SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.

Slides:



Advertisements
Similar presentations
Eric Montesinos LIU-SPS coordination meeting 23rd May 2014
Advertisements

LHC Inject or Upgra de SPS 200 MHz SPS 800 MHz RF Power upgrade Progress report April 2014 Eric Montesinos LIU-SPS meeting, 30 April 2014.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Anders Sunesson RF Group ESS Accelerator Division
1 1. Some recent views ( ) 2 Linac tunnel
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
High Order Mode Suppressors (HOMS) for SPS TWC200 (Sébastien Calvo, David Bastard) 25 November 2015 LIU-SPS Coordination Meeting.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
LIU-SPS RF Power upgrade | 09 December 2015.
SPS point 3 New RF building LIU-SPS-200 MHz Power Upgrade April 19, 2011Eric Montesinos / CERN-BE-RF-SR.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
LIU budget cuts – SPS savings? First brainstorming discussions!!! BG 30/4/14.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
SPS point 3 LSS3 rearrangement LIU-SPS-200 MHz Power Upgrade May 26, 2011Eric Montesinos / CERN-BE-RF-SR.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
WP High Beta Cavities Delivery
Demineralised water cooling system
YETS & LS2 Works EN-EL / Power distribution
CC LLRF SM18 test plan and BA6 infrastructure
Framework Schedule from EYETS 2016 to LS2
CBETA Technical Review
SPS LS1 Planning meeting (N019) 04/09/13
Brief Status SPS Prototype PSB Prototype Installed in LS1
LIU – SPS Low level RF Updates and schedule G. Hagmann,
CSP 25th November 2010 Technical agreement number 3: overview
LIU Wire Scanner Milestones June 2017
LIU – EVM status and next steps
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
EN 4946 – Refurbishment of Electrical Substations
LIU and TE/ABT/PPE activities
YETS & LS2 Works EN-EL / Power distribution
Status with crucial LSS5 kicker transmission line cables
East Hall under construction
RF Status 1 4 High Power Amplifier circuits available CERN(2)
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
RF systems introduction
HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian
ESS Bilbao RF Systems Overview Pedro J. González
Status and New Developments of ALBA RF Systems
Krzysztof Czuba ESS LLRF Quarterly Meeting
Overall time schedule of SRF activities
Status of the ESS High Power RF Systems
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Status and New Developments of ALBA RF Systems
LIU-SPS review for BI (no BWS)
East Hall under construction
East Area Renovation Supply of control rooms b.157
Presentation transcript:

SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012

Amplifiers Drivers (SSA): MS completed : 17 companies selected  TS under writing, to be sent out October 2012 FC June 2013 Finals (SSA or Tetrodes): MS completed : 7 companies selected TS (international), to be send out December 2012 FC September 2013 Combiners (3 dB above 100 kW) After Finals have been selected MS + IT 2014 FC 2014 Transmission lines (coaxial, 345 mm outer) Same as Combiner 15 August 20122LIU SPS RF Drivers 16 SSA Final 16 PAs 3 dB combiners and power loads 120 m and 180 m Coaxial lines To cavity input 120 m away From Beam Control 1/16 splitter

July 2012 Amplifiers Schedule 23 May 20123LIU SPS RF October IT sent December IT closed March Company selected June FC Order placed September Design Report Review IT : Invitation to Tenders FC : CERN Finance Committee FAT : Factory Acceptance Tests CERN AT : CERN Acceptance Tests LD Tests : Long duration tests : Long Technical Stop, No beams 30 th June First Series FAT December Pre-series FAT September CERN approval for Series Production (after LD tests) March CERN AT December Last Series CERN AT Decmeber IT sent March IT closed June Company selected September FC Order placed December Design Report Review December First Series FAT September CERN AT March CERN approval for Series Production (after LD tests) June Pre-series FAT December Last Series CERN AT Drivers Finals

New BAF3 RF building Building BAF3 : Integration studies completed Enquiry ‘Etude Genie Civil’ sent out  Results expected soon Start construction end Building ready mid-2015 all inclusive 15 August 20124LIU SPS RF

LSS3 rearrangement LS1 15 August 20125LIU SPS RF HBW kicker BPWA: 319 to AEWB: 319 To During LS1: not a lot is possible Only HBW Damper will be implemented BPWA and AEWB new locations have been validated ( RF + optic + vacuum + cables + transport )  ECR to be written  Not validated yet in PLAN (IMPACT)

New Schedule 15 August 20126LIU SPS RF Studies Tendering Construction Installation Commissioning Start up 2018 Studies Construction HBW (kicker and Pickup) New power couplers Cavities pickups vacuum CV, EL Studies Authorizations Construction Services (CV, EL)Startup Spare sections LLRF Design and proto LLRF Tests LLRF Series New RF Building LSS3 Tunnel Integration New RF Power Amplifiers and LLRF 6 months cavities re-arrangement 2 months RF Power conditioning 4 months LLRF commissioning Coaxial Lines

New Spending profile 23 May 20127LIU SPS RF Item LS LS2 Total Building Civil Engineering (Natacha) Basement 4000 CHF/m 2 First floor 2000 CHF/m ’0002’800 4’500 Building Ventilation (Mauro) ’000 Electrical Network High Power (Joel) Study, documentations, HV transformers, cabling, accessories First RF Power Amplifier (all inclusive) 1100 kW x 7.5 CHF/W (based on 800 MHz 2010 prices) ’4503’ ’500 Second RF Power Amplifier1100 kW x 7.5 CHF/W 1’5004’0001’500 7’000 Coaxial lines2 x 25 x 6 m x 6500 CHF/6m Cavities modifications4 x 150 kCHF + 2 x 100 kCHF Main power Couplers10 x 100 kCHF ’000 Beam Control2 x 700 kCHF ’400 Total500 1’60010’0007’0005’4001’50026’500 kCHF Red : initial profile Blue : New profile

800 MHz New IOTs amplifiers : Contract signed Series delivery will be from May to October 2013 Commissioning finished by end August 20128LIU SPS RF Launched : Additional antennas construction New RF power coupler design Renovation of cavity controller To be done : RF power circulator tests New LLRF

THANK YOU FOR YOUR ATTENTION!