Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.

Slides:



Advertisements
Similar presentations
An SiPM Based Readout for the sPHENIX Calorimeters Eric J. Mannel IEEE NSS/MIC October 30, 2013.
Advertisements

3 Oct Cost and Schedule Update Craig Ogilvie, Iowa State University Analysis of system risks Update schedule  Critical path.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
FVTX Power and cabling – a work-in-progress Task 1.0 – Pre-populate the Racks (Boose/Lenz/Jimmy) Low Voltage Racks2 (on order) Bias Voltage Rack1 (shared.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Todd Moore for the DES CollaborationApril 3 rd, Quick Summary of Noise Test Results. Noise test hardware & software setup. Earth grounding/shielding.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
Columbia University IN THE CITY OF NEW YORK ROC3' / preproduction ROC Design Status E.J. Mannel StriPixel Review October 1, 2008.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
Silicon Stripixel Detector Status Rachid Nouicer Brookhaven National Laboratory (BNL) DOE Review of the PHENIX VTX Detector, June 2 nd, Executive.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Craig Ogilvie Strip FEE electronics that are common between stripixel or conventional sensor choice Stripixel tests/plans to establish manufacturability.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Columbia University IN THE CITY OF NEW YORK FVTX Electronics Oversight and Integration Eric J. Mannel Columbia University.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Atsushi Taketani 2005/06/03 VTX meeting 1 PIXEL BUS status 1.Circuit design 2.Design rule and design 3.Schedule.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
T1 Electronic status Conclusions Electronics Cards:
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Maki KUROSAWA VTX Group 2014 Feb 20
DCM II DCM II system Status Chain test Schedule.
Presentation transcript:

Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 2 Electronics Integration Tasks System Testing FNAL chain test complete Power and Grounding V1 plan complete V2 plan in progress (75%) Power systems- Evaluation Bias system (100%) Low Voltage (40%) Purchasing (10%)

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 3 Electronics Integration Tasks Slow Control Pixel (70%) Stripixel (10%) Power (50%) Rack Allocation and Cable Plan In progress (80%) Design and Safety Reviews In progress (60%) DCM-2 Interface In progress (40%)

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 4 System Chain Tests FNAL T-984 (E.J. Mannel Spokesperson) Conducted at the FNAL M-Test Beam Facility August 17-28, GeV proton beam, ~ 4kHz 3 Pixel ½ ladders with PHENIX DAQ System (Full chain test with pixel system) 3 Stripixel sensor modules with stand-alone readout system Data collection over ~5 days

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 5 System Chain Tests Results reported by A. Taketani (pixel) and R. Nouicer (stripixel) Successfully ran both systems in close proximity to each other. Measured: Noise rates (pixel) Signal:Noise ratios (stripixel) Efficiencies (pixels/stripixels) Charge sharing Tests were successfully completed.

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 6 Power and Ground Plan Common plan for both the VTX and FVTX systems. V1 plan completed and documented on VTX/FVTX Twiki V2 plan is under developement. Plan Highlights: VTX and FVTX isolated from each other and other PHENIX systems Star ground plan Single point connection to PHENIX clean ground Flexibility in location of ground connections

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 7 Power and Ground Plan Plan Highlights Continued: Shielding around beam pipe Exterior shielding around VTX/FVTX enclosure Optional interior shielding between subsystems Optical connections to Rack Room/DAQ Independent floating bias supplies Segregated common supplies for low voltage

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 8 Power and Ground StriPixel Subsystem FVTX North FVTX South Beam Pipe Shield Pixel Subsystem Space Frame PHENIX Clean Ground Floating Returns StriPixel Power FVTX N Power FVTX S Power Pixel Power Safety Ground Magnet Bridge Fiber Optic PIXEL FEMs StripPixel FEMs FVTX FEMs RackRoom VTX/FVTX Global Power and Ground Plane

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 9 Low Voltage Power Use new PHENIX Standard Low Voltage System Based on Vicor MegPak modules Distribution Modules: 10 channels common voltage/return Up to 10 Amps/channel Individual channel Switching Voltage and current monitoring Design completed, testing in progress

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 10 Pixel Low Voltage Distribution Pixel Bus 1 Pixel Bus 2 Pixel Bus 3 Pixel Bus 4 SPIRO 4 SPIRO 3 SPIRO 5 SPIRO 2 SPIRO 1 Pixel Bus 5 SPIRO Module 5V-4A per channel Pixel Module 3.5V-4A per channel

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 11 PHENIX Low Voltage Module Design is complete Boards available for evaluation and testing Evaluation crate being installed in Chemistry lab Will test with stripixel system in June

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 12 Bias Supply Bias supply from Wiener/ISEG selected Single channel floating bias supplies Pixel 0-50V (60 channels) Stripixel 0-250V (40 channels) Separate crates for pixel and stripixel systems Performance testing done Mar-May SBU Integration testing done July-Aug 2008 Integration testing by A. Hulsebus (ISU) and PHENIX ONCS group Comment from PHENIX ONCS group- “System easily integrated into PHENIX”

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 13 Wiener/ISEG System Control module SNMP, tested under LINUX and fully functional. 16 channels per module 4 modules per crate. 2 crates required for VTX 7 modules (4 pixel, 3 stripixel required

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 14 Wiener/ISEG System System tested Valid quote in hand 12 week delivery Reviewing quote Anticipate PO will be issued in June 2009 System available for ladder testing Fall 2009

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 15 Slow Control Discussions with PHENIX ONCS group (M. Purschke, E. Desmond) First meeting in Sept 2007 Discussion of overall design Pixel Requirements Pixel slow control N. Apadula (SBU) primary programmer Developing code for PHENIX On-line 70% complete

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 16 Slow Control Stripixel Slow Control Standalone sytem working: A. Dion (ISU), A. Enokizono (ORNL) Discussions with PHENIXS ONCS group Mar 2009 Starting work on system to interface with PHENIX On- line system (A. Dion, A. Enokizono)

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 17 Slow Control Bias Voltage Bias Voltage evaluation system in summer of 2008, C. Pancake (SBU) Control routines for system developed June-Aug 2008, A. Hulsebus (ISU) GUI development, Summer 2009, A. Hulsebus (ISU) Low Voltage Interface routines exist GUI development, Summer 2009, A. Hulsebus (ISU)

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 18 Rack Allocation and Cabling Done in conjunction with other upgrades Magnet bridge- power supplies Rack room- FEMs/DCMs Sufficient space is` available for all systems Cable routing is being developed (June 09)

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 19 Design and Safety Reviews Continuing to have regular design reviews July 2007 ROC-2 Review Sept 2007 SPIRO preproduction review Nov 2007 SPIRO preproduction review-2 Dec 2007 PIXEL Bus preproduction review Dec 2007 PIXEL Bus extender preproduction review ROC-3 Performance review, Oct 2008 Pixel FEM production review, Dec 2008

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 20 Design and Safety Reviews Pending review Combined VTX/FVTX Mechanical/Electrical Safety review June 11, 2009 Stripixel Readout review, planning in progress, June Stripixel production reviews- RCC, LDTB, DIB/CIB Fall 2009 Final Safety Review- TBD

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 21 DCM-2 Interface between FEMs and PHENIX DAQ Consists of: Crate Controller Module DCM-2 module: 8 Fiber channels/module JSEB-2: Interface to Eventbuilder DCM-2 8/10 bit encoding, 1.6 Gbps. Optical interface complete. Implemented as daughter board. Available for testing FEM interface DCM-2 R&D is off-project

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 22 DCM-2 Optical interface implemented as FE-2 daughter board, and used in FNAL T- 984 test beam, Aug 2008 JSEB-2 Prototype complete Prototype layout of DCM-2, Controller and backplane nearing completion Prototype Fab: July-August 2009 Testing Start: Sept 2009 Production Fab Start: Dec-2009

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 23 Electronics Integration Tasks System Testing FNAL chain test complete Power and Grounding V1 plan complete V2 plan in progress (75%) Power systems- Evaluation Bias (100%) Low Voltage (40%) Purchasing (10%)

Columbia University IN THE CITY OF NEW YORK 06/02/2009 Eric J. Mannel 24 Electronics Integration Tasks Slow Control Pixel (70%) Stripixel (10%) Power (50%) Rack Allocation and Cable Plan In progress (80%) Design and Safety Reviews In progress (60%) DCM-2 Interface In progress (40%) Does not impact FEM development