Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.

Slides:



Advertisements
Similar presentations
IIT NFMCC Meeting ‘06 Recent Optimization Studies of Adiabatic Buncher and Phase Rotator A.Poklonskiy (SPbSU, MSU), D.Neuffer (FNAL) C.Johnstone (FNAL),
Advertisements

1 Neutrino Factory Front End (IDS) -Chicane & Absorber David Neuffer C. Rogers, P. Snopok, C. Yoshikawa, … January 31, 2012.
Bunched-Beam Phase Rotation David Neuffer Fermilab.
Muon Coalescing 101 Chuck Ankenbrandt Chandra Bhat Milorad Popovic Fermilab NFMCC IIT March 14, 2006.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
1 Optimization of baseline front end for a neutrino factory David Neuffer FNAL (August 19, 2009)
1 Neutrino Factory Front End (IDS) and Variations David Neuffer G. Prior, C. Rogers, P. Snopok, C. Yoshikawa, … August 2011 NuFACT99 -Lyon.
Muon Colliders ‘ December 2004 Optimization of adiabatic buncher and phase rotator for Muon Accelerators A.Poklonskiy (SPbSU, MSU), D.Neuffer (FNAL)
Bunched-Beam Phase Rotation- Variation and 0ptimization David Neuffer, A. Poklonskiy Fermilab.
Taylor Models Workhop 20 December 2004 Exploring and optimizing Adiabatic Buncher and Phase Rotator for Neutrino Factory in COSY Infinity A.Poklonskiy.
1 Muon Bunching for a Muon Collider David Neuffer FNAL August 3, 2010.
1 RAL + Front End Studies International Design Study David Neuffer FNAL (January 5, 2009)
1 Front End Studies and Plans David Neuffer FNAL (November 10, 2009)
1 Front End Studies and Plans David Neuffer FNAL (October 27, 2009)
1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.
Μ-Capture, Energy Rotation, Cooling and High-pressure Cavities David Neuffer Fermilab.
1 Energy-Phase Rotation with a proton absorber David Neuffer September 27, 2011.
Simulation Study Results Study: Replace LiH-based cooler with gas-filled transport and rf cavities Results: Beam Cooling is significantly improved. Final.
1 Neutrino Factory Front End (IDS) and Variations David Neuffer November 23, 2010.
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
FFAG Concepts and Studies David Neuffer Fermilab.
ABSTRACT The International Design Study for the Neutrino Factory (IDS- NF) baseline design 1 involves a complex chain of accelerators including a single-pass.
1 Front End Capture/Phase Rotation & Cooling Studies David Neuffer Cary Yoshikawa December 2008.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Muons within Acceleration Acceptance Cuts at End of Transverse Cooling Channel TOWARDS A GLOBAL OPTIMIZATION OF THE MUON ACCELERATOR FRONT END H. K. Sayed,
1 Front End – present status David Neuffer March 31, 2015.
Ajit Kurup, C. Bontoiu, M. Aslaninejad, J. Pozimski, Imperial College London. A.Bogacz, V. S. Morozov, Y.R. Roblin Jefferson Laboratory K. B. Beard, Muons,
Source Group Bethan Dorman Paul Morris Laura Carroll Anthony Green Miriam Dowle Christopher Beach Sazlin Abdul Ghani Nicholas Torr.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
Stephen Brooks Scoping Study meeting, July 2006 Low-Frequency Phase Rotation The UKNF phase rotator evolved from the CERN design –  E reduction occurs.
Stephen Brooks NuFact’06, UC-Irvine, August 2006  Lower-Frequency RF Phase Rotation Techniques for Both Muon Signs.
Quantitative Optimisation Studies of the Muon Front-End for a Neutrino Factory S. J. Brooks, RAL, Chilton, Oxfordshire, U.K. Tracking Code Non-linearised.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer Fermilab.
Bunched-Beam Phase Rotation and FFAG -Factory Injection David Neuffer Fermilab.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer, Andreas Van Ginneken, Daniel Elvira Fermilab.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
Muon cooling with Li lenses and high field solenoids V. Balbekov, MAP Winter Meeting 02/28-03/04, 2011 OUTLINE  Introduction: why the combination of Li.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
1 Muon acceleration - amplitude effects in non-scaling FFAG - Shinji Machida CCLRC/RAL/ASTeC 26 April, ffag/machida_ ppt.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
1 The 325 MHz Solution David Neuffer Fermilab January 15, 2013.
1 Front End for MAP Neutrino Factory/Collider rf considerations David Neuffer May 29, 2014.
1 Front End – present status David Neuffer March 17, 2015.
1 International Design Study Front End & Variations David Neuffer January 2009.
NuFACT06 Summer School -Factory Front End and Cooling David Neuffer f Fermilab.
1 Front End – present status David Neuffer March 3, 2015.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
FFAG Acceleration David Neuffer Fermilab FFAG Workshop ‘03.
Simulating the RFOFO Ring with Geant Amit Klier University of California, Riverside Muon Collaboration Meeting Riverside, January 2004.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
1 Muon Capture for a Muon Collider David Neuffer July 2009.
Adiabatic buncher and (  ) Rotator Exploration & Optimization David Neuffer(FNAL), Alexey Poklonskiy (FNAL, MSU, SPSU)
Pros and Cons of Existing Cooling Schemes David Neuffer Fermilab.
ICHEP Conference Amsterdam 31st International Conference on High Energy Physics 24  31 July 2002 Gail G. Hanson University of California, Riverside For.
Final Cooling Options For a High- Luminosity High-Energy Lepton Collider David Neuffer FNAL Don Summers, T. Hart, … U. Miss.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
1 Front End – gas-filled cavities David Neuffer May 19, 2015.
1 Bunch Recombiner for a μ + μ - Collider Cooling Scenario David Neuffer FNAL (July 7, 2010)
Muons, Inc. 3/5/2012MAP Collab. Meeting at SLAC Cary Y. Yoshikawa 1 Bunch Coalescing in a Helical Channel* Cary Yoshikawa Chuck Ankenbrandt Dave Neuffer.
1 Front End – present status David Neuffer December 4, 2014.
+-- Collider Front end- Balbekov version
David Neuffer Cary Yoshikawa March 2009
The Accelerator Complex from the International Design Study
Final Cooling For a High-Luminosity High-Energy Lepton Collider
Presentation transcript:

Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab

2 Outline  Introduction  Study 2 scenario  Induction linac phase rotation MHz buncher  “High-frequency” Buncher and  Rotation  Concept  1-D, 3-D simulations  Cost guesstimates …  Continuing Studies …  Variations  Matching, Optimization  Study 3  For FFAG -Factory injection ??  Lower frequencies, larger energy spreads ??

3 Neutrino Factory Baseline Design  Feasible, but expensive  Find ways to reduce costs …

4 Adiabatic buncher + Vernier  Rotation  Drift (90m)   decay; beam develops  correlation  Buncher (60m) (~333  200MHz)  Forms beam into string of bunches  Rotation (~10m) (~200MHz)  Lines bunches into equal energies  Cooler (~100m long) (~200 MHz)  fixed frequency transverse cooling system Replaces Induction Linacs with medium- frequency rf (~200MHz) !

5 Longitudinal Motion (1-D simulations) DriftBunch  E rotate Cool System would capture both signs (  +,  - ) !!

6 Buncher overview  Adiabatic buncher  Set T 0,  :  125 MeV/c, 0.01  In buncher:  Match to rf =1.5m at end:  zero-phase with 1/  at integer intervals of  :  Adiabatically increase rf gradient: rf : 0.90  1.5m

7 “Vernier”  Rotation  At end of buncher, choose:  Fixed-energy particle T 0  Second reference bunch T N  Vernier offset   Example:  T 0 = 125 MeV  Choose N= 10,  =0.1 –T 10 starts at MeV  Along rotator, keep reference particles at (N +  ) rf spacing  10 = 36° at  =0.1  Bunch centroids change:  Use E rf = 10MV/m; L Rt =8.74m  High gradient not needed …  Bunches rotate to ~equal energies. rf :  1.517m in rotation; rf =  ct/10 at end ( rf  1.532m) Nonlinearities cancel: T(1/  ) ; Sin(  )

8 Key Parameters  General  Muon capture momentum (200MeV/c?) 400MeV/c?  Baseline rf frequency (200MHz)  Drift  Length L D  Buncher – Length (L B )  Gradient, ramp V B (linear OK)  Final Rf frequency (L D + L B )  (1/  ) = RF  Phase Rotator- Length (L B )  Vernier offset : N B,  V  Rf gradient V R  Cooling channel / Accelerator ???

9 Next step: match into cooling channel !  Need to design a new cooling channel, matched to bunched/rotated beam  Do not (yet) have redesigned/matched cooling channel  Use (for initial tries):  ICOOL beam from end of AVG simulations  Study 2 cooling channel  Direct transfer of beam (no matching section)

10 Results (~ICOOL)  In first ~10m, 40% of  ’s from buncher are lost,    0.020m     0.012m  Remaining  ’s continue down channel and are cooled and scraped,    ~0.0022m, similar to Study 2 simulation.  Best energy, phase gives ~0.22  ’s /24 GeV p  Study 2 baseline ICOOL results is ~0.23  ’s/p GeV m

11 Caveats: Not properly matched  This is not the way to design a neutrino factory  Not properly matched in phase space  Cooling channel acceptance is too small (add precooler ?)  Correlation factors “wrong”  “Cooling” channel collimates as much as it cools …

12 Shorter bunch train (for Ring Cooler ?)  Ring Cooler requires shorter bunch train for single-turn injection – ~30m?  200MHz example  –reduce drift to 20m (from 90)  -reduce buncher to 20m  Rotator is ~12m  ~85% within <~30m  Total rf voltage required is about the same (~200MV)  RFOFO cooler wants 12m bunch train !!! “Long” Bunch “Short” Bunch  2 scale

13 “Match” into “cooling channel”  Place beam output into Study 2 cooling channel  No “matching”  Long bunch case accepts ~0.20  /p  Short bunch case accepts ~0.145  /p  (Study 2 example is 0.23  /p in these units)

14 New Cooling Channel needed  Need initial cooling channel  (Cool  T from 0.02m to 0.01m)  Longitudinal cooling ?  Examples  Solenoidal precooler (Palmer)  “Quad-channel” precooler  3-D precooler  Match into precooler  First try unmatched

15 To do  Move to more realistic models  Continuous changes in rf frequencies to stepped changes …  3-D fields (not solenoid + sinusoidal rf)  Match into realistic cooling channels …  Estimate/Optimize Cost /performance

16 Comment on costs

17 Variations/ Optimizations …  Many possible variations and optimizations  But possible variations will be reduced after design/construction  Shorter bunch trains ??  For ring Coolers ?  Other frequencies ??  200 MHz(FNAL)  88 MHz ?? (CERN)  ??? ~44MHz  Cost/performance optima for neutrino factory (Study 3?)  Collider ?? both signs (  +,  - ) !  Graduate students (MSU) (Alexiy Poklonskiy, Pavel Snopok) will study these variations; optimizations; etc…

18 FFAG -Factory injection  Baseline scenario is single bunch injection without  -E rotation or bunch formation  Capture is not matched to beam phase-space  Capture is centered at higher energy than Study 2  Requires very low-frequency bucket (~25 MHz or less)  Rf Gradient is ~1 MV/m (or less)  Can injection use buncher-rotator methods to improve acceptance, increase rf gradient ? Capture is ± 150MeV, ± 12 ns

19 Bunch sizes for various rf scenarios CaseRf frequency  E (MeV) (±)  z (m) (±)(eV-s) JNF (~300MeV) 5 MHz ?? (~1.0m  rms ) ~Study 2 (~125MeV) 200MHz (~0.04m) 250 MeV200MHz (~0.08m) 125 MeV100MHz (~0.08m) 250 MeV100MHz (~0.16m) 125 MeV50MHz (~0.16m) 250 MeV50MHz (~0.32m)

20 FFAG-influenced variation – 100MHz  100 MHz example  90m drift; 60m buncher, 40m rf rotation  Capture centered at 250 MeV  Higher energy capture means shorter bunch train  Beam at 250MeV ± 200MeV accepted into 100 MHz buncher  Bunch widths < ±100 MeV  Uses ~ 400MV of rf

21 ~50 MHz variations Example I (250 MeV) oUses ~90m drift + 100m 100  50 MHz rf (<4MV/m) ~300MV total  Captures 250  200 MeV  ’s into 250 MeV bunches with ±80 MeV widths Example II (125 MeV) oUses ~60m drift + 90m 100  50 MHz rf (<3MV/m) ~180MV total  Captures 125  100 MeV  ’s into 125 MeV bunches with ±40 MeV widths

22 Summary  High-frequency Buncher and  E Rotator simpler and cheaper than induction linac system  Performance as good (or almost …) as study 2, But  System will capture both signs (  +,  - ) ! (Twice as good ??)  Method could (?) be baseline capture and phase- energy rotation for any neutrino factory … (FFAG) To do:  Complete simulations with matched cooling channel!  Optimizations, Best FFAG Scenario, …

23 Last slide

24 Compare with Study II (Capture + Cooling) x: –20 to 100m; y: 0 to 400 MeV

25 ICOOL simulation –Buncher, , Cool

26 Study 2 system  Drift to develop Energy- phase correlation  Accelerate tail; decelerate head of beam (280m induction linacs (!))  Bunch at 200 MHz  Inject into 200 MHz cooling system