slide 2 Insert your own content.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
CLIC Frequency Multiplication System aka Combiner Rings Piotr Skowronski Caterina Biscari Javier Barranco 21 Oct IWLC 2010.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
V. Paramonov, on behalf INR team.
Re-entrant BPM R&D for ILC Main Linac
Stéphane Rey* - BE/RF Luca Timeo - BE/RF Ben Woolley - BE/RF
X-band high-power variable RF splitter
An X-band system for phase space linearisation on CLARA
TESLA Damping Ring: Injection/Extraction Schemes with RF Deflectors
10 MHz amplifier status G. Favia
Physics design on Injector-1 RFQ
12 GHz High Power RF components requirements for CEA activities
List of changes and improvements for the next generation CLIC module
Summary of the test structure design
F.Marcellini, D.Alesini, A.Ghigo
Installation plan for LAB modules
Update of CLIC accelerating structure design
CEPC RF Power Sources System
Slide 1 Insert your own content.. Slide 1 Insert your own content.
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini

Dmitry Gudkov Contents Problem description Confirmation of the problem existence Possible solutions Ongoing and future actions

Dmitry Gudkov Problem description The problem was presented by Wilfrid during the CLIC meeting on 16-Dec-2014 Slides by W. Farabolini:

Dmitry Gudkov Confirmation of the problem existence The feasibility of a phase ~ 180 o shift have been investigated using the existing waveguide network (not installed on the TBM): -2 ports network analyser (Agilent) is used -Sij parameters at the GHz frequency are measured Output 1Output 2 S12 phase [ o ] S12 amplitude [dB] S11 [dB]-35.8 S22 [dB] The phase difference between the hybrid output 1 and output 2 is 91.8 o

Dmitry Gudkov Confirmation of the problem existence Distance between the input of the first AS and second AS in the SAS is which corresponds to 9 and ¾ (9.75) times the bunch spacing at GHz free space wavelength (25 mm); The RF phase at the second structure input must be -270 deg. or + 90 o from the RF phase at the first structure input; To obtain this phase the output #1 of the hybrid coupler must feed the 2 nd structure; However in the current installation the hybrid is turned and the output #1 feeds the 1 st structure.

Dmitry Gudkov Possible solutions Solution 1: Squeezing waveguide dimensions Attempt to obtain a phase shift of 180 o by squeezing existing piece of the waveguide network; The test was performed on the H-bent waveguide Result: The expected phase shift is accompanied by a large increase of the S11 and S22 reflections (- 17 dB for a phase shift of 56 o ): Evolution of phase shift (blue) and reflection (red) during waveguide squeezing It is not likely to fulfil the required 180 o phase shift; Method can be used for final phase adjustment on a range of 15 o approximately.

Dmitry Gudkov Possible solutions Solution 2: Additional waveguide segment for phase compensation Bending of distribution waveguides to allow spacer insertion; Spacer manufacturing and installation. Result: Sij parameters remain very acceptable: Preliminary bending was performed: deformedOutput 1Output 2 S12 phase [deg] S21 [dB] S11 [dB] S22 [dB] non-deformedOutput 1Output 2 S12 phase [deg] S21 [dB] S11 [dB] S22 [dB] The phase shift due to the deformation is minor (about 1 deg). 2 outputs of this non-deformed waveguide have a difference of phase of 17 deg. Such a difference of phase can be fixed by squeezing the waveguide.

Dmitry Gudkov Ongoing and future actions 1. Spacers design and manufacturing: Spacer Type 1: Copper part, works as big gasket Spacer Type 2: 2-sided CLIC RF vacuum flange 2. Accurate phase control will require many RF network measures during the installation and can be achieved by a limited squeeze of the waveguide and/or by flange torque control.