ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort December, 2001 N. Hartman,

Slides:



Advertisements
Similar presentations
ATLAS Frame PRR 1 W.O. Miller Feb US ATLAS Pixel Detector Global Supports PRR W.O. Miller, R. Smith, W.K. Miller, R. Baer HYTEC G. Gilchriese, E.
Advertisements

ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
M. Gilchriese Evaporative Cooling Tests of Pixel Disk Sectors June 2000 E. Anderssen, M. Gilchriese, F. Goozen, F. McCormack, J. Taylor, T. Weber, J. Wirth.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
ATLAS Pixel Detector October 2001 Pixel Week N. Hartman LBNL 1 PST Design Update PST CDR october 2001.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
Global Supports Update W.O. Miller October 2001 US ATLAS Pixel Detector Global Supports Status W.O. Miller, R. Smith, W.K. Miller, G. Hayman, R. Baer HYTEC.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report September 28, 2000 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber,
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Update February, 2001 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber, F.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
ATLAS Pixel Detector Project N. Hartman LBNL 1 Alexis Smith Intern Progress Report Neal Hartman, March 25, 2003.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
ATLAS Pixel Detector Cooling Services Joining Techniques: Progress Report December 13, 2000 N. Hartman, E. Anderssen, M. Gilchriese, F. Goosen, T. Johnson,
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
Alain Hervé, ILD Workshop, Seoul 17 February 2009, 4365-ILD-T-Coil-Developments.ppt Possible Coil Developments ILD Workshop - SEOUL - 17 February 2009.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
DOE/NSF Review of U.S. ATLAS /March 2001 WBS Pixel Overview and WBS Pixel Mechanics M. G. D. Gilchriese Lawrence Berkeley Laboratory.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
1 Monophase Measurements on Prototype Pixel Structures D. Bintinger, M. Gilchriese, J. Taylor and J. Wirth and contributions from D. Cragg, E. Perrin and.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
M. Gilchriese Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, J. Wirth October 11, 2001.
WELDING TESTS & OTHERS ISSUES SUMMARY
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
M. Gilchriese Phone Meeting December 18, M. Gilchriese 2 PP1 Region Update “Bag” gas barrier Passive insulation? Region for external beam pipe supports?
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
L. M. Pant1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production Validation of RE4 Cu cooling systems for mass production L.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J.
DEVELOPMENT AND FABRICATION OF EXTENDED SPARK PLUG TYPE LEAK DETECTOR (ESPLD) FOR PFBR M.R. JEYAN INSTRUMENTATION DEVELOPMENT AND SERVICES DIVISION FAST.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
Ti/SS transitions A.Basti INFN-PISA*
Cooling loops for prototype Staves
Presentation transcript:

ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort December, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T. Johnson, T. Weber, J. Wirth

ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Current Status Luer Lock leak tests –Initial Al/AL fittings fully Qualified Luer lock demating tests –Al/Al luer locks have not shown binding under even very conservative test conditions Laser Welding –Material problems solved (for 3003 and 1060) –Have successfully welded sector tube with variseal fittings –Must do more tests for higher confidence Other tubing sizes –4 mm, 8 mm, and Capillary tubing have all been obtained in aluminum for testing Fitting Comparisons –Lower Mass fittings have been designed and await fabrication –Both Luer lock and indium, for sector size, in al

ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Fitting Test Specimens – Baseline Luer Lock Luer Lock Pieces (PEEK and Aluminum). Assembled Fitting. PEEK Al

ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Luer Lock Results

ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Joining Methods – Laser Welding

ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Laser Welding Problems Tube Material – Batch 1 –Reported as 3003 AL –Laser Welding very Successful –Later found to be 1060 AL (almost commercially pure) Tube Material – Batch 2 –Ordered 3003 AL – different vendor –Tested as 3003 AL –Would not laser weld (microcracks on cooldown) Tube Material – Batch 3 –Ordered 3003 AL –Material is 1060 Al –Vendor’s source is unreliable, and this will not change

ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Laser Weld Solution Configure joint to favor tube material –Tube material (whether 3003 or 1060) typically has less alloying elements than 6061 –Joint configuration (raising tube) alloys tube to be preferentially melted, increasing its concentration in melt zone –This creates a less alloyed weld region, which is less brittle –Successfully demonstrated Weld Zone Tube melts Into chamfer Old ApproachNew Approach

ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Fitting Comparisons - Mass Fitting Volume Smeared over hoop at radius 210 mm, 50 mm long Reduced Mass Luer and Sector Size Indium Fittings –Designs completed but not yet fabricated –Fittings designed with features for laser welding –Expect delivery of parts in mid-january –Laser welding and testing to be done in february

ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Fitting X-section Comparisons Current Luer DesignNew Luer Design Sector Indium Design Old Variseal Design

ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Upcoming Work Reduced mass luer and indium fittings –Testing to be done in february (as mentioned earlier) Capillary testing –Robustness tests Bend/unbend repetitions Pressure/leak testing (with swage lock connectors) –Laser Welding tests Made in low mass luer or indium fittings Full system prototype –Complete cooling circuit prototype from pp1 to sector –All “real” fittings – all laser welded (including 4/8 mm tubes) –Completed sometime before next summer –Plans to test in marseille with evaporative cooling plant