ASAS Thematic Network II First Workshop Savoy Hotel, Malmö.

Slides:



Advertisements
Similar presentations
Delivering as One UN Albania October 2009 – Kigali.
Advertisements

The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
RCC meeting Monitoring implementation of network codes TITRE 18/10/2012 RCC meeting First thoughts on project approach for monitoring implementation of.
Regular process for global reporting and assessment of the state of the marine environment, including socio-economic aspects Taking forward Global Oceans.
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
With the Support of the TEMPUS programme of the European Union Information on PRIUM: Promoting a model of Integrated University in the fYR of Macedonia.
José Manuel Fresno EURoma meeting Budapest, 8 November 2011.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
This project is funded by the European Union M EDSTAT II  Euro-Mediterranean Statistical Co-operation Introduction and objectives of the training session.
Company LOGO NELLIP Network of Language Label Projects and Initiatives Intercultural Horizons Conference, Siena, 7 October 2013.
RENCP ECCD Working Group Updates Period: October 2013-January 2014 RENCP General Assembly 19 th February 2014 Presenter: Peter NZEYIMANA ECCD Programme.
The project managed by D4.3N1: EW-OTH-GCI-0050.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Interoperability of Spatial Data Sets and Services Data quality and Metadata: what is needed, what is feasible, next steps Interoperability of Spatial.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
UNDAF for Beginners. 2 2 Strategic programme framework Describes the collective response and support of the UN System to national development priorities.
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) 1 st Innovation Dialogue Forum Becici, 8-9 November 2010.
The Poverty Environment Initiative (PEI) in the Asia Pacific Region Draft Outline of the Regional Strategy.
EHealth Interoperability – EU Commission activities Dr Octavian Purcarea Unit H1 – ICT for Health Directorate ICT for citizens and businesses DG INFSO.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS Thematic Network First Workshop Outcome Eric Hoffman 6-8th October Malmö.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
European and North Atlantic Office ICAO Regional Workshop Language Proficiency Requirements Paris September 2006 ELPAC English language Proficiency for.
2 nd Workshop, April 2006 Session 4: Integrating ASAS in an evolving ATM system.
Achievements Work Package 1 Achievements Work Package 6: Support the Commission with the overall coordination of the programme.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Changing the way the New Zealand Aid Programme monitors and evaluates its Aid Ingrid van Aalst Principal Evaluation Manager Development Strategy & Effectiveness.
Work Package 6 2nd Consortium meeting, Provincia di Reggio Emilia, 3rd May.2011 Blaz Jemensek, PIL Klemen Gostic, PIL.
The European Organisation for the Safety of Air Navigation V & V Some lessons learned in Europe FAA V&V Symposium, Atlantic City, October 2010 Nigel.
This research has received funding from the European Community’s Seventh Framework Programme (FP7/ ) under grant agreement No WP3 update.
ASAS Opportunities SESAR and NextGen. SESAR D4 Time is very short – we only have until the end of October Lines of Change, Operational Improvements and.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
COG/ATM/TNG/TF SPECIAL ICAO WORKSHOP ON LANGUAGE PROFICIENCY FOR THE STATES FROM THE EASTERN PART OF THE ICAO EUR REGION (Baku, Azerbaijan, 7-9 December.
4 th Workshop, Amsterdam, April 2007 Progress since 2003 First workshop in 2003 (Rome) Large number of successful R&D projects in US and Europe.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
ENRD Contact Point Mike Gregory, Urszula Budzich-Tabor, Brussels, 18 November 2014, Meeting with a LEADER delegation from Ireland.
Activity Report and Future Planning. European thematic work 2006 Main priorities: 1.Gather and analyze "good practice" and general information on operations.
ASAS Thematic Network ASAS Now!.
WP 7 – Dissemination and Network Development
Chris Shaw, EUROCONTROL Experimental Centre
Chris Shaw, EUROCONTROL Experimental Centre
First thoughts on project approach for monitoring implementation of network codes Programme Office RCC meeting TITRE 18/10/2012.
DG Environment, Unit D.2 Marine Environment and Water Industry
Purpose and Structure of the Workshop
DIMESA View from ENV 15/06/2006 Coordination at European level: "Group of 4" – Data Centres – ESS/EIONET Timo Makela Sustainable Development and.
First Workshop ASAS Benefits - Dream or Reality?
First thoughts on project approach for monitoring implementation of network codes Programme Office RCC meeting TITRE 18/10/2012.
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Strategy for Statistical Cooperation in the ENP-East Region,
Review of Decision 2010/477/EU and MSFD Annex III
Vanda Nunes de Lima 18th June 2009
SNA Work Plan and Budget Revision 2015 (additional activities)
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Francesca M. SOMMA - EC - DG JRC MSCG Meeting – Brussels,
Directorate-General Energy and Transport
Progress Drafting Group on Environmental Objectives and Exemptions
WP5 Forthcoming Evaluations
Exemptions and Disproportionate Costs
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

ASAS Thematic Network II First Workshop Savoy Hotel, Malmö

Summary of discussions Progress DG TREN message Key issues Next workshop

Progress Standards Major manufacturers Simulations, trials & demonstrations

DG TREN message EC remains committed to ASAS Position ASAS into SESAME Master plan. Need to show benefit to achieve implementation – area for focus?

Key issues (1) ASAS is not stand alone - an integrated part of the ATM system The RFG process feeding into RTCA/EUROCAE and then into ICAO is happening Work from NUP & other programmes needs to be updated to reflect RFG outputs Validation: an integrated ATM element. SESAME should take into account RFG outputs.

Key issues (2) An ADS-B-OUT rich environment therefore: -NRA in Scandinavia, Ireland, Spain-Canaries and Mediterranean region should be operational as soon as possible. -ADS-B-IN in Pacific, in Atlantic -TMA Cost benefit studies should be used to drive common equipage Working towards implementation decision making

Key issues (3) Coherence needs to be achieved between the Airbus/Boeing common view & road map, and current ASAS work ATSAW: Situation Awareness is not an end in itself, the information must be directed at specific tasks Keep it simple AND make it work for the human operators Packages 2 & 3 coordinated research programme now!!

Workshop report development TN2 first report draft Available to attendees 14 th October Attendee comments by 28 th October Final report 18 th November Available with slides on

Date of next workshop Roma, 3-5 April 2006

Thank you European Commission LFV AerotechTelub The ASAS TN2 Team The Savoy hotel