10-05-05 Haixin Huang AGS Cold Snake: Status and Plans.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
The Siberian Snake Kai Hock Liverpool Group Meeting, 12 August 2008.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
11/18/2003Haixin Huang1 RHIC Polarimeter Status All targets and Si detectors have been installed at the end of October. The targets survived the vacuum.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
DIS 2006 Tsukuba, April 21, 2006 Alessandro Bravar Proton Polarimetry at RHIC Alekseev, A. Bravar, G. Bunce, S. Dhawan, R. Gill, W. Haeberli, H. Huang,
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn,
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Simulation of Spin Interference and Echo Effect Abstract Successively jumping across a depolarization resonance twice produces interesting spin dynamics.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
Compensation of Detector Solenoid G.H. Wei, V.S. Morozov, Fanglei Lin JLEIC Collaboration Meeting Spring, 2016.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Beam test of slow extraction from the ESR
Large Booster and Collider Ring
Possibility for polarized beam at J-PARC Summary of Satellite Workshop on Polarized Proton Beam at J-PARC Satellite Workshop Program: Overview of the status.
eRHIC with Self-Polarizing Electron Ring
Progress of SPPC lattice design
Multiple Partial Siberian Snakes
Collider Ring Optics & Related Issues
V12 work needed (some in progress):
Spin Transparency Study and Test
Update on MEIC Ion Polarization Work
Summary of Working Group 1
Compensation of Detector Solenoids
Progress Update on the Electron Polarization Study in the JLEIC
Summary and Plan for Electron Polarization Study in the JLEIC
Multiple Partial Siberian Snakes
Report on Electron Polarization Study
Status of RCS eRHIC Injector Design
Presentation transcript:

Haixin Huang AGS Cold Snake: Status and Plans

Operation Plan Start with cold snake at 15% and warm snake at 5%. Polarized source starts operation before Nov. 14. LINAC operation starts on Nov. 14. Source polarization tuning starts around Nov. 20. Booster and AGS beam tuning starts Nov. 21. No operation on Thanksgiving Day. AGS polarization setup starts on Nov. 25. Polarized beam available for RHIC on Dec. 12. Drawback solution: run cold snake only. The second drawback solution: warm snake + AC dipole.

Status of hardware Cold snake cryo: the 3 rd relieve valve was added. The burst disk was moved outside the ring, so a ring access is not needed if a quench happens during operation. Cooling down of the cold snake has started Monday with Nitrogen. It is estimated that it will take three weeks before we can switch to Helium (then it is a matter of days to reach operation temperature). The cold snake correction quads remain to be four, the same as the end of last run, but the inner two quads will have opposite signs. Horizontal sextupoles is ready for higher current to push horizontal chromaticity to zero. Quad P/S fixed to reach 700A, required to achieve higher vertical tunes at high energies. AC dipole : use revolution frequency instead of a “fixed” frequency.

Quads for Warm Snake We did not have any correction quad for the warm snake last run. We plan to add four quads. Two inner ones are new thin quads and the two outer ones are backleg winding on the existing quads. We need new power supplies, new cables, and new controls. –Cable pulling is expected to be done before Oct. 25. –Start P/S work in the middle of October. –Control group is working on the new application. –New magnets are scheduled to be installed by Nov. 18. P/S test will follow. –The P/S for the outer two quads at warm snake may start without filters.

Simulation and Modeling Build AGS online model to deal with the complicated optical control of AGS after insertion of snakes. (Kevin) Spin tracking of the effect of horizontal resonances. There is already simple model to calculate the horizontal resonance effect. Simulations with more realistic model (with two snakes, synchrotron motion considered) is underway. (Fanglei) Spin tracking of the early part of the energy ramp (with vertical tune ramping the same time). Ideally, the correction strength should scale with 1/p^2. The quad strengths can be optimized for each eneriges, but some strengths are not scaled as expected. Work continues. (Nick, Alfredo, Ernest).

Qx=8.7, Qy=8.98 AGS Injection Lattice

AGS CNI Polarimeter Add horizontal target to provide vertical polarization profile. The work will finish later this month. (Alan,Tony) Plan to add 45 degree Si detectors. (Tony, Sandro) All electronics are out for modification and expected to be back in two weeks. (Tony, Sandro) Automatic target scan has been tested succesfully before the hardware is dissembled. (Seth) Upgrade the DAQ to fast readout. (Kin, Jeff, Yuke, Igor [remotely]). –A new PC has been used for the test. –It is a copy of RHIC fast readout but some code change is necessary (AGS uses external clock). –WFD memory test with external clock is a critical test.