LIGO- G040460-00-M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004.

Slides:



Advertisements
Similar presentations
LIGO-G D Quiet Hydraulics Board: Purpose, Scope, Charter and Plans Dennis Coyne Kick-off Stanford, 16 Oct 2003.
Advertisements

G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
LIGO- G M State of the LIGO Lab Stan Whitcomb LSC meeting Hanford 17 August 2004.
LIGO- G W LIGO Update by Fred Raab Local Educators Network LIGO Hanford Observatory October 27, 2005.
LIGO-G W LIGO Laboratory1 Educational Outreach Across LIGO Funding source: »LIGO operations »IPSE proposal submitted in 2003 (pending) »Advanced.
11/ LIGO-G G LIGO Education and Outreach November 2008 Dale Ingram LIGO Hanford Observatory
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G M LIGO Status and Plans Barry Barish LSC Meeting 19-Aug-02.
G D Interferometer Status LSC Meeting, Ann Arbor, June 4, 2005 Daniel Sigg.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
LIGO-G M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities.
LIGO-G L Peter Fritschel & Michael Zucker PAC18 meeting LIGO Livingston Observatory 18 May 2005 S5 Run Performance Goals.
LIGO-G M State of LIGO Barry Barish LSC Meeting LLO Hanford, WA 10-Nov GEO -- L 2km -- H 4km -- L 4km h0h0 S1 sensitivities.
LIGO-G D Installation and Commissioning Status Stan Whitcomb Program Advisory Committee 14 June 2001 Caltech.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
LIGO G M Introduction to LIGO Stan Whitcomb LIGO Hanford Observatory 24 August 2004.
LIGO-G L LIGO Livingston Observatory Mark Coles Observatory Head LIGO Livingston Observatory California Institute of Technology.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
LIGO-G M LIGO Overview and Status Stan Whitcomb NSF Annual Review 9 November 2005 Caltech.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
19 Aug 2003, LSC Hannover G Z1 State of the LSC Peter Saulson Syracuse University.
LIGO-G M Major International Collaboration in Advanced LIGO R&D Gary Sanders NSF Operations Review Hanford February, 2001.
LIGO-G M Management and Operation Plans/Budget Stan Whitcomb NSF Annual Review 8 November 2004 Caltech.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
LIGO-G M State of the LIGO Project Gary Sanders LIGO Laboratory / Caltech LSC Meeting, LLO March, 2003.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
1 Feedback from the executive committee meeting Benno Willke GEO meeting, Glasgow October 2006.
G R 1 Advanced LIGO Update David Shoemaker LSC LHO March 2006.
LIGO-G M Status of Some Aspects of LIGO Jay Marx LSC meeting Hanford March 20, 2006.
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
Update on Activities in Suspensions for Advanced LIGO Norna A Robertson University of Glasgow and Stanford University LSC meeting, Hanford, Aug 20 th 2002.
LIGO-G D LSC Meeting Nov An Early Glimpse at the S3 Run Stan Whitcomb (LIGO–Caltech) LIGO Scientific Collaboration Meeting LIGO Hanford.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
Advanced LIGO Status Report
Status of LIGO Andri M. Gretarsson Livingston Observatory LIGO-G L.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO - G M Update from LIGO Laboratory LIGO-Virgo Collaboration Meeting Albert Lazzarini Cascina, Italy May 22-25, 2007.
LIGO-G Z The LIGO Scientific Collaboration Peter R. Saulson NSB Site Visit LIGO Livingston Observatory 4 February 2004.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
Science Education Center Outreach Program 1 LIGO LIGO Science Education Center: Partnering Research Labs Universities Education Agencies Informal Learning.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
G R LIGO R&D1 Advanced LIGO Update David Shoemaker LSC LHO August 2004.
LIGO-G M State of the LIGO Laboratory Gary Sanders LIGO/Caltech LSC Meeting, LLO March 16, 2004 State of LIGO.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
Prospects and plans : LIGO interferometers Michael Landry LIGO Hanford Observatory LSC meeting, MIT Nov 4-5, 2006.
October 2006, LIGO Hanford Observatory
Reaching the Advanced LIGO Detector Design Sensitivity
Status of Virgo GWDAW Dec 13-16
Installation and Commissioning Status Stan Whitcomb
Status of the LIGO Detectors
R&D Highlights Seismic Isolation Suspensions ISC/40m
Stan Whitcomb LSC meeting Livingston 21 March 2005
Virgo Update – LSC meeting
The Laser Interferometer Gravitational-Wave Observatory
Stan Whitcomb LSC meeting Hanford 15 August 2005
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
The Next Generation: Advanced LIGO
Presentation transcript:

LIGO- G M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004

LIGO- G M Oversight Committee -- October Summary Science Run Metrics RUN  S1S2S3 IFO  BNS RANGE (kpc) DUTY FACTOR (%) BNS RANGE (kpc) DUTY FACTOR (%) BNS RANGE (kpc) DUTY FACTOR (%) L1~15043%90037% % H1~3059%35074% % H2~4073%20058% % 3-way24%22%16%

LIGO- G M Oversight Committee -- October Noise Improvements at LHO

LIGO- G M Oversight Committee -- October HAM BSC External Pre-Isolators Seismic Remediation at LLO

LIGO- G M Oversight Committee -- October HEPI Performance—One Arm Test Success

LIGO- G M Oversight Committee -- October Advanced LIGO R&D Highlights Seismic Isolation »Successful implementation of HEPI »Further commissioning of platform at Stanford Suspensions »Installation of Mode Cleaner triple suspension at LASTI ISC/40m »Completed installation, locked lots of bits »Found problem with locking scheme (sidebands on sidebands)….probably found solution (Mach-Zehnder)

LIGO- G M Oversight Committee -- October Advanced LIGO R&D Highlights Pre-stabilized laser »Power Stage injection locked »170 W, single frequency laser! Coatings »Reductions in absorption with increasing dopant in Titania (LMA) »Need another factor 2-3 reduction… Auxiliary Optics/Thermal compensation »Successful application to initial LIGO »Analysis includes inhomogeneity of coating absorption – important for substrate selection

LIGO- G M Oversight Committee -- October AdvLIGO Status as a Project Advanced LIGO proposal submitted in early 2003 and was reviewed in June 2003 Reviews very favorable NSB discussion/approval Oct 14, 2004 Earliest MREF funding start FY 2007 (Oct 2006) Depends critically on future funding levels for NSF Developing detailed project management data (cost, schedule, technical work packages) Advanced LIGO organization interacts with up-coming Lab operations renewal, evolving relation between Lab and LSC

LIGO- G M Oversight Committee -- October LIGO Outreach Activities New outreach coordinators at both observatories »Dale Ingram at LHO »John Thacker at LLO National Astronomy Day at LHO School Group Tour at LLO

LIGO- G M Oversight Committee -- October LIGO Outreach Collaboration Newly funded collaborative effort focused on Louisiana »LIGO provides scientific motivation and constructs/operates visitor center »Exploratorium provides hands-on exhibits, experience with interactive learning, teacher workshops »Southern University brings LIGO science to science education, training for pre-service teachers »Louisiana Board of Regents extends our program through public education, provides links to schools and teachers

LIGO- G M Oversight Committee -- October Plan for S4 Goal to have more flexibility to react to conditions as we approach and initiate the run Peter Fritschel chairs run planning committee »Representatives from commissioning, GEO, LSC, Lab, … »Recommends timing, duration, goals for run »Ability to delay or modify run if conditions warrant Tentative plan »S4 to be held starting in early 2005, ~ 4 weeks duration »Engineering run(s) approximately 1 month in advance »Sensitivity goals: H1 7.5 Mpc, L1 4Mpc, H2, 2 Mpc »Duty cycle goal: All Individuals 70%, triple 40% »“Science content” ~ 5-10 times S3 ~6 month commissioning interval, followed by long S5 (latter half of 2005)