20 February 2008 LHCC Status Report J. Schukraft ALICE Status Report to LHCC February 2008 Collaboration News Project Status  Production (TOF, TRD, PHOS,

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
JWG, 14 October, 2009, Vladislav Manko Status of work and plans of the Russian group in the ALICE Collaboration as of October, 2009.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
DCal Meeting
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
First Physics at the LHC ALICE Bjørn S. Nilsen Creighton University.
ALICE DAQ Plans for 2006 Procurement, Installation, Commissioning P. VANDE VYVRE – CERN/PH for LHC DAQ Club - CERN - May 2006.
October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
1 Responsibilities & Planning DCS WS L.Jirdén.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
1 CERN related research program in Nuclear Physics High energy nuclear physics –ALICE experiment »Installation and Commissioning »Data taking.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
15 April th ALICE RRB J. Schukraft 24 th ALICE RRB Collaboration News Project Status  Production (TOF, TRD, PHOS, PMD)  Installation  Commissioning.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
The ALICE Experiment at the CERN LHC P. Kuijer for the Alice collaboration ICHEP 2002.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  continuing well, approx 2-4 month delay in some areas  NEW schedule:
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
MICE CMPB Alain Blondel 1 Highlights on MICE.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
28 April th ALICE RRB J. Schukraft 16th ALICE RRB Collaboration Status Project Status  Integration, large structures  Detectors (selection) 
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
27 Oct th ALICE RRB J. Schukraft 17th ALICE RRB Collaboration Status Project Status  Integration, large structures  Detectors (selection)  Planning,
17 December 2009J. Schukraft1 First Physics at the LHC seen through the eyes of ALICE.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
(Alice COsmic Ray Detector) Status Report
DCS Status and Amanda News
25th ALICE RRB J. Schukraft
ALICE Status Report to LHCC September 2008
Introduction Status before the 2009 run Results from the 2009 run
LHC experiments Requirements and Concepts ALICE
ALICE Commissioning: Getting ready for Physics
ALICE Status 4th CERN-Korea meeting
ALICE – First paper.
IEEE NPSS Real Time Conference 2009
Commissioning of the ALICE HLT, TPC and PHOS systems
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
ALICE upgrade plans Paolo Giubellino LHCC Upgrades
Experience between AMORE/Offline and sub-systems
Commissioning of the ALICE-PHOS trigger
Presentation transcript:

20 February 2008 LHCC Status Report J. Schukraft ALICE Status Report to LHCC February 2008 Collaboration News Project Status  Production (TOF, TRD, PHOS, PMD)  Installation  Commissioning

20/2/2008 LHCC Status Report J. Schukraft 2 Collaboration News New Institutes joining in 2007  LPSC Grenoble (associate -> full member) EMCAL (construction)  California Polytechnic State Univ. (USA, NSF funded)EMCAL (software)  Applying:  Yonsei Univ., Pusan Univ.(Korea), PUCP (Peru)  several additional US institutes (Houston, Tennessee, Purdue) Elections/Nominations  CB chair: L. Riccati (Torino) reelected for 3 years  Technical Coordination: L. Leistam (CERN) for 3 years  Deputy TC: W. Riegler (CERN) from  C. Fabjan retires in 2008, was TC since February 2001  Run Coordinator: P. Kuijer (NIKHEF) for 1 year  Spokesperson elections will be held in July 2008 ALICE detector paper submitted to JINST 8 Feb. 2008

20/2/2008 LHCC Status Report J. Schukraft 3 Funding News EMCAL calorimeter for jet physics  France: project approved by CNRS in March 2007 (ca 1 M Euro)  Italy: project continuation funded for 2008 (INFN Sept 2007)  US: DOE CD2/3 review in December 2007  approved and funded (ca 13.5 M US$)  production schedule driven by funding profile (trying to accelerate by 1 year)  TDR planned for mid 2008 PHOS modules 4, 5  electronics and APD’s are funded (China, Japan)  crystal & mechanics funding requested via Kurchatov Inst. (2008 – 2010)

20/2/2008 LHCC Status Report J. Schukraft 4 ALICE Detector TPC PHOS Muon arm TOF TRD HMPID PMD ITS ACCORDE

20/2/2008 LHCC Status Report J. Schukraft 5 Planning & Schedule Changes since early 2007  end 2007 run at 900 GeV has been replaced by mid 2008 run at full energy Additional time used for:  repair of pixel detector (6 half staves damaged in March 2007)  production of further modules:  TOF (7->18)  TRD (2->4) (only 2 will be installed)  PHOS (1->3) (only 1 will be installed)  take more time for testing and pre-commissioning of individual systems  add more cosmic running for global commissioning and initial alignment Expected start-up configuration April 2008  complete: ITS, TPC, TOF, HMPID, muon arm, FMD, trigger dets (V0, T0,ZDC, Acorde),..  partially complete: PHOS(1/5), TRD (2/18), PMD (1/48), DAQ/HLT (20-30%), Beyond 2008  complete DAQ/HLT capacity (shifted from 2008 to 2009) in line with expected LHC running  complete modular detectors: PMD (2008), TRD (2009), PHOS (2010), EMCAL (2011)

20/2/2008 LHCC Status Report J. Schukraft 6 TOF Production  module production : 100 %  Electronic r/o cards: % Assembly & Installation  Supermodule assembly : 15 SMs assembled  10 SMs installed Schedule  TOF production complete: Mar 2008  installation complete: April 2008 TOF SuperModules in storage

7 10 SM already installed Last 8 SM will be installed in March/April SMs commissioned and readout during Dec. ’07 cosmic run SMs installed in Nov./Dec. ’07 and currently under commissioning SMs installed in Jan ’08 Status of TOF SuperModules installation : 16 January 2008

20/2/2008 LHCC Status Report J. Schukraft 8 TRD (fully funded since 2006) Chambers: 430 chambers done (>77% completed; expect to be done by Oct. 08) GSI, U. Hd, U. Frankfurt, JINR, Bucharest Electronics:  R/O board & MCM production transferred to industry 2nd half of production being optimized for yield  TRD pre-trigger: partially installed - under test  GTU fully implemented and debugged Assembly  2 super modules installed, 2 more done; end of assembly March 09  1 SM fully tested at CERN in PS beam  noise performance identical to lab test noise performance during cosmic run with B-field w/o B-field Excessive gas leakage discovered during SM test  TRD chambers have been tested for diffusive 0 2 leaks and are within specs  however, large viscous leaks found during supermodule beam test in PS  leaks localized and all chambers will be repaired (Xenon is expensive !)  consequence: only 2 (repaired) SM’s will be installed

20/2/2008 LHCC Status Report J. Schukraft 9 Photon Spectrometer (PHOS) Detector status:  Module 1: ready since mid 2006, tested & calibrated with cosmics and test beam  assembly & operation experience => improved mechanical/electrical design  Modules 2,3: all elements (crystal, mechanics, electronics) produced, most at CERN  Cooling plant : produced and commissioned, to be installed in April  Condensation observed during warm-up after 2 month cold operation of Mod #1 end 2007  flushing with dry nitrogen insufficient => design new airtight enclose & feedthroughs  first casing ready only end of April => too late for 2008 installation Revised installation schedule  1 module installed in April  system commissioning & pp physics  operated at C,  to be upgraded during first long shutdown  2 modules completed and calibrated during 2008 for installation in first long shutdown PHOS module # 2

20/2/2008 LHCC Status Report J. Schukraft 10 PMD Detector production  all modules produced, tested, at CERN  FEE all produced, mostly at CERN  FRT board tests ongoing (quality issues)  support and Pb converter ready Installation postponed  long term tests show that some MANAS FEE gets damaged by repeated sparks  implement additional protection diodes  delivery delays => not ready by April  Install 1 module for 2008 (commissioning)  rest in first long shutdown (~2 weeks)  PMD needed mainly for heavy ion physics PMD chambers support, Pb converter

20/2/2008 LHCC Status Report J. Schukraft 11 Installation Milestones DetectorStartFinish Muon detector installation /commissioningApr 2006April 2008 Initial TPC installation + ITS rails ITS Barrel (SDD,SSD) + Vacuum (central Be chamber) + Bake-Out FMD/V0/T0 (C side) Commissioning TPC + services SPD installation & integration with ITS barrel FMD2 installation ITS (+ cooling) commissioning TPC to IP, ITS tests, Service Chariot, Beampipe Fixation TRD/ 3 TOF installation EMCAL Frame Miniframe (services A side) TOF/ 1 TRD Magnet Test + Global Commissioning V0-A/T0-A, TOF, cabling, magnet test L3January 2008 mid Feb 2008

20/2/2008 LHCC Status Report J. Schukraft 12 Phase 3 Installation Forward detectors(T0/V0/FMD) + ITS + TPC  Installation - testing – pre-commissioning  most difficult part of ALICE installation  ITS buried deep inside TPC  crowded region with tight clearances  one side blocked by muon absorber  final services on A side unavailable for testing  most delicate: extremely thin & fragile det.  tracking volume < 10% X 0 (0 < r < 2.5 m) equivalent to < 1.5 mm of Copper !!  significant static & dynamic deformations  procedure & tooling was extensively tested  surface mock-up early 2006 ITS V0/T0/FMD Muon absorber C A

13 TPC transport (January 2007) < 100 m horizontal, < 100 m vertical in 2 days = 4 m/hour Position Monitor

14 SSD/SDD Installation Traversing the TPCBe beam pipe

15 Forward Multiplicity Detector FMD Interaction Trigger (V0) Trigger & Timing (T0) April 2007

16

17 Moving the Pixel Half-Barrels to the IP

18 Installation of top half-barrel Inner layer Outerlayer

19 TPC SSD/SDD SPD Moving of the ITS over the SPD SPD cone SPD barrel

20 SPD inside the ITS Absorber ITS June 2007

21 ITS barrel ready to enter inside TPC September 2007

TPC pos. z [mm] Δ [mm] Beam-pipe sag during TPC movement to IP IP Parking Beampipe Sag (mm) Insertion Extraction Insertion Maximum 2.25mmToday 1.7mm Maximum allowed beam-pipe sag: 3mm = 40N on central support = 15MPa stress Start Monitored with lasers, cameras, strain gauges and optical survey…

23 ITS is lowered by a remote control mechanism and fixed to the TPC Final fixation of the ITS ITS TPC

20/2/2008 LHCC Status Report J. Schukraft 24 Summary ITS Installation went essentially smooth w/o major incident or hick-up  major effort involving many different groups, over several months  lots of smaller problems discovered & solved  cooling commissioning, cable & connector problems, positioning & alignment, software/firmware/hardware bugs, ……. ITS and FWD detectors in good health after installation  SPD: > 99.5% working channels SSD: > 97% working channels  SDD: > 98% working channels FMD: > 99.9% working channels

20/2/2008 LHCC Status Report J. Schukraft 25 Muon Spectrometer Tracking  Installation completed for stations 1, 2, 4, 5 station 3 is 50% complete (access to ST1/2) Trigger  installation complete  commissioning ongoing Stations 1, 2 Stations 4, 5 Position Monitoring System: installed on stations 1 & 2 photogrammetry and survey done under progress on stations 3,4,5

26 Muon spectrometer

20/2/2008 LHCC Status Report J. Schukraft 27 EMCAL support November 2007

20/2/2008 LHCC Status Report J. Schukraft Nov 2007: Descent of the last big structure

29 ZDC’s installed on both sides > 100 m inside the tunnel RA23 Point of concern: Introduction of tertiary collimator TCTVB between IP and ZDC can affect the spectator neutrons acceptance  Possible solutions under study RA27 n-cal p-cal

20/2/2008 LHCC Status Report J. Schukraft 30 Trigger/DAQ/HLT/DCS/ECS Installation of all systems in ‘initial configuration’ essentially complete  20-30% for DAQ/HLT, 100% for Trigger/DCS/ECS  Integration & commissioning of different Control Systems and Detectors

20/2/2008 LHCC Status Report J. Schukraft 31 - DATE V5, DDL SIU + RORC delivered - Detector algorithms framework ready APRIL 07 SPDSPD SSDSSD SDDSDD TPCTPC TRDTRD TOFTOF MUONTKMUONTK MUONTGMUONTG HMPIDHMPID PHOSCPPHOSCP FMDFMD T0T0 V0V0 ZDCZDC PMDPMD ACORDEACORDE EMCALEMCAL Final electronics with DDL & DATE Trigger with LTU and TTC Common Data Header (TRG info) Data format check SOD, EOD Data quality monitor. (MOOD) Detect. Algorithms on monitor servers Detector/DAQ integration - DATE V5, DDL SIU + RORC delivered - Detector algorithms framework ready January 08 SPDSPD SSDSSD SDDSDD TPCTPC TRDTRD TOFTOF MUONTKMUONTK MUONTGMUONTG HMPIDHMPID PHOSCPPHOSCP FMDFMD T0T0 V0V0 ZDCZDC PMDPMD ACORDEACORDE EMCALEMCAL Final electronics with DDL & DATE Trigger with LTU and TTC Common Data Header (TRG info) Data format check SOD, EOD Data quality monitor. (MOOD) Detect. Algorithms in DAQ

20/2/2008 LHCC Status Report J. Schukraft 32 Detector/Trigger integration

33 Detector Control February 07 1 H/W & low level S/W done 2 Basic control with PVSS 3 FSM implemented 4 Configured and ready for operation

20/2/2008 LHCC Status Report J. Schukraft 34 ECS skeleton ready APRIL 07 SPDSPD SSDSSD SDDSDD TPCTPC TRDTRD TOFTOF MUONTKMUONTK MUONTGMUONTG H M PI D PHOSCPPHOSCP FMDFMD T0T0 V0V0 ZDCZDC PMDPMD ACORDEACORDE EMCALEMCAL DCS FSM implemented Calibrations runs defined Calibrations runs implemented in ECS Detect. Algorithms for calibration runs Detector/ECS Integration ECS February 2008 SPDSPD SSDSSD SDDSDD TPCTPC TRDTRD TOFTOF MUONTKMUONTK MUONTGMUONTG HMPIDHMPID PHOSCPPHOSCP FMDFMD T0T0 V0V0 ZDCZDC PMDPMD ACORDEACORDE EMCALEMCAL DCS FSM implemented Calibrations runs defined Calibrations runs implemented in ECS Detect. Algorithms for calibration runs

20/2/2008 LHCC Status Report J. Schukraft 35 Cosmic run December ‘07 Trigger in UX-C area Trigger DAQ and HLT Raw Data ACORDE (Cosmic Trigger) ALICE detectors Trigger input Control Operation from ALICE Control Room Data archive Registration on the GRID

20/2/2008 LHCC Status Report J. Schukraft 36 Cosmic Run 14 detectors could run standalone and in some global runs:  SPD, SSD, SDD, TPC, TRD, TOF, Muon TRK, Muon TRG, HMPID, FMD, V0, T0, ACORDE, ZDC(missing: PHOS/CPV, PMD, EMCAL)  R/O for a subset of the installed detector (limited by services, connections, power supply..) Global runs with multiple detectors (up to 11) :  All with pulser or ACORDE as Trigger detector and the Central Trigger Processor  Event building on several GDCs  Data recording:  ROOT format  Migration to CASTOR 17.5 TB of data  Registration in AliEn 23 k files  Electronic Logbook Magnets  Muon Dipole operated full Field  L3 magnet operated only January 2008

20/2/2008 LHCC Status Report J. Schukraft 37 Standalone runs

20/2/2008 LHCC Status Report J. Schukraft 38 Global Partition during Cosmic Run

20/2/2008 LHCC Status Report J. Schukraft 39 Event Displays TPC Krypton Calibration (February 2008) Muon Tracking Chambers HMPID noise (1000 e)

40 TOF results from the cosmic run, December 2007 (2 S.M. in global partition) ACORDE triggers Random triggers Peak width (  =25 ns) is due to trigger jitter TRIGGER FROM ACORDE! First (out of several) muon track seen by TOF Sector 08, 6 hit strips in external module

20/2/2008 LHCC Status Report J. Schukraft 41 Muon Tracking Commissioning:  Local commissioning with “stand-alone DAQ”:  stations 1, 2 CH5 (station 3), CH7-O (station 4) almost completed  stations 3, 4, 5: read-out difficulties ( connectors !) + noise problems : under investigation  Global ALICE DAQ:  Station 1 + half-station 2: 2 LDC entered the December Cosmic Run  plan: station 1 + full station 2 + part of CH5 (station 3) in February Cosmic Run (3 LDC) CH1bending: pedestal & noiseCH7-O bending: pedestal & noise noise

20/2/2008 LHCC Status Report J. Schukraft 42 Computing Resources  ALICE deficit in 2008/9 (after recent updates of pledges/requirements) ~ 30-40%  Active discussion for the integration of US computing resources into ALICE  Discussions with individual countries to raise their relative contribution usability of available resources now mostly above 90% Commissioning of the Offline successfully started First tracks from real data at P2 reconstructed 24/10/ rd RRB J. Schukraft 42 Computing 2 week global run 17.5TB in 23K files (~0.7 GB/file) 18MB/sec = 1/3 of the p+p rate CCRC’08 ongoing now 130MB/s Data Traffic T0 -> T1’s 18TB Data stored in T0

20/2/2008 LHCC Status Report J. Schukraft 43 Planning 2008 Comissioning runs  Cosmics I (2 weeks, Dec 2007)  local (individual detectors) and global (several detectors) comissioning  Cosmics II (3 weeks, Febr/Mar 2008)  local/global commissioning, first 1 week alignment ‘production’ run (TPC/ITS)  Cosmics III (> 4 weeks, April/March 2008)  global commissioning, alignment production run for all detectors PHASEDetectorStartFinish PHASE 4V0-A/T0-A/TOF/L3 magnet test Cosmic Run II TOF/TRD/PHOS/PMD Cosmic Run III, Mobile shielding, close vacuum Start of beam

20/2/2008 LHCC Status Report J. Schukraft 44 Summary Most of ALICE installed in 2007  delicate TPC/ITS installation took longer than foreseen,  but went essentially without problems  initial detector configuration required for pp in 2008 will be in place by April  including 2 TRD and 1 PHOS module  global commissioning under way  still lots of work ahead ! Looking forward to beam in 2008 !